Informs of Realignment within NRC Region I Div of Reactor Projects Affecting Responsibility for Insp of Research & Test Reactor Facilities
ML20214S271
Person / Time
Site: 05000077
Issue date: 05/27/1987
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Favret A
CATHOLIC UNIV. OF AMERICA, WASHINGTON, DC
Shared Package
ML20214S273 List:
References
RULE-PR-50-MISC, RULE-PR-51-MISC NUDOCS 8706090207
Download: ML20214S271 (3)


Text

-_.

o ,

MAY 2 71W Docket No. 50-77 Catholic University ATTN: Dr. Andrew G. Favret, Dean School of Engineering and Architecture l 620 Michigan Avenue, N.E.

Washington, D.C. 20064 l

Gentlemen:

This letter is being sent to inform you of a recent realignment within the NRC i

Region I Division of Reactor Projects that affects responsibility for the inspec-I tion of research and test reactor facilities. We had in the past retained that responsibility within a designated section of the Region I organization, using various elements of the organization as necessary to complete the regional inspec-tions. We have now distributed the inspection responsibility for individual re-search and test reactor facilities throughout the various Sections of the Division of Reactor Projects as indicated in the enclosure. Overall coordination of re-search and test reactor inspections will continue to receive my attention as well as that of Tom Elsasser, Chief, Reactor Projects Section 3C.

Our selection criteria for the realignment were based primarily on the location of each research or test reactor and its proximity to an " associated resident of-fice" at a power reactor facility. A resident inspector at that facility may as-sist in conducting routine or non routine operations inspections at your facility, or in responding to operational events. However, routine contacts regarding in-spection matters and communications, including event reporting, shall be with the regional project inspector and supervisors listed below:

Name Position Telephone Number Larry L. Scholl Project Inspector (215) 337-5173 Eugene M. Kelly Associated Resident Inspector at the Limerick Generating t

Station (215) 327-1344 James C. Linville Chief,ReactorProjects Section 2A (215) 337-5122 Robert M. Gallo Chief, Projects Branch No. 2 (215) 337-5225 A separate administrative matter, regarding recent issuance (on January 5,1987) of the final rule, " Communications Procedures Amendments,10 CFR Part 50," needs to be addressed. That rule was published in the Federal Register on November 6, 1986 (copy enclosed) and is now incorporated in the Code of Federal Regulations, t Title 10, revised as of January 1,1987. The rule changes the way licensees shall I submit written communications. Under the new procedures the licensee shall send the signed original of all Part 50 submittals to the NRC Document Control Desk with l

0706090207 070527 l

l PDR P

ADOCK 05000077 PDR

[h Jfll J l \\( l

0 Catholic University 2 IAAT27 N copies to the appropriate Regional Office and Resident Inspector. This includes many submittals for which the Regions were previously the primary recipient. For Region I research and test reactor licensees, we request that, in addition to the copy provided to the Regional Office (ATTN: Chief, Reactor Projects Section 2A) and to the associated Resident Inspector, you also send a copy to the Project In-spector listed above. It appears that these communication procedure changes were not being incorporated by most research and test reactor licensees. Therefore, please review the enclosure and the revised 10 CFR 50. If you have any questions regarding this matter, you should contact the Project Inspector.

OriAinal Si5ned B7.8..

Edward C. Wenzinger, Chief Projects Branch No. 3 Division of Reactor Projects

Enclosures:

As Stated cc w/encis:

Dr. E. D. Jordan, Director of Information Systems and Planning (Reactor Administrator)

Dr. William Kelnhofer, Chairman Mechanical Engineering Department (Alternate Reactor Administrator)

W. Keene, Radiation Safety Officer Public Document Room (PDR) local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

District of Columbia bec w/encls:

Region I Docket Room (with concurrences) i Management Assistant, DRMA (w/o enc 1) ,

Robert J. Bores, DRSS i T. Elsasser, Chief, RPS 3C, DRP J. Linville, Chief, RPS 2A, DRP T. Johnson, SRI (Peach Bottom), DRP ,

J. Williams, Project Inspector, DRP R RP, RI:DFP RI -

R R R 3P H rkamp/meo Li \ Winzip er l 5 '87

/ bpyli

(*) le G { g }

OFFICIAL RECORD COPY

, e MAY 1987 Rev. 1 DIVISION OF REACTOR PROJECTS Di rector - William F. Kane - 5229, Sc30 Deputy Director - Samuel J. Collins - 5126, 5 27 Secreta ry - C. Matakas - 5384 Reactor Licensing / Risk Engineer - B. Hillman - 5236 i

PC0JECTS BRANCH NO.I PROJfCTS BRANCH No. 2 PROJECTS BRANCH NO.3 Ch i e r - S. Co l l i n s ( Ac tg ) 5126, 5121 Chier - R. Gallo - $225, $228 Chier - E. Wenzinger - $224, 5219 Sec reta ry - M. DiDonato - 5226 Sec reta ry - R. Levin - 5383 Sec reta ry - M. E. Oprendek - $133 Operator Licensing - V. Curley - 5319 Assistants D. Gruber - 5 8 23 Section No. 2A Section No. 3A Section No. IA Chier - J. Linville - $122 Chier - L. E. Tripp - 5227 Project Engineer - H. Williams - 5388 Project Engineer - D. Limroth - 5128 Chier - R. Blough - 5146 Reactor Engineer - L. Scholl - 5873 Reactor Engineer - A. Sidpa ra - $112 Project Engineer - W. Baunack - 5232 Limerick l&2 Beaver Valley I & 2 R: actor Engineer - S. Peleschak - $134 Peach Bottom 2&3 Calvert Cliffs 1 & 2 (Entry Level) Cinna Maine Yankee AFRRl/Ca tholic Univ./ SUNY-Burra lo NBS/ Univ of Ma ryland TMI - I Westinghouse TR Oyster Creek Section No. 2B Penn State /Saxton Section No. 3B j Ch i e r - L. J . Norrholm - 5114

  • Section No. IB Project Engineer - R. Summers - Sil5 Chier - E. C. McCabe - $231 Reactor Engineer - R. Brady - 5316 Project Engineer - E. Conner - 5104 Chier - J. Wiggins - $128 Reactor Engineer - M. Kray - 5356 Project Eng inee r - L. Doerflein - 5 8 32 Indian Point 2 R: actor Engineer - R. Fuhrmeister - 5355 Hope Creek Haddam Neck R2 actor Eng ineer - P. liabighorst - 5316 Salem B&2 Millstone I&2 Cintichem Millstone 3 Susquehanna I&2 Rhode Island AEC Sho reham Section No. 2C Pilgrim Section No. 3C Manhatt2n College / Columbia Univ. Chier - J. Johnson - 5234 MIT/ Army (Watertown) _

P roj ec t Engineer - C. Meyer - 5183 Chier - T. C. Elsasser - 5378 Reactor Engineer - N. Perry - 5173 Project Engineer - D. Haverkamp - 5820 Section No. IC Reactor Engineer - C. Carpenter - 5222 Chier - R. M. keller - 5218 FitzPatrick Seabrook Lcad Reactor Engineer - N. Dudley - $240 Nine Mile Point !&2 Vermont Yankee

(Examiner) D. Lange - 5124 Co rne l l Univ. (Tank /TRICA) Yankee Rowe D. Coe - $171 RPl/ Univ. of Lowell R2 actor Engineer - B. Norris - $289 Worcester Poly Examiner A. Howe - 5084 S. Ba rber - 5060 R. T u rne r - $ 18 7 R. Temps - 5389 T. Lumb - 5381 *- l'a u l Swetland. Section chier L. kotonauski - 5875 errective 7/12/87 D. Silk - $32/

E. Yachimiak - 5060