ML20134L842

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Dec 1996 for Fermi 2
ML20134L842
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/31/1996
From: Giles H
DETROIT EDISON CO.
To:
Shared Package
ML20134L775 List:
References
NUDOCS 9702190313
Download: ML20134L842 (1)


Text

..

OPERATING DATA REPORT DOCKET NO. 50-341 COMPLETED BY H. B. Giles DATE Lanuary 15.1997 TELEPHONE (313) 586-1522 OPERATING STATUS 1.

Unit name: Eermi 2 Notes: (1) Calculated using weighted 2.

Reporting period: December.1996 averages to reflect variations in rating 3.

Licensed thermal power (MWt): 3430 (MDC and DER). (2) Nameplate and DER 4.

Nameplate rating (Gross MWe): 1179 ratings reflect 98% CTP due to turbine 5.

Design elect rating (Net MWe): 1116 throttle valve limitations. (3) Scheduled 53 6.

Max dependable cap (Gross MWe): 924 refuel outage extended due to concerns with 7.

Max dependable cap (Net MWe): 876 SRV position indication during surveillance testing.

8.

If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:

N/A 9.

Power level to which restricted, if any (MWe Net):

(2)

10. Reasons for restriction, if any:

(2)

THIS MONTH YEAR TO CUMULATIVE DATE 11.

Hours in reporting period 744 8.784 78.374 12.

Hours reactor was critical 128.3 6.073 1 54.424.7 13.

Reactor reserve shutdown hours 9

0 0

14 Hours generator on-line Q

5.859.7 51.496.0 15.

Unit reserve shutdown hours Q

Q 0

16.

Gross thermal energy gen (MWH) 0 18.224.208 157.835.411 17.

Gross elect energy gen (MWH)

Q 5.057.970 50.448.487 l

1 S.

Net Elect energy gen (MWH) 0 4.790.020 48.155.489 19.

Unit service factor 9

66.7 65.7 20.

Unit availability factor 0

66.7 65.7 21.

Unit cap factor (using MDC net)

Q 62.3 59.7 (1) 22.

Unit cap factor (using DER net)

Q 48.9 55.7 (1) 23.

Unit forced outage rate 100.0 22 21 5

24. Shutdowns scheduled over next 6 months (Type, Date, Duration of each): L3) l
25. If shutdown at end of report period, estimated date of startup: January 1.1997
26. Units in test status (prior to commercial operation): N/A FORECAST ACIIIEVED Initial Criticality N!/A N/A Initial Electricity N/A N/A Commercial Operation N/A N/A 9702190313 970214 PDR ADOCK 05000341 R

PDR