Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20042F3384 May 1990Forwards Replacement Page 13-15 (Rev May 90) to Security Plan.Page Withheld
ML20006D9288 February 1990Forwards Replacement Page 13-15 to Security Plan.Encl Withheld
ML19354E36926 January 1990Forwards Rev to Security Plan.Rev Withheld
ML20005D81420 December 1989Forwards Rev to Reactor Security Plan,Reflecting Previously Approved Change in Status of License to Possession Only & Amend Submittal of 880727,requesting Approval for Reduction in Reactor Facility Boundary.Encl Withheld
ML20195J9982 December 1988Forwards Fuel Transfer Plan for AGN-201 Research & Test Reactor.Plan Withheld (Ref 10CFR2.790)
ML20238F45010 September 1987Forwards 860714 Memo Appointing WE Keene as Reactor Administrator,Relieving ED Jordan of All Related Duties, Including Decommissioning of Facility
ML20138R2475 November 1985Responds to NRC Re Violations Noted in Insp Rept 50-077/85-01.Corrective Actions:Alternate Reactor Administrator Appointed to Ensure Access at All Times to Records
ML20135H79523 September 1985Clarifies Position Re Commitment to Apply for Decommissioning W/O possession-only Status Discussed During 850904 Meeting.J Dosa Summary of Meeting Incorrectly States That Application for possession-only Amend to Be Submitted
ML20133B54022 July 1985Notifies of Intent to Issue Key to Faculty Member in Dept of Biology to Provide Unaccompanied Access to Cs-137 Irradiator,Per 850711 Telcon
ML20097E26329 August 1984Advises That Reactor Currently in Shutdown Mode,In Response to 840703 ltr.Fuel-bearing Control Rods Removed & Secured.Emergency Plan Needs Will Be Addressed When Licensee Requests Permission to Become Operational
ML20072G17313 June 1983Responds to NRC Re Violations Noted in IE Insp Rept 50-077/83-02.Corrective Actions:Reactor Safety Committee Will Meet at Least Twice Each Yr
ML20097E2768 April 1983Advises That Licensee in Process of Changing Status of Reactor from Operational Mode to Temporary Shutdown Mode, Effective 830531.Fuel-containing Control Rods Will Be Removed & Stored in Locked Safe
ML20028F31714 January 1983Submits Public Version of Advice That Present Emergency Plan Meets Revised Requirements of 10CFR50
ML20042C38722 March 1982Forwards 1981 Annual Rept of Nuclear Reactor Operations.
ML20008F4116 March 1981Forwards Organization Chart Per NRC Telcon Re Licensee 791115 Ltr.Change to Tech Specs 16.6.1.2 Re Provost Requested
ML19305B77814 March 1980Forwards 1979 Annual Rept of Nuclear Reactor Operations.
ML19296E02418 December 1979Responds to NRC 791211 Ltr Re Violations Noted in IE Insp Rept 50-077/79-03.Corrective Actions:Notices Have Been Posted in Reactor Room & Radioisotopes Lab
ML19294B49917 December 1979Requests That Portions of IE Investigation 50-077/79-02 Be Withheld from Pdr.Info Could Negatively Impact Security Plan
ML19210C97815 November 1979Notifies of Tech Spec Change Re Separation of Ofcs of Executive Vice President & Provost
ML19209D07517 October 1979Forwards Amend 10 to Indemnity Agreement E-2,amending Article 1,Paragraph 4
ML19209B6874 October 1979Forwards Allegations Made by K Fitzpatrick,Univ Student,To ED Pellegrino,President of Univ Re Security & Safety Procedures Near Reactor
ML19209B98728 September 1979Forwards Reactor Restart Rept.
ML19270F0745 January 1979Forwards Amend 1 to FSAR
ML20147E59710 October 1978Responds to NRC .Draft Tech Specs Reviewed & Acceptable