ML20134L798
| ML20134L798 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 06/30/1996 |
| From: | Giles H DETROIT EDISON CO. |
| To: | |
| Shared Package | |
| ML20134L775 | List: |
| References | |
| NUDOCS 9702190291 | |
| Download: ML20134L798 (1) | |
Text
.
OPERATING DATA REPORT DOCKET NO. 50-341 COMPLETED BY H. B. Giles DATE July 15.1996 TELEPHONE (313) 586-1522 OPERATING STATUS 1.
Unit name: Fermi 2 NOTES: (1) Calculated using weighted averages to reflect variations in rating (MDC
]
and DER). (2) As of 06/21/96, limiting power l
2.
Reporting period: June.1996 to 91% CTP maximum due to main turbine 3.
Lice 1 sed thermal power (MWt): 3430 bearing vibrations.
4.
Nameplate rating (Gross MWe): 1179 Nameplate and DER ratings reflect 98% CTP 5.
Design elect rating (Net MWe): 1116 due to turbine throttle valve limitations.
6.
Max dependable cap (gross MWe): 924 7.
Max dependable cap (Net MWe): 876 8.
If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:
4 N/A 9.
Power level to which restricted, if any (MWe Net):
(2)
- 10. Reasons for restriction, if any:
(2) j i
THIS MONTH YEAR TO CUMULATIVE DATE 11.
Hours in reporting period 720 4.367 73.957 12.
Hours reactor was critical 720 3.779.5 52.131.1 l
13.
Reactor reserve shutdown hours 9
Q Q
14.
Hours generator on-line L2Q 3.732.2 49.368.5 15.
Unit reserve shutdown hours Q
Q Q
16.
Gross thermal energy gen (MWH) 2.222.088 11.960.712 151.571.915 17.
Gross elect energy gen (MWH) 616.350 L3_27.090 48.717.607 l
1 18.
Net Elect energy gen (MWH) 582.006 3.161.287 46.526.756 19.
Unit service factor 100.0 85.5 66.8 20.
Unit availability factor 100.0 85.5 66.8 4
21.
Unit cap factor (using MDC net) 92.3 82.6 60.5 (1) 22.
Unit cap factor (using DER net) 72.4 64.9 57.0 (1) 23.
Unit forced outage rate Q
14.5 20.9
- 24. Shutdowns scheduled over next 6 months (Type, Date, Duration of each): Refuel. Sect. 27.
1996. 52 days
- 25. If shutdown at end of report period, estimated date of startup: N/A 2
- 26. Units in test status (prior to commercial operation): N/A FORECAST ACHIEVED 4
Initial Criticality N/A N/A Initial Electricity N/A N/A Commercial Operation N/A N/A l
9702190291 970214 PDR ADOCK 05000341 R