NRC-97-0099, Monthly Operating Rept for Sept 1997 for Fermi 2

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1997 for Fermi 2
ML20198J777
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/30/1997
From: Giles H, Peterson N
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-97-0099, CON-NRC-97-99, RTR-REGGD-01.016, RTR-REGGD-1.016 NUDOCS 9710220097
Download: ML20198J777 (4)


Text

n 9

  • 40#th Dine Hwy Ed sbn amix=r"'- rt=:s.

Reg. Guide 1.16 October 15,1997 NRC-97 0099 .

U. S. Nuct-ar Regulatory Commiss!on Attention: Document Control Desk Washington, D. C. 20555

Reference:

Fermi 2 NRC Docket Wo. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operatine Status Report for Sentember 1997 Enclosed for your infonnation and use is the Fermi 2 Monthly Operating Status Report for September 1997. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

If you have any questions, please contact liarry Giles, at (313) 586-1522.

Sincerely, o

Norman K. Peterson Director - Nuclear Licensing

( 'b Enclosures

((/

/

cc: A. B. Besch -

D. R. Ilahn \

G. liarris 3 M. J. Jordan A. J. Kugler M. V. Yudasz, Jr.

Qgl%'l(I

, ,.s g R gion111 i- o i

fDR K1 4 R P D R ,;

OPERATING DATA REPORT f s

DOCKET No,1001j. COMPLETED BY 11. H. Giles DATl! -

October 15.1997 TELEP110NE (3131 586 1522  ;

OPl! RATING STA'fUS  ;

1. Unit name: Fenni 2 Notes: (1) Calculated using weighted
2. Repo ting period: Sentember 1997 averages to reflect variations in rating
3. Licensed thennal power (MWt): 1410 (MDC and DER) from initial commercial
4. Nameplate rating (Gross MWe): 1215(3) operation. (2) Design electrical rating
5. Design elect rating (Net MWe): 1116 (2) reflects 96% reactor power. (3) General
6. Max dependable cap (Gross MWe): 1]42 Electric Company Alsthom instruction i
7. Max dependable cap (Net MWe): 1098 manual. (4) October 3,1997,2 week midcycle outage planned to replace leaking .

fuel bundles.

8. If changes occur in capacity ratings (ltems number 3 through 7) since last report, give reasons:

N!%

9. Power level to which restricted, if any (MWe Net): (2) ,
10. Reasons for restriction, if any: (2)

TIIIS MONTli YEAR TO CUMULATIVE DATE

11. Ilours in reporting period 220 6.551 84.925
12. Ilours reactor was critical 22Q 3.954.3 58.379.0
13. Reactor reserve shutdown hours Q 2 0
14. Ilours generator on line 22Q 3.621.3 55.117.3
15. Unit reserve shutdown hours 0 0 0
16. Gross thermal energy gen (MWI1) 2.205.648 11.218.200 169.053.611
17. Gross elect energy gen (MWil) 762.140 3.812.370 54.260.857
18. Net Elect energy gen (MWil) 728.957 3.641.864 51.797.353
19. Unit service factor 100.0 ill 64.9

- 20. Unit availability factor 100.0 ill 64.9

21. Unit cap factor (using MDC net) 92 2 17 4 59.5 (1)
22. Unit cap factor (using DER net) 90,7 49.8 55.2 (1)
23. Unit forced outage rate Q 43.3 2M
24. Shutdowns scheduled over next 6 months (Type, Date, Duration of each): L4)
25. If shutdown at end of report period, estimated date of startup: HM
26. Units in test status (prior to commercial operation): N/%

FORECAST ACillEVED Initial Criticality N!% N/A Initial Electricity N!% N!%

Commercial Operation El% N!%

O' AVERAGE I)AliN UNIT POWER LEVEL j DOCKET No. 50-341 UNIT Femil 2 DATE October 15.1997 COMPLETED IW 11. H. Giles TELEPilONE (313)586 1522 Month September 1997 I)AY AVERAGE DAILY DAY AVERAGE DAILY POWER  :

POWER LEVEL LEVEL (MWe-Net) (MWe Net) -

1 1088 16 1084 2 1084 17 1082 3 1100 18 1089 _

4 1103 19 1075 '

5 1042 20 1079 6 911 21 1102

-7 860 22 1100-8 861 23 1097 L

t 9 866 24 1078 10 988 25 649 I'

i1 1096 26 671 ,

12- 1089-- 27 733 13 1090 28 984

~

14 1093 29 1069 15 1090 30 1057

_. ~ . _ . _ _ _ _ - - - . _ _ . . . - .- . . - , . . _ . . . _ . . . ~ . ~ _ _ - _ __ _ ._ . _

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-34I CONtPLETED BY: 1L B. Giles ',

DATE- October 15.1997 TELEPiiONE- (313)586-15 " - -

I i

i REPORT N10NTil Sernember 1997 -

No {6) Date TYPE Dur (llrs) Reason (2) hiethod of shutting LER No. Sys Code (4) Comp Cause and Correctisc Action to l (1) down reactor or Code Present Recurrence l reducing power (3) (5)

R97-04 970905 F 0(7) B 5 N/A N/A N/A Reactor power lowered to 76?& to repair hiain Generator ' Cat' breaker j 'Z' connection Mt spot.'

R97-05 970924 F 0(7) B 5 N/A N/A N/A Reactor power lowcred to 55?& to

]' perform power suppression testing for leakint fuel rod.  !

i i 1 1 (1) F: Forced (2) REASON: (3) h1ETIIOD: (4) Instructions for preparation of data entry sheets S: Scheduled A - Equipment Failure (Explain) 1 - h1anual for Licensee Es ent Report (LER) file (NUREG-B - hiaintenance or Test 2 - h1anual Scram 1022)

C - Refueling 3 - Automatic Scram (5) Same Source as(4)

D - Regulatory Restriction 4 - Continued (6) R - Prefix indicates power reduction.  ;

E - Operations Training and License 5 - Reduced Lead S - Prefh indicated plant shutdown. i Eumination 9 - Other (7) Duration ofreductions reported as zero per j F- Administratise Regulatory Guide 1.16. Resision 4. i G - Operational Error (Explain) l 11 - Other (Explain) i I i

)

l L

i l

i