Revised Monthly Operating Rept for Aug 1996 for Fermi 2
ML20134L808
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/31/1996
From: Giles H
DETROIT EDISON CO.
To:
Shared Package
ML20134L775 List:
References
NUDOCS 9702190296
Download: ML20134L808 (1)


Text

. .. _. ..

OPERATING DATA REPORT DOCKET NO. 50-341 COMPLETED BY H. B. Giles 1

DATE S.potember 13.1996 TELEPHONE ._{313) 586-1522  ;

1 OPERATING STATUS

1. Unit name: Fermi 2 NOTES: (1) Calculated using weighted averages to reflect variations in rating (MDC and DER). (2) As of 08/15/96, limiting power
2. Reporting period: August.1996 to 85% CTP maximum due to main turbine
3. Licensed thermal power (MWt): 3430 bearing vibrations.
4. Nameplate rating (Gross MWe): 1179 Nameplate and DER ratings reflect 98% CTP
5. Design elect rating (Net MWe): 1116 due to turbine throttle valve limitations.
6. Max dependable cap (gross MWe): 924
7. Max dependable cap (Net MWe): 876
8. If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:

N/A

9. Power level to which restricted, if any (MWe Net): (2)
10. Reasons for restriction, if any: (2)

THIS MONTH YEAR TO CUMULATIVE DATE I 1. Hours in reporting period 744 5.855 75.445  ;

12. Hours reactor was critical 744 5.267.5 53.619.1
13. Reactor reserve shutdown hours Q Q Q l
14. Hours generator on-line 744 5.220.2 50.856.5
15. Unit reserve shutdown hours 9 Q g
16. Gross thermal energy gen (MWH) 2.164.536 16.350.912 155.962.115
17. Gross elect energy gen (MWH) 596.900 4.539.600 49.930.117 l
18. Net Elect energy gen (MWH) 561.529 4.302.665 47.668.134
19. Unit service factor 100.0 89.2 67.4
20. Unit availability factor 100.0 89.2 67.4
21. Unit cap factor (using MDC net) 86.2 83.9 60.9 (1)
22. Unit cap factor (using DER net) 67.6 65.8 57.3 (1)
23. Unit forced outage rate 9 10.8 20.4 l
24. Shutdowns scheduled over next 6 months (Type, Date, Duration of each): Refuel. Scot. 27.

1996 52 days

25. If shutdown at end of report period, estimated date of startup: N/A
26. Units in test status (prior to commercial operation): N/A FORECAST ACIIIEVED Initial Criticality N/A N/A Initial Electricity N/A N/A Commercial Operation N/A N/_A 9702190296 970214 PDR ADOCK 05000341 R PDR