Monthly Operating Rept for Oct 1996 for Fermi 2
ML20134M276
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/31/1996
From: Giles H, Smith P
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-96-0102, CON-NRC-96-102, RTR-REGGD-01.016, RTR-REGGD-1.016 NUDOCS 9611250003
Download: ML20134M276 (4)


Text

.. - - _ _ . . _ . . __ . _ . __ _ . . . . _ _ . _ . - . _- .

l IrOR - Fermi 2 Edison EEE8" ca.

Reg. Guide 1.16 November 15,1996 NRC-96-0102 l

U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D. C. 20555 l

Reference:

Fermi 2  !

NRC Docket No. 50-341 )

NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for October.1996 l Enclosed for your information and use is the Fermi 2 Monthly Operating Status l L Report for October,1996. This report includes the Operating Data Report,- l Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 )'

i Technical Specification 6.9.1.6.

If you have any questions, please contact Harry Giles, at (313) 586-1522.

I Since ely, I

Peter W. Smith l Director - Nuclear Licensing i

Enclosure cc: A. B. Beach D. R. Hahn M. J. Jordan

/}[,

/'

f /l ' /

A. J. Kugler A. Vegel M. V. Yudasz, Jr, i nonnin Region III i 9611250003 961031 l hDR ADOCK 05000341 PDR

i- .

OPERATING DATA REPORT >

J DOCKET NO. 50-341 COMPLETED BY H. B. Giles t j DATE November 15.1996 TELEPHONE (3131 586-1522 OPERATING STATUS l

1. Unit name
Fermi % Notes: (1) Calculated using weighted j 2. Reporting period: October 1996 averages to reflect variations in rating
3. Licensed thermal power (MWt): 3430 (MDC and DER).

, 4. Nameplate rating (Gross MWe): 1179 Nameplate and DER ratings reflect 98%

j 5. Design elect rating (Net MWe): 1116 CTP due to turbine throttle valve i '6. Max dependable cap (Gross MWe): 924 limitations.

j. ~ 7. Max dependable cap (Net MWe): 876
8. If changes occur in capacity ratings (Items number 3 through 7) since last report,'give reasons

! N/A i

9. Power level to which restricted, if any (MWe Net): N/A  ;

j 10. Reasons for restriction, if any: N/A i  ;

j THIS MONTH YEAR TO CUMULATIVE 1 DATE '

i 11. Hours in reporting period 745 7.320 76.910 l 12. Hours reactor was critical 5.913.4 Q 54.265.0

13. Reactor reserve shutdown hours Q Q Q

! 14. Hours generator on-line Q 5.859.7 51.496.0

! 3

15. Unit reserve shutdown hours Q Q Q 1
16. Gross thermal energy gen (MWH) Q 18.224.208 157.835.411
17. Gross elect energy gen (MWH) Q 5.058.970 50.449.487 ,
18. Net Elect energy gen (MWH) 0 4.790.020 48.155.489  ;
19. Unit service factor M 80.1 67.0
20. Unit availability factor M 80.1 67.0 .
21. Unit cap factor (using MDC net) M 74.7 60.6 (1)  !'
22. Unit cap factor (using DER net) Q 58.6 56.7 (1)
23. Unit forced outage rate 9 M 20.2
24. Shutdowns scheduled over next 6 months (Type, Date, Duration of each):

Refuel. Sept. 27.1996. 53 days

25. If shutdown at end of report period, estimated date of startup: Nov. 19.1996
26. Units in test status (prior to commercial operation): NLA FORECAST ACHIEVED Initial Criticality N/_4 N/A q Initial Electricity N/A N!/A Commercial Operation N/A N/A

- AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-341 4

UNIT Fermi 2

~

DATE November 15.1996 COMPLETED BY H. B. Giles TELEPHONE (313) 586-1522 Month October.1996 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER POWER LEVEL LEVEL (MWe-Net) (MWe-Net) i 1 0 17 0

2 0 18 0 3 0 19 0 ,

4 4 0 20 0 5 0 21 0 l 6 0 22 0  ;

7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 s 0 16 0

._ . ._ ,.. __ _ _ . . . . . . . . _ . _ . _ ~ . _ . . _ . . _ ~ _ . . . _ _ _ . . - . - _ __. .- ._. .. - . .

. UNIT SHUTDOWNS AND POWER REDUCTIONS- -+

DOCKET NO. 50-341 DATE: ' November 15.1996 ..

UNIT NAME Fermi 2,- ' COMPLETED BY H. B. Giles .

TELEPIIONE (313) 586-1522 i REPORTMONTH October.1996 ,

t No. (6) Date . TYPE Dur (Hrs) Reason (2) Method of LER Sys Code (4) Comp Cause and Corrective Action to i (1) shutting down - No. Code Prevent Recurrence reactor or (5) reducing power i (3)

S96-02 960927 S 745 C 2 N/A N/A N/A Continued unit shutdown for Refueling Outage No. 5. >

4 (1) F: Forced (2) REASON: (3) METHODi (4) Instructions for preparation ofdata entry S: Scheduled A - Equipment Failure (Explain) 1 - Manual . sheets for Licensee Event Report (LER) file B - Maintenance or Test 2 - Manual Scram (NUREG-1022) ,

C - Refueling 3 - Automatic Scram (5) Same Source as (4)  ;

D - Regulatory Restriction 4 - Continued ' (6) R - Prefix indicates power reduction.

E- Operations Training and License 5 - Reduced Load S - Prefix indicated plant shutdown. s Examination 9 - Other (7) Duration of reductions reported as zero per  :

F- Administrative Regulatory Guide 1.16, Revision 4.

G - Operational Error (Explain)

H - Other (Explain) . .[

l I

t l

2 f

. . _ . . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ . _ _ _ . _ . _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ _ _ . . .