ML20134L838

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Nov 1996 for Fermi 2
ML20134L838
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/30/1996
From: Giles H
DETROIT EDISON CO.
To:
Shared Package
ML20134L775 List:
References
NUDOCS 9702190307
Download: ML20134L838 (1)


Text

~

OPERATING DATA REPORT DOCKET NO. 50-341 COMPLETED BY H. B. Giles  !

DATE December 13.1996 TELEPHONE (313) 586-1522 OPERATING STATUS

1. Unit name: Fermi 2 Notes: (1) Calculated using weighted
2. Reporting period: November.1996 averages to reflect variations in rating
3. Licensed thermal power (MWt): 3430 (MDC and DER). (2) Nameplate and DER
4. Nameplate rating (Gross MWe): 1179 ratings reflect 98% CTP due to turbine
5. Design elect rating (Net MWe): 1116 throttle valve limitations. (3) Scheduled 53
6. Max dependable cap (Gross MWe): 924 refuel outage extended due to EDG-11
7. Max dependable cap (Net MWe): 876 Automatic Voltage Regulator Failure.
8. If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:

N/A

9. Power level to which restricted, if any (MWe Net): (2) I
10. Reasons for restriction, if any: (2)

TIIIS MONTII YEAR TO CUMULATIVE DATE

11. Hours in reporting period 22Q 8.040 77.630
12. Hours reactor was critical 31.4 5.944.8 54.296.4
13. Reactor reserve shutdown hours Q Q Q
14. Hours generator on-line Q 5.859.7 51.496.0
15. Unit reserve shutdown hours Q Q Q
16. Gross thermal energy gen (MWH) Q l8.224.208 157.835.411 ,
17. Gross elect energy gen (MWH) Q 5.057.970 50.448.487 l i
18. Net Elect energy gen (MWH) Q 4.790.020 48.155.489
19. Unit service factor Q,0 72.9 66.3
20. Unit availability factor 00 72.9 66.3
21. Unit cap factor (using MDC net) Q,9 68.0 60.1 (1)
22. Unit cap factor (using DER net) Q 53.4 56.2 (1)  ;
23. Unit forced outage rate 100.0 13.4 20.6  !
24. Shutdowns scheduled over next 6 months (Type, Date, Duration of each): (3) l
25. If shutdown at end of report period, estimated date of startup: December 19.1996
26. Units in test status (prior to commercial operation): N/A FORECAST ACIIIEVED Initial Criticality N/A N/A Initial Electricity N/A N/A Commercial Operation N/A N/A 9702190307 970214 PDR ADOCK 05000341 R PDR