Revised Monthly Operating Rept for May 1996 for Fermi 2
ML20134L791
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/31/1996
From: Giles H
DETROIT EDISON CO.
To:
Shared Package
ML20134L775 List:
References
NUDOCS 9702190287
Download: ML20134L791 (1)


Text

_. - . . - .. - .

1 s

OPERATING DATA REPORT DOCKET NO. 50-341 COMPLETED BY H. B. Giles DATE June 14.1996 TELEPHONE (313) 586-1522 OPERATING STATUS

1. Unit name: Fermi 2 NOTES: (1) Calculated using weighted averages to reflect variations in rating (MDC and DER). (2) As of 05/25/96, limiting power
2. Reporting period: May.1996 to 93% CTP maximum due to main turbine
3. Licensed thermal power (MWt): 3430 bearing vibrations.
4. Nameplate rating (Gross MWe): 1179 Nameplate and DER rating.s reflect 98% CTP ,
5. Design elect rating (Net MWe): 1116 due to turbine throttle valve limitations.
6. Max dependable cap (gross MWe): 924
7. Max dependable cap (Net MWe): 876
8. If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:

N/A

9. Power level to which restricted, if any (MWe Net): (2)
10. Reasons for restriction, if any: (2)

THIS MONTH YEAR TO CUMULATIVE DATE

11. Hours in reporting period 744 3.647 73.237
12. Hours reactor was critical 744 3.059.5 il 411 1
13. Reactor reserve shutdown hours 9 Q Q
14. Hours generator on-line 74* 3.012.2 48.648.5
15. Unit reserve shutdown hours Q Q Q
16. Gross thermal energy gen (MWH) 2.405.880 9.738.624 149.349.827
17. Gross elact energy gen (MWH) 671.160 2.710.740 48.101.257 l
18. Net Elect energy gen (MWH) 637.085 2.579 281 45.944.750
19. Unit service factor 100.0 82.6 66.4
20. Unit availability factor 100.0 82.6 66.4
21. Unit cap factor (using MDC net) 97.8 80.7 60.3 (1)  !
22. Unit cap factor (using DER net) 76.7 63.4 56.9 (1)
23. Unit forced outage rate Q 17.4 21.2
24. Shutdowns scheduled over next 6 months (Type, Date, Duration of each): Refuel. Sept. 27.

1996. 52 days

25. If shutdown at end of report period, estimated date of startup: N/A
26. Units in test status (prior to commercial operation): N/A FORECAST ACIllEVED Initial Criticality N/A N/A Initial Electricity A N/_A N/A Commercial Operation N/A NLA 9702190287 970214 PDR ADOCK 05000341 R PDR