ML20134L830

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Oct 1996 for Fermi 2
ML20134L830
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/31/1996
From: Giles H
DETROIT EDISON CO.
To:
Shared Package
ML20134L775 List:
References
NUDOCS 9702190305
Download: ML20134L830 (1)


Text

. - _. - - - _- ..

OPERATING DATA REPORT DOCKET NO. 50-341 COMPLETED BY H. B. Giles DATE November 15.1996 TELEPHONE (313) 586-1522 OPERATING STATUS i

1. Unit name: Fermi 2 Notes: (1) Calculated using weighted
2. Reporting period: October.1996 averages to reflect variations in rating

. 3. Licensed thermal power (MWt): 3430 (MDC and DER). (2) Nameplate and DER i 4. Nameplate rating (Gross MWe): 1179 ratings reflect 98% CTP due to turbine

5. Design elect rating (Net MWe)
1116 throttle valve limitations.
6. Max dependable cap (Gross MWe): 924
7. Max dependable cap (Net MWe): 876 s
8. If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons

, N/A

9. Power level to which restricted, if any (MWe Net): (2)
10. Reasons for restriction, if any: (2)

THIS MONTH YEAR TO CUMULATIVE i DATE i l 1. Hours in reporting period 745 7.320 76.910 i 12. Hours reactor was critical Q 5.913.4 54.265.0

13. Reactor reserve shutdown hours 9 9 9
14. Hours generator on-line Q 5 859.7 51.496.0
15. Unit reserve shutdown hours Q Q Q
16. Gross thermal energy gen (MWH) Q 18.224.208 157.835.411
17. Gross elect energy gen (MWH) Q 5.057.970 50.448.487 l I 18. Net Elect energy gen (MWH) Q 4.790.020 48.155.489
19. Unit service factor QS 80.1 67.0
20. Unit availability factor QS 80.1 67.0
21. Unit cap factor (using MDC net) 0_A 74.7 60.6 (1)

. 22. Unit cap factor (using DER net) Q 58.6 56.7 (1)

23. Unit forced outage rate Q 98 20.2
24. Shutdowns scheduled over next 6 months (Type, Date, Duration of each):

i Refuel. Scot. 27.1996. 53 days

25. If shutdown at end of report period, estimated date of startup: Nov. 19.1996
26. Units in test status (prior to commercial operation): N/A FORECAST ACHIEVED Initial Criticality N/A N/A Initial Electricity N/A N/A Commercial Operation N/A N/A 9702190305 970214 PDR ADOCK 05000341 R PDR