Monthly Operating Rept for Dec 1986
ML20212P098
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/31/1986
From: Bregni L
DETROIT EDISON CO.
To:
Shared Package
ML20212P094 List:
References
NUDOCS 8703130277
Download: ML20212P098 (3)


Text

. OPERATING DATA REPORT DOCKET NO. 50-341 ___

COMPLETED BY L.P.Bregni  ;

DATE January 12, 1987 TELEPHONE (313)586-5313 l OPERATING STATUS i

1. UNIT NAME: Fermi 2 INotes l
2. REPORTING PERIOD: December l l  !

3 LICENSED THERMAL POWER (MWt): 3292 l l

4. NAMEPLATE RATING (GROSS MWe): 1215 l l  ;

5 DESIGN ELECT RATING (Net MWe): 1093 I I

6. MAX DEPENDABLE CAP (GROSS MWe): # l l 7 MAX DEPENDABLE CAP (Net MWe):
  • l l
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: None 9 POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net): 218.6
10. REASONS FOR RESTRICTION, IF ANY: Fermi 2 is in the startup test phase and is currently authorized to operate not in excess of 20% of rated thermal power. (Ref. J. G. Keppler letter of September 12, 1986)

THIS MONTH YR TO DATE CUMULATIVE

11. HRS IN REPORTING PERIOD 744 2,433 9 2,433 9
12. HRS REACTOR WAS CRITICAL 308.9 869.8 869.8
13. REACTOR RESERVE SHUTDOWN HRS 0 0 0
14. HOURS GENERATOR ON-LINE 33 3 129.1 129.1
15. UNIT RESERVE SHUTDOWN HOURS 0 0 0
16. GROSS THERMAL ENERGY GEN (MWH) 55,680 223,248 223,248
17. GROSS ELECT ENERGY GEN (MWH) 2,810 10,450 10,450
18. NET ELECT ENERGY GEN (MWH) -8,693 -25,959 -25,959
19. UNIT SERVICE FACTOR N/A N/A N/A
20. UNIT AVAILABILITY FACTOR N/A N/A N/A i 21. UNIT CAP FACTOR (USING MDC NET) N/A N/A N/A
22. UNIT CAP FACTOR (USING DER NET) N/A N/A N/A
23. UNIT FORCED OUTAGE RATE N/A N/A N/A
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH)

None l 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 06/20/85 06/21/85 INITIAL ELECTRICITY 10/01/86 09/21/86 .

COMMERCIAL OPERATION 05/01/87 8703130277 870112 PDR ADOCK 05000341 R PDR

AVERAr?E DAILY UNIT PC'/ml IEVEL DOCKET No. 50; p.1, . _ _ _

UNIT FERMI 2 _,

DATE January 12, 1987 COMPLETED BY L. P. Bregni TELEPHONE (313) 586-5313 MONTH December _

DAY AVERAGE DAII.Y POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

)

(MWe-Net) (HWe-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7ii j 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 68.4 15 0 31 54.5 16 0 1

e .- c,

. UNIT SHUTDOWNS AND POWEQ REDUCTIONS DOCdET NO. 50-301 .'DATE January 12. 1987 '

UNIT NAME Fermt 2 COMPLETED BY.. L. P. Breoni TELEPHONE (313)586-5313 REPORT MONTH December i

METHOD OF LER SYS COMP. CAUSE & CORRECTIVE l NO. DATE TYPE DUR REASON SHUTTING DOWh. NO. CODE CODE ACTION TO PREVENT 1 (1) (HRS) (2) THE REACTOR (4) (5) RECURRENCE l' (3)' a.

I I-86-06 861201 F 435.1 A 2 N/A HC HTEXCHD Shutdown continued from last moe i t ti ,

to repair the cause of e=cesslve.

air in-leakage into the condenser and to install new relief valves. ,

to prevent future overpressuriza- ,

tion of the condensate return line. I (1) F: FORCED (2) REASON: (3) METHOD: (4) EXHIBIT G - INSTRUCTIONS S SCHEDULED A - EQUIPMENT-FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR-LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER) FILE D - REGULATORY RESTRICTION 4 - CONTINUED (NUREG-0161)

E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER G.- OPERATIONAL ERROR (EXPLAIN)

H - OTHER (EXPLAIN) (5) EXHIBIT I - SAME SOURCE