(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20097J5261995-09-22022 September 1995 Forwards Suppl Rept,Consisting of New App C & Final Revised Page Revs to Reactor Decommissioning Rept & Final Status Surveys for Facility Transmitted by ML20091G5821995-06-0202 June 1995 Responds to Request for Addl Info Re Final Status Survey Rept ML20097J5121994-12-20020 December 1994 Forwards Reactor Decommissioning Rept & Final Status Surveys in Accordance W/Approved Decommissioning Plan.All Survey Data Confirms That Facility Meets Release Criteria for Unrestricted Use Established in Decommissioning Plan ML20076K8791994-10-26026 October 1994 Provides NRC W/Certain Info Re Progress Made in Implementing NRC Approved Decommissioning Plan for Equipment & Facility Associated W/License R-31 ML20058L4671993-12-0808 December 1993 Forwards Insp Rept 50-077/93-02 on 931104 & 05.No Violations Noted.Understands Revised Schedule of Target Dates for Decommissioning Plan Will Be Forwarded to NRC by 931130 ML20092C8081992-02-0606 February 1992 Forwards Decommissioning Plan Catholic Univ of America, Radiation Safety Manual,Catholic Univ of America, Catholic Univ of America Chemical Matls Safety Manual & Tech Specs ML20087A1901991-12-19019 December 1991 Submits Info Re Reactor Decommissioning Schedule & Forwards Catholic Univ of America Annual Rept of Reactor-Related Activities for CY91 ML20073C0121991-04-19019 April 1991 Advises of Estimated Cost of Decommissioning Reactor in Response to .Estimated Cost Breakdown Shown in Listed Table ML20071A0331991-03-15015 March 1991 Submits Tentative Timetable for Establishment of Schedule for Decommissioning Reactor,In Partial Response to .Submittal of Reactor Decommissioning Plan Delayed Until 911231 ML20070H1021991-03-11011 March 1991 Responds to NRC Re Violations Noted in Insp of License R-31 on 910114-15.Corrective Actions:Quarterly Inventory & Surveillance Will Be Incorporated Into Schedule & Bldg Fire Alarm Will Be Tested in Connection W/Drill ML20055G4401990-07-12012 July 1990 Advises That 880727,891220,900126,0208 & 0504 Changes to Physical Security Plan Consistent w/10CFR50.54(p) & Acceptable for Inclusion Into Plan.Plan Withheld ML20042F3381990-05-0404 May 1990 Forwards Replacement Page 13-15 (Rev May 90) to Security Plan.Page Withheld ML20006D9281990-02-0808 February 1990 Forwards Replacement Page 13-15 to Security Plan.Encl Withheld ML19354E3691990-01-26026 January 1990 Forwards Rev to Security Plan.Rev Withheld ML20005D8141989-12-20020 December 1989 Forwards Rev to Reactor Security Plan,Reflecting Previously Approved Change in Status of License to Possession Only & Amend Submittal of 880727,requesting Approval for Reduction in Reactor Facility Boundary.Encl Withheld ML20245B4531989-06-0808 June 1989 Forwards Encl Listed Info on Decommissioned & Shutdown Reactors Requested During Discussions at Saxton on 890511 ML20195J9981988-12-0202 December 1988 Forwards Fuel Transfer Plan for AGN-201 Research & Test Reactor.Plan Withheld (Ref 10CFR2.790) ML20153D4251988-04-29029 April 1988 Forwards Insp Rept 50-077/88-01 on 880314.No Violations Noted.Number of Unresolved Issues Identified.Issues Will Remain as Unresolved Items Pending NRC Approval of Proposed License Changes ML20150D9721988-03-18018 March 1988 Informs of NRC Relocation to Stated Address.Mailing Address Unchanged.A Adams Project Manager & TS Michaels back-up Project Manager ML20238F4501987-09-10010 September 1987 Forwards 860714 Memo Appointing WE Keene as Reactor Administrator,Relieving ED Jordan of All Related Duties, Including Decommissioning of Facility ML20214S2711987-05-27027 May 1987 Informs of Realignment within NRC Region I Div of Reactor Projects Affecting Responsibility for Insp of Research & Test Reactor Facilities ML20141A1381986-03-27027 March 1986 Informs That TC Elsasser Will Replace EC Mccabe as Section Chief for Facility.Author Will Retain Responsibility as Branch Chief ML20199F4881986-03-20020 March 1986 Advises That 860127 Shipment of Spent Fuel Made W/O Proper License.Nrc Approved QA Program for Radiation Matl Packages Expired on 851231 & No Renewal Request Submitted Before License Expiration Per 10CFR2.106 ML20154K1571986-03-0505 March 1986 Forwards Amend 9 to License R-31 & Safety Evaluation.Amend Changes Tech Specs to Authorize Possession Only Status During Decommissioning Plans ML20138R2471985-11-0505 November 1985 Responds to NRC Re Violations Noted in Insp Rept 50-077/85-01.Corrective Actions:Alternate Reactor Administrator Appointed to Ensure Access at All Times to Records ML20138D9281985-10-21021 October 1985 Confirms 851001 Telcon Clarifying Transfer of Up to 701 G U-235,enriched to 20% UO2 & Embedded in Polyethylene,To DOE Facilities ML20135H7951985-09-23023 September 1985 Clarifies Position Re Commitment to Apply for Decommissioning W/O possession-only Status Discussed During 850904 Meeting.J Dosa Summary of Meeting Incorrectly States That Application for possession-only Amend to Be Submitted ML20135J1021985-09-20020 September 1985 Advises That 850722 Rev to Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20128P9991985-07-23023 July 1985 Forwards Safety Insp Rept 50-077/85-01 on 850604 & Notice of Violation.Meeting to Discuss Results of Insp & to Reach Agreement on Resolution of Administrative Controls Issue Suggested ML20133B5401985-07-22022 July 1985 Notifies of Intent to Issue Key to Faculty Member in Dept of Biology to Provide Unaccompanied Access to Cs-137 Irradiator,Per 850711 Telcon ML20097E2631984-08-29029 August 1984 Advises That Reactor Currently in Shutdown Mode,In Response to 840703 ltr.Fuel-bearing Control Rods Removed & Secured.Emergency Plan Needs Will Be Addressed When Licensee Requests Permission to Become Operational ML20072G1731983-06-13013 June 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-077/83-02.Corrective Actions:Reactor Safety Committee Will Meet at Least Twice Each Yr ML20097E2761983-04-0808 April 1983 Advises That Licensee in Process of Changing Status of Reactor from Operational Mode to Temporary Shutdown Mode, Effective 830531.Fuel-containing Control Rods Will Be Removed & Stored in Locked Safe ML20028F3171983-01-14014 January 1983 Submits Public Version of Advice That Present Emergency Plan Meets Revised Requirements of 10CFR50 ML20054K7561982-06-18018 June 1982 Forwards IE Safeguards Insp Repts 50-077/82-01 & 70-0190/82-01 on 820512.No Noncompliance Noted ML20054L3881982-06-16016 June 1982 Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl ML20042C3871982-03-22022 March 1982 Forwards 1981 Annual Rept of Nuclear Reactor Operations. ML20008F4111981-03-0606 March 1981 Forwards Organization Chart Per NRC Telcon Re Licensee 791115 Ltr.Change to Tech Specs 16.6.1.2 Re Provost Requested ML20149K1911980-05-0707 May 1980 Generic Ltr 80-38 to All Nonpower Reactor Licensees Re NPR Physical Protection Requirements.Summary of Certain NPR Physical Protection Requirements Encl & Should Aid in Determining Safeguards Requirements Applicable to Facility ML19305B7781980-03-14014 March 1980 Forwards 1979 Annual Rept of Nuclear Reactor Operations. ML19296E0241979-12-18018 December 1979 Responds to NRC 791211 Ltr Re Violations Noted in IE Insp Rept 50-077/79-03.Corrective Actions:Notices Have Been Posted in Reactor Room & Radioisotopes Lab ML19294B4991979-12-17017 December 1979 Requests That Portions of IE Investigation 50-077/79-02 Be Withheld from Pdr.Info Could Negatively Impact Security Plan ML19210C9781979-11-15015 November 1979 Notifies of Tech Spec Change Re Separation of Ofcs of Executive Vice President & Provost ML19209D0751979-10-17017 October 1979 Forwards Amend 10 to Indemnity Agreement E-2,amending Article 1,Paragraph 4 ML19209B6871979-10-0404 October 1979 Forwards Allegations Made by K Fitzpatrick,Univ Student,To ED Pellegrino,President of Univ Re Security & Safety Procedures Near Reactor ML19209B9871979-09-28028 September 1979 Forwards Reactor Restart Rept. ML19270F0741979-01-0505 January 1979 Forwards Amend 1 to FSAR ML20147E5971978-10-10010 October 1978 Responds to NRC .Draft Tech Specs Reviewed & Acceptable ML20137G4721971-06-23023 June 1971 Advises That Presence & Irradiation of Explosives in Reactor Must Be Evaluated Due to Potential for Damage to Reactor. Evaluation Requested Establishing Operating Restrictions,Max Quantity of Explosives Allowed in Facility & Form 1995-09-22
[Table view] Category:EDUCATIONAL INSTITUTION TO NRC
MONTHYEARML20042F3381990-05-0404 May 1990 Forwards Replacement Page 13-15 (Rev May 90) to Security Plan.Page Withheld ML20006D9281990-02-0808 February 1990 Forwards Replacement Page 13-15 to Security Plan.Encl Withheld ML19354E3691990-01-26026 January 1990 Forwards Rev to Security Plan.Rev Withheld ML20005D8141989-12-20020 December 1989 Forwards Rev to Reactor Security Plan,Reflecting Previously Approved Change in Status of License to Possession Only & Amend Submittal of 880727,requesting Approval for Reduction in Reactor Facility Boundary.Encl Withheld ML20195J9981988-12-0202 December 1988 Forwards Fuel Transfer Plan for AGN-201 Research & Test Reactor.Plan Withheld (Ref 10CFR2.790) ML20238F4501987-09-10010 September 1987 Forwards 860714 Memo Appointing WE Keene as Reactor Administrator,Relieving ED Jordan of All Related Duties, Including Decommissioning of Facility ML20138R2471985-11-0505 November 1985 Responds to NRC Re Violations Noted in Insp Rept 50-077/85-01.Corrective Actions:Alternate Reactor Administrator Appointed to Ensure Access at All Times to Records ML20135H7951985-09-23023 September 1985 Clarifies Position Re Commitment to Apply for Decommissioning W/O possession-only Status Discussed During 850904 Meeting.J Dosa Summary of Meeting Incorrectly States That Application for possession-only Amend to Be Submitted ML20133B5401985-07-22022 July 1985 Notifies of Intent to Issue Key to Faculty Member in Dept of Biology to Provide Unaccompanied Access to Cs-137 Irradiator,Per 850711 Telcon ML20097E2631984-08-29029 August 1984 Advises That Reactor Currently in Shutdown Mode,In Response to 840703 ltr.Fuel-bearing Control Rods Removed & Secured.Emergency Plan Needs Will Be Addressed When Licensee Requests Permission to Become Operational ML20072G1731983-06-13013 June 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-077/83-02.Corrective Actions:Reactor Safety Committee Will Meet at Least Twice Each Yr ML20097E2761983-04-0808 April 1983 Advises That Licensee in Process of Changing Status of Reactor from Operational Mode to Temporary Shutdown Mode, Effective 830531.Fuel-containing Control Rods Will Be Removed & Stored in Locked Safe ML20028F3171983-01-14014 January 1983 Submits Public Version of Advice That Present Emergency Plan Meets Revised Requirements of 10CFR50 ML20042C3871982-03-22022 March 1982 Forwards 1981 Annual Rept of Nuclear Reactor Operations. ML20008F4111981-03-0606 March 1981 Forwards Organization Chart Per NRC Telcon Re Licensee 791115 Ltr.Change to Tech Specs 16.6.1.2 Re Provost Requested ML19305B7781980-03-14014 March 1980 Forwards 1979 Annual Rept of Nuclear Reactor Operations. ML19296E0241979-12-18018 December 1979 Responds to NRC 791211 Ltr Re Violations Noted in IE Insp Rept 50-077/79-03.Corrective Actions:Notices Have Been Posted in Reactor Room & Radioisotopes Lab ML19294B4991979-12-17017 December 1979 Requests That Portions of IE Investigation 50-077/79-02 Be Withheld from Pdr.Info Could Negatively Impact Security Plan ML19210C9781979-11-15015 November 1979 Notifies of Tech Spec Change Re Separation of Ofcs of Executive Vice President & Provost ML19209D0751979-10-17017 October 1979 Forwards Amend 10 to Indemnity Agreement E-2,amending Article 1,Paragraph 4 ML19209B6871979-10-0404 October 1979 Forwards Allegations Made by K Fitzpatrick,Univ Student,To ED Pellegrino,President of Univ Re Security & Safety Procedures Near Reactor ML19209B9871979-09-28028 September 1979 Forwards Reactor Restart Rept. ML19270F0741979-01-0505 January 1979 Forwards Amend 1 to FSAR ML20147E5971978-10-10010 October 1978 Responds to NRC .Draft Tech Specs Reviewed & Acceptable 1990-05-04
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20097J5261995-09-22022 September 1995 Forwards Suppl Rept,Consisting of New App C & Final Revised Page Revs to Reactor Decommissioning Rept & Final Status Surveys for Facility Transmitted by ML20091G5821995-06-0202 June 1995 Responds to Request for Addl Info Re Final Status Survey Rept ML20097J5121994-12-20020 December 1994 Forwards Reactor Decommissioning Rept & Final Status Surveys in Accordance W/Approved Decommissioning Plan.All Survey Data Confirms That Facility Meets Release Criteria for Unrestricted Use Established in Decommissioning Plan ML20076K8791994-10-26026 October 1994 Provides NRC W/Certain Info Re Progress Made in Implementing NRC Approved Decommissioning Plan for Equipment & Facility Associated W/License R-31 ML20092C8081992-02-0606 February 1992 Forwards Decommissioning Plan Catholic Univ of America, Radiation Safety Manual,Catholic Univ of America, Catholic Univ of America Chemical Matls Safety Manual & Tech Specs ML20087A1901991-12-19019 December 1991 Submits Info Re Reactor Decommissioning Schedule & Forwards Catholic Univ of America Annual Rept of Reactor-Related Activities for CY91 ML20073C0121991-04-19019 April 1991 Advises of Estimated Cost of Decommissioning Reactor in Response to .Estimated Cost Breakdown Shown in Listed Table ML20071A0331991-03-15015 March 1991 Submits Tentative Timetable for Establishment of Schedule for Decommissioning Reactor,In Partial Response to .Submittal of Reactor Decommissioning Plan Delayed Until 911231 ML20070H1021991-03-11011 March 1991 Responds to NRC Re Violations Noted in Insp of License R-31 on 910114-15.Corrective Actions:Quarterly Inventory & Surveillance Will Be Incorporated Into Schedule & Bldg Fire Alarm Will Be Tested in Connection W/Drill ML20042F3381990-05-0404 May 1990 Forwards Replacement Page 13-15 (Rev May 90) to Security Plan.Page Withheld ML20006D9281990-02-0808 February 1990 Forwards Replacement Page 13-15 to Security Plan.Encl Withheld ML19354E3691990-01-26026 January 1990 Forwards Rev to Security Plan.Rev Withheld ML20005D8141989-12-20020 December 1989 Forwards Rev to Reactor Security Plan,Reflecting Previously Approved Change in Status of License to Possession Only & Amend Submittal of 880727,requesting Approval for Reduction in Reactor Facility Boundary.Encl Withheld ML20195J9981988-12-0202 December 1988 Forwards Fuel Transfer Plan for AGN-201 Research & Test Reactor.Plan Withheld (Ref 10CFR2.790) ML20238F4501987-09-10010 September 1987 Forwards 860714 Memo Appointing WE Keene as Reactor Administrator,Relieving ED Jordan of All Related Duties, Including Decommissioning of Facility ML20138R2471985-11-0505 November 1985 Responds to NRC Re Violations Noted in Insp Rept 50-077/85-01.Corrective Actions:Alternate Reactor Administrator Appointed to Ensure Access at All Times to Records ML20135H7951985-09-23023 September 1985 Clarifies Position Re Commitment to Apply for Decommissioning W/O possession-only Status Discussed During 850904 Meeting.J Dosa Summary of Meeting Incorrectly States That Application for possession-only Amend to Be Submitted ML20133B5401985-07-22022 July 1985 Notifies of Intent to Issue Key to Faculty Member in Dept of Biology to Provide Unaccompanied Access to Cs-137 Irradiator,Per 850711 Telcon ML20097E2631984-08-29029 August 1984 Advises That Reactor Currently in Shutdown Mode,In Response to 840703 ltr.Fuel-bearing Control Rods Removed & Secured.Emergency Plan Needs Will Be Addressed When Licensee Requests Permission to Become Operational ML20072G1731983-06-13013 June 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-077/83-02.Corrective Actions:Reactor Safety Committee Will Meet at Least Twice Each Yr ML20097E2761983-04-0808 April 1983 Advises That Licensee in Process of Changing Status of Reactor from Operational Mode to Temporary Shutdown Mode, Effective 830531.Fuel-containing Control Rods Will Be Removed & Stored in Locked Safe ML20028F3171983-01-14014 January 1983 Submits Public Version of Advice That Present Emergency Plan Meets Revised Requirements of 10CFR50 ML20042C3871982-03-22022 March 1982 Forwards 1981 Annual Rept of Nuclear Reactor Operations. ML20008F4111981-03-0606 March 1981 Forwards Organization Chart Per NRC Telcon Re Licensee 791115 Ltr.Change to Tech Specs 16.6.1.2 Re Provost Requested ML19305B7781980-03-14014 March 1980 Forwards 1979 Annual Rept of Nuclear Reactor Operations. ML19296E0241979-12-18018 December 1979 Responds to NRC 791211 Ltr Re Violations Noted in IE Insp Rept 50-077/79-03.Corrective Actions:Notices Have Been Posted in Reactor Room & Radioisotopes Lab ML19294B4991979-12-17017 December 1979 Requests That Portions of IE Investigation 50-077/79-02 Be Withheld from Pdr.Info Could Negatively Impact Security Plan ML19210C9781979-11-15015 November 1979 Notifies of Tech Spec Change Re Separation of Ofcs of Executive Vice President & Provost ML19209D0751979-10-17017 October 1979 Forwards Amend 10 to Indemnity Agreement E-2,amending Article 1,Paragraph 4 ML19209B6871979-10-0404 October 1979 Forwards Allegations Made by K Fitzpatrick,Univ Student,To ED Pellegrino,President of Univ Re Security & Safety Procedures Near Reactor ML19209B9871979-09-28028 September 1979 Forwards Reactor Restart Rept. ML19270F0741979-01-0505 January 1979 Forwards Amend 1 to FSAR ML20147E5971978-10-10010 October 1978 Responds to NRC .Draft Tech Specs Reviewed & Acceptable 1995-09-22
[Table view] |
Text
l\,
THE CATHOLIC UNIVERSITY OFAMERICA I WASHINGTON D.C. 20064 RADIOLOGICAL SAFETY OFFICE Pangborn llall 202 dxat 635-5206 10 September 1987 USNRC Attn: Document Control Desk Docket: 50.77 washington DC 20555 Gentlemen:
Enclosed is a copy of Catholic University, Executive Vice President, memorandum of 14 July 1986, which appointed me Reactor Administrator, relieving Dr. Edward D. Jordan of all related duties.
Cb k "
Warrem E. Keene Radiological Safety Officer, and Reactor Administrator ENCL 00 8709160165 870910 PDR ADOCK 05000077 1\
p PDR
A) R c.
,h l -
L 1rtue l
cath.olic .
N! b!
- d Office of the Executive Vice President A July 14, 1986 Washington. DC. 20064 en h!
Cr TO: Mr. Warren E. Keene .b Radiological Saf ety Of ficer .'
PROM: John Joseph Murphy T/ yth
/
r, r,
Executive Vice President h {l g
SUBJECT:
Appointment as Reactor Administrator Effective immediately, you are hereby appointed to the position of Reactor Administrator, relieving Dr.
Edward D. Jordan. The duties of the position are in addition to your duties as Radiological Saf ety Of ficer. !
You will complete, as soon as practicable, the process of j decommissioning the University's AGN-201 Research and '
Training Reactor, and the return of its fuel to the custody of the appropriate United States government agency.
You will make and retain, for the University, all records of the position which are required by law, ,
license, or regulation. You will submit, for the University, all reports pertinent to the reactor which may be required by law; license or regulation, except f or such reports as may require the signature of an executive of .
the University - which shall be prepared for the signature L of the Executive Vice President.
Funds f or necessary expenses incident to the decommissioning will be made available by this office.
You are requested to provide timely advice of your requirements f or substantial expenses.
By copy of this memorandum, Dr. Edward D. Jordan is directed to turn over to Mr. Keene, all records held which are pertinent to the position of Reactor Adminis-trator.
cc: President Byron Sr. Donley Dr. Jordan Mr. McClaren Mr. Goldston Mr. Banks