ML20212P118

From kanterella
Revision as of 13:17, 20 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Rev 2 to Monthly Operating Rept for Nov 1986
ML20212P118
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/30/1987
From: Bregni L
DETROIT EDISON CO.
To:
Shared Package
ML20212P094 List:
References
NUDOCS 8703130282
Download: ML20212P118 (1)


Text

r:

" OPERATING DATA REPORT DOCKET NO. 50-341' COMPLETED BY L.P.Bregni

. DATE January 12, 1987 TELEPHONE (313)586-5313 OPERATING STATUS

1. - UNIT NAME: Fermi 2 l Notes l
2. REPORTING PERIOD: November, 1986 l l 3 LICENSED THERMAL POWER (MWL): 3292 l l
4. NAMEPLATE RATING (GROSS MWe): 1215 l l 5 DESIGN ELECT RATING (Net NWe): 1093 I I
6. MAX DEPENDABLE CAP (GROSS MWe): # l l 7 HAX DEPENDABLE CAP (Net MWE): # l l
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: None-9 POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net): 218.6
10. REASONS FOR RESTRICTION, IF ANY: Fermi 2 is in the startup test phase and is currently authorized to operate not in excess of 20% of rated thermal power. (Ref. J. G. Keppler letter of September 12, 1986)

THIS MONTH YR TO DATE CUMULATIVE

11. HRS IN REPORTING PERIOD 720 1,689.9 1,689.9 12.-HRS REACTOR WAS CRITICAL 159.1 560.1 560.1
13. REACTOR RESERVE SHUTDOWN HRS 0 0 0 14.' HOURS GENERATOR ON-LINE 26.0 95.8 95.8
15. UNIT RESERVE SHUTDOWN HOURS 0 0 0
16. GROSS THERMAL ENERGY GEN (MWH) 36,096 167,568 167,568 17.! GROSS ELECT ENERGY GEN (MWH) 2,020 7,640 7,640
18. NET ELECT ENERGY GEN (MWH) -6,723 -17,266 -17,266 d
19. UNIT SERVICE FACTOR N/A N/A N/A  :
20. UNIT AVAILABILITY FACTOR N/A N/A N/A
21. UNIT CAP FACTOR (USING MDC NET) N/A N/A N/A
22. UNIT CAP FACTOR (USING DER NET) N/A N/A N/A
23. UNIT FORCED OUTAGE RATE N/A N/A N/A
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MON (TYPE, DATE, DURATION OF EACH) NONE
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 12/16/86
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 06/20/85 06/21/85 i INITIAL ELECTRICITY 10/01/86 09/21/86 f COMMERCIAL OPERATION 05/01/87

~

l 0703130282 870112  ;

PDR ADOCK 05000341 R PDR

_ , .- _ _ _ _ . - - _ . . _._.__ _ _ _ _ . _ - - . _ _ . _ . . _ _ _ _ . - - . - _ _ _ . _ - -