NRC-97-0117, Monthly Operating Rept for Oct 1997 for Fermi 2

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1997 for Fermi 2
ML20202G380
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/31/1997
From: Giles H, Peterson N
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-97-0117, CON-NRC-97-117, RTR-REGGD-01.016, RTR-REGGD-1.016 NUDOCS 9712100018
Download: ML20202G380 (4)


Text

--- . _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ -

e 1

m Dia.e Arv,af Edison' n=tr-4 mL Reg. Guide 1.16 November 14,1997 NRC-97-0117 .

U. S. Nuclear Regulatory ommission Attention: Document Control Desk Washington, D. C. 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthlv Operatine Status Report for October 1997 Enclosed for your information and use is the Fenni 2 Monthly Operating Status Report for October 1997. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

If you have any questions, please contact Harry Giles, at (313) 5861522.

Sincerely, f ,

Normaa K. Peterson Director - Nuclear Licensing 9712100018 971031 PDR ADOCK 05000341 Ni R PDR -

Enclosures I

cc: A. B. Beach B. L. Burgess D. R. Hahn G. Harris l

090108 Qi,3 y pog;z,,,, @ @,glj]l Region III

'A OPERATING DATA REPORT DOCKET NO. 50-341 COMPLETED BY H. B. Giles DNi~E ., November 14.1997 TELEPilONE (313) 586-1522 OPERATING STATUS 1, Unit naue: l'ermi 2 Notes: (1) Calculated using weighted

2. Reporting period: October 1997 averages to reflect variations in rating
3. Licensed thermal power (MWt): 3430 (MDC and DER) from initial commercial
4. Nameplate rating (Gross MWe): jllL(3) operation. (2) Design electrical rating
5. Design elect rating (Net MWe): 1116 (2) reflects 96% rer.ctor power, pending
6. Max dependable cap (Gross MWe): 1147 completion of Power Uprate Program
7. Max dependable cap (Net MWe): 1098 Testing. (3) General Electric Company Alethom instruction manual.
8. If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:

N/A

9. Power level to which reuricted, if any (MWe Net): (2)
10. Reasons for restriction,if any: (2)

THIS MONTil YEAR TO CUMULATIVE DATE

11. Hours in reportir.g period 745 7.296 85.670
12. Hours reactor was critical 411.9 4.366.2 58.790.9
13. Reactor reserve shuidown hours 0 Q Q
14. Hours generator on-line 376.4 3.997.7 55.493.7
15. Unit reserve shutdown hot.rs Q Q Q
16. Gross thermal energy gen (MWH) 1.041.984 12.260.18_4 170.095.595
17. Gross elect energy gen (MWH) 356.790 4.169.160 54.617.647
18. Net Elect energy gen (MWh) 341.131 3.982.995 52.138.484
19. Unit service factor 50.5 54.8 64.8
20. Unit availability factor 50.5 54.8 64.8
21. Unit cap factor (using MDC net) 41.7 55.6 59.3 (1)
22. Unit cap factor (using DER net) 41.0 48.9 55.1 (1)
23. Unit forced outage rate Q 40.9 23.3
24. Shutdowns scheduled wer next 6 months (Type, Date, Duration of each): N/A
25. If shutdown at end of report period, estimated date of startup: N/A
26. Units in test status (prior to commercial operation): N/A FORECAST ACHIEVED Initial Criticality N/A N/A

' itial Electricity

, N/A N/A Commercial Operation -N/A N/A

_ _ _ . __ _ _ a

L AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-341 UNIT Fermi 2 DATE Nowmber 14.1997 COMPLETED BY H. B. Giles v

TELEPIlONE (313) 586-1522 Month October 1997 ,

DAY AVERAGE DAILY DAY AVERAGE DAILY POWER POWER LEVEL LEVEL (MWe-Net) (MWe-Net)

I 1071 17 0 2 1069 18 0 3 491 19 141 4 0 20 l~1 5 0 21 624 6 0 22 _

1091 7 0 23 922 8 0 24. 1115 -

9 0 25 1113 10 0 26 1114 11 0 27 1104 12 0 28 1I14 13 0 29 871 14 0 30 1110 0 31 1109

_ 15 16- 0

.. . I UNIT SilUTDOWNS AND FOWER REDUCTIONS .-

COMPLETED BY: 11. B. Giles ,

OCKET NO: 50-34i TELEPilONE- 0 13)586-1522 -

DATE: November I4.1997 REPORT MONTil October 1997 -

Method of shutting LER No. Sys Code (4) Corer Cause and Corrective Action to No. (6) Date TYPE Dur (llrs) Reason (2) down reactor or Code Prevent Recurrence (1) reducing power (3) (5) 2 N/A AC ROD Reactor shutdown to replace 2 597-03 971003 S 368.7 A leaking fuel bundles and replace a Reactor Recirculation pump seal B 5 N/A AD MG Reactor power lowered to 60% to set R97-06 971029 F 0 (7)

Reactor Recirculation MG Set limiters and stops, and also to perform corrective maintenance on 345 KV Brownstown line breaker hot spots.

REASON: (3) METilOD: (4) Instructions for preparation ofdata entry sheets (1) F: Forced (2) for Licensee Event Report (LER) file (NIIREG-S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram 1022)

C - Refueling 3 - Automatic Scram (5) Same Source as (4)

D - Regulatory Restriction 4 - Continued (6) R - Prefix indicates power reduction.

E - Operations Training and License 5 - Reduced Load S - Prefix indicated plant shutdown. )

Examination 9 - Other (7) Duration of reductions reported as zero per F - Administrative Regulatory Guide 1.16. Revision 4.

l G - Operational Error (Explain)

II- Oti-r (Explain) l l

._- -