ML20128P999

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-077/85-01 on 850604 & Notice of Violation.Meeting to Discuss Results of Insp & to Reach Agreement on Resolution of Administrative Controls Issue Suggested
ML20128P999
Person / Time
Site: 05000077
Issue date: 07/23/1985
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Favret A
CATHOLIC UNIV. OF AMERICA, WASHINGTON, DC
Shared Package
ML20128Q006 List:
References
NUDOCS 8507260564
Download: ML20128P999 (2)


See also: IR 05000077/1985001

Text

-

(,,

s

.-

JUL 2 31985

Docket No. 50-77

Catholic University

ATTN: Dr. A. Favret

Dean of Engineering and

Architecture

620 Michigan Avenue, N.E.

Washington, D.C. 20064

Gentlemen:

Subject: Inspection 50-77/85-01

This refers to the routine safety inspection conducted by Mr. Thomas Elsasser of

this office on June 4, 1985 and to your telephone conversation with Mr. Elsasser

on June 21, 1985 regarding the findings of this inspection. Areas examined during

this inspection are described in the NRC Region I Inspection Report which is en-

closed with this letter.

Based on the results of this inspection, it appears that your administrative con-

trols were not conducted in full compliance with NRC requirements, as set forth

in the Notice of Violation, enclosed as Appendix A. We consider the failure to

have a Reactor Administrator available for several months a significant neglect

of your license obligations. Regardless of the operational condition of your

reactor, your facility and all associated records must be available for review by

the NRC within a reasonable period of time.

You are required to respond to this letter and should follow the instructions in

Appendix A in preparing your response. Prior to that, we would like to meet with

you to discuss the results of this inspection and to reach an agreement on the re-

solution of these issues. Mr. Elsasser will be contacting you to establish a

mutually acceptable date for the meeting.

Your cooperation with us is appreciated.

Sincerely,

QGk b'

Edward C. Wenzinger, Chief

Projects Branch No. 3

Division of Reactor Projects

Enclosures:

1. Appendix A, Notice of Violation

2. NRC Region I Inspection Report 50-77/85-01

8507260564 850723 ~

PDR ADOCK 05000077

G PDR

160l }

-

{1,

...

.

l- ' Catholic University 2 JUL 2 31985

l-

L

cc w/ encl:

i

'

Dr. W. Keinhofer, Chairman, Mechanical Engineering Department

Dr. E. D. Jordan, Director of.Information Systems and Planning

W. - Keene, Radiation Safety Official

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

l District of Columbia

bec w/ enc 1:

l Region I Docket Room (with concurrences)

Senior Operations Officer (w/o enc 1s)

DRP Section Chief

l

l

l

i

ause,,meo ,cCaee We, dg %

7/9/85 4M 7pp L 1 i

'

0FFICIAL RECORD COPY

i

..