MONTHYEARML20097J5261995-09-22022 September 1995 Forwards Suppl Rept,Consisting of New App C & Final Revised Page Revs to Reactor Decommissioning Rept & Final Status Surveys for Facility Transmitted by ML20091G5821995-06-0202 June 1995 Responds to Request for Addl Info Re Final Status Survey Rept ML20097J5121994-12-20020 December 1994 Forwards Reactor Decommissioning Rept & Final Status Surveys in Accordance W/Approved Decommissioning Plan.All Survey Data Confirms That Facility Meets Release Criteria for Unrestricted Use Established in Decommissioning Plan ML20076K8791994-10-26026 October 1994 Provides NRC W/Certain Info Re Progress Made in Implementing NRC Approved Decommissioning Plan for Equipment & Facility Associated W/License R-31 ML20058L4671993-12-0808 December 1993 Forwards Insp Rept 50-077/93-02 on 931104 & 05.No Violations Noted.Understands Revised Schedule of Target Dates for Decommissioning Plan Will Be Forwarded to NRC by 931130 ML20092C8081992-02-0606 February 1992 Forwards Decommissioning Plan Catholic Univ of America, Radiation Safety Manual,Catholic Univ of America, Catholic Univ of America Chemical Matls Safety Manual & Tech Specs ML20087A1901991-12-19019 December 1991 Submits Info Re Reactor Decommissioning Schedule & Forwards Catholic Univ of America Annual Rept of Reactor-Related Activities for CY91 ML20073C0121991-04-19019 April 1991 Advises of Estimated Cost of Decommissioning Reactor in Response to .Estimated Cost Breakdown Shown in Listed Table ML20071A0331991-03-15015 March 1991 Submits Tentative Timetable for Establishment of Schedule for Decommissioning Reactor,In Partial Response to .Submittal of Reactor Decommissioning Plan Delayed Until 911231 ML20070H1021991-03-11011 March 1991 Responds to NRC Re Violations Noted in Insp of License R-31 on 910114-15.Corrective Actions:Quarterly Inventory & Surveillance Will Be Incorporated Into Schedule & Bldg Fire Alarm Will Be Tested in Connection W/Drill ML20055G4401990-07-12012 July 1990 Advises That 880727,891220,900126,0208 & 0504 Changes to Physical Security Plan Consistent w/10CFR50.54(p) & Acceptable for Inclusion Into Plan.Plan Withheld ML20042F3381990-05-0404 May 1990 Forwards Replacement Page 13-15 (Rev May 90) to Security Plan.Page Withheld ML20006D9281990-02-0808 February 1990 Forwards Replacement Page 13-15 to Security Plan.Encl Withheld ML19354E3691990-01-26026 January 1990 Forwards Rev to Security Plan.Rev Withheld ML20005D8141989-12-20020 December 1989 Forwards Rev to Reactor Security Plan,Reflecting Previously Approved Change in Status of License to Possession Only & Amend Submittal of 880727,requesting Approval for Reduction in Reactor Facility Boundary.Encl Withheld ML20245B4531989-06-0808 June 1989 Forwards Encl Listed Info on Decommissioned & Shutdown Reactors Requested During Discussions at Saxton on 890511 ML20195J9981988-12-0202 December 1988 Forwards Fuel Transfer Plan for AGN-201 Research & Test Reactor.Plan Withheld (Ref 10CFR2.790) ML20153D4251988-04-29029 April 1988 Forwards Insp Rept 50-077/88-01 on 880314.No Violations Noted.Number of Unresolved Issues Identified.Issues Will Remain as Unresolved Items Pending NRC Approval of Proposed License Changes ML20150D9721988-03-18018 March 1988 Informs of NRC Relocation to Stated Address.Mailing Address Unchanged.A Adams Project Manager & TS Michaels back-up Project Manager ML20238F4501987-09-10010 September 1987 Forwards 860714 Memo Appointing WE Keene as Reactor Administrator,Relieving ED Jordan of All Related Duties, Including Decommissioning of Facility ML20214S2711987-05-27027 May 1987 Informs of Realignment within NRC Region I Div of Reactor Projects Affecting Responsibility for Insp of Research & Test Reactor Facilities ML20141A1381986-03-27027 March 1986 Informs That TC Elsasser Will Replace EC Mccabe as Section Chief for Facility.Author Will Retain Responsibility as Branch Chief ML20199F4881986-03-20020 March 1986 Advises That 860127 Shipment of Spent Fuel Made W/O Proper License.Nrc Approved QA Program for Radiation Matl Packages Expired on 851231 & No Renewal Request Submitted Before License Expiration Per 10CFR2.106 ML20154K1571986-03-0505 March 1986 Forwards Amend 9 to License R-31 & Safety Evaluation.Amend Changes Tech Specs to Authorize Possession Only Status During Decommissioning Plans ML20138R2471985-11-0505 November 1985 Responds to NRC Re Violations Noted in Insp Rept 50-077/85-01.Corrective Actions:Alternate Reactor Administrator Appointed to Ensure Access at All Times to Records ML20138D9281985-10-21021 October 1985 Confirms 851001 Telcon Clarifying Transfer of Up to 701 G U-235,enriched to 20% UO2 & Embedded in Polyethylene,To DOE Facilities ML20135H7951985-09-23023 September 1985 Clarifies Position Re Commitment to Apply for Decommissioning W/O possession-only Status Discussed During 850904 Meeting.J Dosa Summary of Meeting Incorrectly States That Application for possession-only Amend to Be Submitted ML20135J1021985-09-20020 September 1985 Advises That 850722 Rev to Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20128P9991985-07-23023 July 1985 Forwards Safety Insp Rept 50-077/85-01 on 850604 & Notice of Violation.Meeting to Discuss Results of Insp & to Reach Agreement on Resolution of Administrative Controls Issue Suggested ML20133B5401985-07-22022 July 1985 Notifies of Intent to Issue Key to Faculty Member in Dept of Biology to Provide Unaccompanied Access to Cs-137 Irradiator,Per 850711 Telcon ML20097E2631984-08-29029 August 1984 Advises That Reactor Currently in Shutdown Mode,In Response to 840703 ltr.Fuel-bearing Control Rods Removed & Secured.Emergency Plan Needs Will Be Addressed When Licensee Requests Permission to Become Operational ML20072G1731983-06-13013 June 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-077/83-02.Corrective Actions:Reactor Safety Committee Will Meet at Least Twice Each Yr ML20097E2761983-04-0808 April 1983 Advises That Licensee in Process of Changing Status of Reactor from Operational Mode to Temporary Shutdown Mode, Effective 830531.Fuel-containing Control Rods Will Be Removed & Stored in Locked Safe ML20028F3171983-01-14014 January 1983 Submits Public Version of Advice That Present Emergency Plan Meets Revised Requirements of 10CFR50 ML20054K7561982-06-18018 June 1982 Forwards IE Safeguards Insp Repts 50-077/82-01 & 70-0190/82-01 on 820512.No Noncompliance Noted ML20054L3881982-06-16016 June 1982 Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl ML20042C3871982-03-22022 March 1982 Forwards 1981 Annual Rept of Nuclear Reactor Operations. ML20008F4111981-03-0606 March 1981 Forwards Organization Chart Per NRC Telcon Re Licensee 791115 Ltr.Change to Tech Specs 16.6.1.2 Re Provost Requested ML20149K1911980-05-0707 May 1980 Generic Ltr 80-38 to All Nonpower Reactor Licensees Re NPR Physical Protection Requirements.Summary of Certain NPR Physical Protection Requirements Encl & Should Aid in Determining Safeguards Requirements Applicable to Facility ML19305B7781980-03-14014 March 1980 Forwards 1979 Annual Rept of Nuclear Reactor Operations. ML19296E0241979-12-18018 December 1979 Responds to NRC 791211 Ltr Re Violations Noted in IE Insp Rept 50-077/79-03.Corrective Actions:Notices Have Been Posted in Reactor Room & Radioisotopes Lab ML19294B4991979-12-17017 December 1979 Requests That Portions of IE Investigation 50-077/79-02 Be Withheld from Pdr.Info Could Negatively Impact Security Plan ML19210C9781979-11-15015 November 1979 Notifies of Tech Spec Change Re Separation of Ofcs of Executive Vice President & Provost ML19209D0751979-10-17017 October 1979 Forwards Amend 10 to Indemnity Agreement E-2,amending Article 1,Paragraph 4 ML19209B6871979-10-0404 October 1979 Forwards Allegations Made by K Fitzpatrick,Univ Student,To ED Pellegrino,President of Univ Re Security & Safety Procedures Near Reactor ML19209B9871979-09-28028 September 1979 Forwards Reactor Restart Rept. ML19270F0741979-01-0505 January 1979 Forwards Amend 1 to FSAR ML20147E5971978-10-10010 October 1978 Responds to NRC .Draft Tech Specs Reviewed & Acceptable ML20137G4721971-06-23023 June 1971 Advises That Presence & Irradiation of Explosives in Reactor Must Be Evaluated Due to Potential for Damage to Reactor. Evaluation Requested Establishing Operating Restrictions,Max Quantity of Explosives Allowed in Facility & Form 1995-09-22
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20097J5261995-09-22022 September 1995 Forwards Suppl Rept,Consisting of New App C & Final Revised Page Revs to Reactor Decommissioning Rept & Final Status Surveys for Facility Transmitted by ML20091G5821995-06-0202 June 1995 Responds to Request for Addl Info Re Final Status Survey Rept ML20097J5121994-12-20020 December 1994 Forwards Reactor Decommissioning Rept & Final Status Surveys in Accordance W/Approved Decommissioning Plan.All Survey Data Confirms That Facility Meets Release Criteria for Unrestricted Use Established in Decommissioning Plan ML20076K8791994-10-26026 October 1994 Provides NRC W/Certain Info Re Progress Made in Implementing NRC Approved Decommissioning Plan for Equipment & Facility Associated W/License R-31 ML20092C8081992-02-0606 February 1992 Forwards Decommissioning Plan Catholic Univ of America, Radiation Safety Manual,Catholic Univ of America, Catholic Univ of America Chemical Matls Safety Manual & Tech Specs ML20087A1901991-12-19019 December 1991 Submits Info Re Reactor Decommissioning Schedule & Forwards Catholic Univ of America Annual Rept of Reactor-Related Activities for CY91 ML20073C0121991-04-19019 April 1991 Advises of Estimated Cost of Decommissioning Reactor in Response to .Estimated Cost Breakdown Shown in Listed Table ML20071A0331991-03-15015 March 1991 Submits Tentative Timetable for Establishment of Schedule for Decommissioning Reactor,In Partial Response to .Submittal of Reactor Decommissioning Plan Delayed Until 911231 ML20070H1021991-03-11011 March 1991 Responds to NRC Re Violations Noted in Insp of License R-31 on 910114-15.Corrective Actions:Quarterly Inventory & Surveillance Will Be Incorporated Into Schedule & Bldg Fire Alarm Will Be Tested in Connection W/Drill ML20042F3381990-05-0404 May 1990 Forwards Replacement Page 13-15 (Rev May 90) to Security Plan.Page Withheld ML20006D9281990-02-0808 February 1990 Forwards Replacement Page 13-15 to Security Plan.Encl Withheld ML19354E3691990-01-26026 January 1990 Forwards Rev to Security Plan.Rev Withheld ML20005D8141989-12-20020 December 1989 Forwards Rev to Reactor Security Plan,Reflecting Previously Approved Change in Status of License to Possession Only & Amend Submittal of 880727,requesting Approval for Reduction in Reactor Facility Boundary.Encl Withheld ML20195J9981988-12-0202 December 1988 Forwards Fuel Transfer Plan for AGN-201 Research & Test Reactor.Plan Withheld (Ref 10CFR2.790) ML20238F4501987-09-10010 September 1987 Forwards 860714 Memo Appointing WE Keene as Reactor Administrator,Relieving ED Jordan of All Related Duties, Including Decommissioning of Facility ML20138R2471985-11-0505 November 1985 Responds to NRC Re Violations Noted in Insp Rept 50-077/85-01.Corrective Actions:Alternate Reactor Administrator Appointed to Ensure Access at All Times to Records ML20135H7951985-09-23023 September 1985 Clarifies Position Re Commitment to Apply for Decommissioning W/O possession-only Status Discussed During 850904 Meeting.J Dosa Summary of Meeting Incorrectly States That Application for possession-only Amend to Be Submitted ML20133B5401985-07-22022 July 1985 Notifies of Intent to Issue Key to Faculty Member in Dept of Biology to Provide Unaccompanied Access to Cs-137 Irradiator,Per 850711 Telcon ML20097E2631984-08-29029 August 1984 Advises That Reactor Currently in Shutdown Mode,In Response to 840703 ltr.Fuel-bearing Control Rods Removed & Secured.Emergency Plan Needs Will Be Addressed When Licensee Requests Permission to Become Operational ML20072G1731983-06-13013 June 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-077/83-02.Corrective Actions:Reactor Safety Committee Will Meet at Least Twice Each Yr ML20097E2761983-04-0808 April 1983 Advises That Licensee in Process of Changing Status of Reactor from Operational Mode to Temporary Shutdown Mode, Effective 830531.Fuel-containing Control Rods Will Be Removed & Stored in Locked Safe ML20028F3171983-01-14014 January 1983 Submits Public Version of Advice That Present Emergency Plan Meets Revised Requirements of 10CFR50 ML20042C3871982-03-22022 March 1982 Forwards 1981 Annual Rept of Nuclear Reactor Operations. ML20008F4111981-03-0606 March 1981 Forwards Organization Chart Per NRC Telcon Re Licensee 791115 Ltr.Change to Tech Specs 16.6.1.2 Re Provost Requested ML19305B7781980-03-14014 March 1980 Forwards 1979 Annual Rept of Nuclear Reactor Operations. ML19296E0241979-12-18018 December 1979 Responds to NRC 791211 Ltr Re Violations Noted in IE Insp Rept 50-077/79-03.Corrective Actions:Notices Have Been Posted in Reactor Room & Radioisotopes Lab ML19294B4991979-12-17017 December 1979 Requests That Portions of IE Investigation 50-077/79-02 Be Withheld from Pdr.Info Could Negatively Impact Security Plan ML19210C9781979-11-15015 November 1979 Notifies of Tech Spec Change Re Separation of Ofcs of Executive Vice President & Provost ML19209D0751979-10-17017 October 1979 Forwards Amend 10 to Indemnity Agreement E-2,amending Article 1,Paragraph 4 ML19209B6871979-10-0404 October 1979 Forwards Allegations Made by K Fitzpatrick,Univ Student,To ED Pellegrino,President of Univ Re Security & Safety Procedures Near Reactor ML19209B9871979-09-28028 September 1979 Forwards Reactor Restart Rept. ML19270F0741979-01-0505 January 1979 Forwards Amend 1 to FSAR ML20147E5971978-10-10010 October 1978 Responds to NRC .Draft Tech Specs Reviewed & Acceptable 1995-09-22
[Table view] |
Text
- _ _ - - _ _ _ _ .
= .
CUA
. e.
Tile CATilOLIC UNthERSITY OF AMEltlCA Radiation Sqfety Office li'ashington, D.C. 20064 202 319 3206 Docket 50-77 19 Apill 1991 Mr. Marvin M. Mendonca, Senior Project Manager Non-Power Reactors, Decommissioning and Environmental Project Directorate Division of Advanced Reactors and Special Piojects Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington DC 20555
Dear Mr. Mendonca:
SUBJ: PLANS FOR FUNDING letwM'41 SS IONI NG In response to your letter of 19 February 1991, it is estimated that decommis-sioning the reactor will cost approximately Sll,000.00. This does not include post-decommissioning disposal of the residual structure. The estimated cost breakdown is shown in the table.
Professional time $ 3 , :'10 Technician time 1,455 Machiitist time 96 Materials & Supplies 560 Fuel Shipment 500 Waste Disposal 3,750 Contingencies 1,399 ESTIMATED TOTAL COST $11,000 Professional and technician time will be provided by the Radiation Safety Of fice, which consists of the RSO and one technician, The projected time amounts to ap-proximately 10% of one year's net usable time for each of these individuals. The Radiation Safety Of fice is budgeted for the cost of disposal of all radioactive waste generated on the campus; these costs are not passed through to the waste generators. The tabulated non-labor costs approximate 40% of the annual radwaste disposal budget. I have been assured that other university funds will be used to au-a::nt the radwaste disposal line, if necessary, in order to accomraodate non-labor reactor disposal costs, (f,incerety, f /
OAltU < f 9104250073 9104.19 Warren E. Keene, Ph.D.
{DR ADOCK 05000077 Reactor Administrator and Director of Radiation Safety .
cc: Sr. Rosemary Donley, S.C.