OPERATING DATA REPORT DOCKET NO.
50-341 COMPLETED BY L.P.Bregni DATE January 12, 1987 TELEPHONE (313)586-5313 OPERATING STATUS 1.
UNIT NAME:
Fermi 2 INotes l
2.
REPORTING PERIOD: December l
l 3
LICENSED THERMAL POWER (MWt): 3292 l
l 4.
NAMEPLATE RATING (GROSS MWe):
1215 l
l 5
DESIGN ELECT RATING (Net MWe): 1093 I
I 6.
MAX DEPENDABLE CAP (GROSS MWe):
l l
7 MAX DEPENDABLE CAP (Net MWe):
l l
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: None 9
POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):
218.6
- 10. REASONS FOR RESTRICTION, IF ANY: Fermi 2 is in the startup test phase and is currently authorized to operate not in excess of 20% of rated thermal power.
(Ref. J. G. Keppler letter of September 12, 1986)
THIS MONTH YR TO DATE CUMULATIVE
- 11. HRS IN REPORTING PERIOD 744 2,433 9 2,433 9
- 12. HRS REACTOR WAS CRITICAL 308.9 869.8 869.8
- 13. REACTOR RESERVE SHUTDOWN HRS 0
0 0
- 14. HOURS GENERATOR ON-LINE 33 3 129.1 129.1
- 15. UNIT RESERVE SHUTDOWN HOURS 0
0 0
- 16. GROSS THERMAL ENERGY GEN (MWH) 55,680 223,248 223,248
- 17. GROSS ELECT ENERGY GEN (MWH) 2,810 10,450 10,450
- 18. NET ELECT ENERGY GEN (MWH)
-8,693
-25,959
-25,959
- 19. UNIT SERVICE FACTOR N/A N/A N/A
- 20. UNIT AVAILABILITY FACTOR N/A N/A N/A i
N/A N/A N/A
- 22. UNIT CAP FACTOR (USING DER NET)
N/A N/A N/A
- 23. UNIT FORCED OUTAGE RATE N/A N/A N/A
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH)
None l
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 06/20/85 06/21/85 INITIAL ELECTRICITY 10/01/86 09/21/86 COMMERCIAL OPERATION 05/01/87 8703130277 870112 PDR ADOCK 05000341 R
AVERAr?E DAILY UNIT PC'/ml IEVEL DOCKET No.
50; p.1,. _ _ _
UNIT FERMI 2 DATE January 12, 1987 COMPLETED BY L. P. Bregni TELEPHONE (313) 586-5313 MONTH December DAY AVERAGE DAII.Y POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
)
(MWe-Net)
(HWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7ii 0
23 0
j 8
0 24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 68.4 15 0
31 54.5 16 0
1
e.-
c,
. UNIT SHUTDOWNS AND POWEQ REDUCTIONS DOCdET NO.
50-301
.'DATE January 12. 1987 UNIT NAME Fermt 2 COMPLETED BY.. L.
P.
Breoni TELEPHONE (313)586-5313 REPORT MONTH December i
METHOD OF LER SYS COMP.
CAUSE & CORRECTIVE l
NO.
DATE TYPE DUR REASON SHUTTING DOWh.
NO.
CODE CODE ACTION TO PREVENT 1
(1)
(HRS)
(2)
THE REACTOR (4)
(5)
RECURRENCE l'
(3)'
a.
I I-86-06 861201 F
435.1 A
2 N/A HC HTEXCHD Shutdown continued from last moe i t ti to repair the cause of e=cesslve.
air in-leakage into the condenser and to install new relief valves.
to prevent future overpressuriza-tion of the condensate return line.
I (1) F: FORCED (2) REASON:
(3) METHOD:
(4) EXHIBIT G - INSTRUCTIONS S SCHEDULED A - EQUIPMENT-FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR-LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER) FILE D - REGULATORY RESTRICTION 4 - CONTINUED (NUREG-0161)
E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER G.- OPERATIONAL ERROR (EXPLAIN)
H - OTHER (EXPLAIN)
(5) EXHIBIT I - SAME SOURCE