Text
.. -
l IrOR -
Fermi 2 Edison EEE8" ca.
Reg. Guide 1.16 November 15,1996 NRC-96-0102 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D. C. 20555
Reference:
Fermi 2 NRC Docket No. 50-341
)
NRC Operating License No. NPF-43
Subject:
Monthly Operating Status Report for October.1996 Enclosed for your information and use is the Fermi 2 Monthly Operating Status L
Report for October,1996. This report includes the Operating Data Report,-
Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2
)
i Technical Specification 6.9.1.6.
If you have any questions, please contact Harry Giles, at (313) 586-1522.
I Since ely, I
Peter W. Smith l
Director - Nuclear Licensing i
Enclosure
/}[, f / '
cc:
A. B. Beach D. R. Hahn l
/
/'
M. J. Jordan A. J. Kugler A.
Vegel M. V. Yudasz, Jr, i
nonnin Region III i
9611250003 961031 l
hDR ADOCK 05000341 PDR
i-OPERATING DATA REPORT J
DOCKET NO. 50-341 COMPLETED BY H. B. Giles t
j DATE November 15.1996 TELEPHONE (3131 586-1522 l
OPERATING STATUS 1.
Unit name: Fermi %
Notes: (1) Calculated using weighted j
2.
Reporting period: October 1996 averages to reflect variations in rating 3.
Licensed thermal power (MWt): 3430 (MDC and DER).
4.
Nameplate rating (Gross MWe): 1179 Nameplate and DER ratings reflect 98%
j 5.
Design elect rating (Net MWe): 1116 CTP due to turbine throttle valve i
'6.
Max dependable cap (Gross MWe): 924 limitations.
j.
~ 7.
Max dependable cap (Net MWe): 876 8.
If changes occur in capacity ratings (Items number 3 through 7) since last report,'give reasons:
N/A i
9.
Power level to which restricted, if any (MWe Net):
N/A j
- 10. Reasons for restriction, if any:
N/A i
j THIS MONTH YEAR TO CUMULATIVE 1
DATE i
11.
Hours in reporting period 745 7.320 76.910 l
12.
Hours reactor was critical Q
5.913.4 54.265.0 13.
Reactor reserve shutdown hours Q
Q Q
14.
Hours generator on-line Q
5.859.7 51.496.0 3
15.
Unit reserve shutdown hours Q
Q Q
1 16.
Gross thermal energy gen (MWH)
Q 18.224.208 157.835.411 17.
Gross elect energy gen (MWH)
Q 5.058.970 50.449.487 18.
Net Elect energy gen (MWH) 0 4.790.020 48.155.489 19.
Unit service factor M
80.1 67.0 20.
Unit availability factor M
80.1 67.0 21.
Unit cap factor (using MDC net)
M 74.7 60.6 (1) 22.
Unit cap factor (using DER net)
Q 58.6 56.7 (1) 23.
Unit forced outage rate 9
M 20.2
- 24. Shutdowns scheduled over next 6 months (Type, Date, Duration of each):
Refuel. Sept. 27.1996. 53 days
- 25. If shutdown at end of report period, estimated date of startup: Nov. 19.1996
- 26. Units in test status (prior to commercial operation): NLA FORECAST ACHIEVED Initial Criticality N/_4 N/A q
Initial Electricity N!/A N/A Commercial Operation N/A N/A
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-341 4
UNIT Fermi 2
~
DATE November 15.1996 COMPLETED BY H. B. Giles TELEPHONE (313) 586-1522 Month October.1996 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER POWER LEVEL LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 4
0 20 0
5 0
21 0
l 6
0 22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
s 0
16 0
~. _..
_ ~ _.
UNIT SHUTDOWNS AND POWER REDUCTIONS-
-+
DOCKET NO. 50-341 DATE:
' November 15.1996 UNIT NAME Fermi 2,-
' COMPLETED BY H. B. Giles TELEPIIONE (313) 586-1522 i
REPORTMONTH October.1996 t
No. (6)
Date
. TYPE Dur (Hrs)
Reason (2)
Method of LER Sys Code (4)
Comp Cause and Corrective Action to i
(1) shutting down
- No.
Code Prevent Recurrence reactor or (5) reducing power i
(3)
S96-02 960927 S
745 C
2 N/A N/A N/A Continued unit shutdown for Refueling Outage No. 5.
4 (1)
F: Forced (2)
REASON:
(3) METHODi (4) Instructions for preparation ofdata entry S: Scheduled A - Equipment Failure (Explain) 1 - Manual
. sheets for Licensee Event Report (LER) file B - Maintenance or Test 2 - Manual Scram (NUREG-1022)
C - Refueling 3 - Automatic Scram (5) Same Source as (4)
D - Regulatory Restriction 4 - Continued '
(6) R - Prefix indicates power reduction.
E-Operations Training and License 5 - Reduced Load S - Prefix indicated plant shutdown.
s Examination 9 - Other (7) Duration of reductions reported as zero per F-Administrative Regulatory Guide 1.16, Revision 4.
G - Operational Error (Explain)
H - Other (Explain).
.[
l I
t l-2 f
...