Revised Monthly Operating Rept for Sept 1996 for Fermi 2
ML20134L822
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/30/1996
From: Giles H
DETROIT EDISON CO.
To:
Shared Package
ML20134L775 List:
References
NUDOCS 9702190302
Download: ML20134L822 (1)


Text

__ _ ~ __

, OPERATING DATA REPORT DOCKET NO. 50-341 COMPLETED BY H. B. Giles DATE October 10.1996 TELEPHONE (313) 586-1522 OPERATING STATUS

1. Unit name: Fermi 2 Notes: (1) Calculated using weighted
2. Reporting period: September.1996 averages to reflect variations in rating
3. Licensed thermal power (MWt): 3430 (MDC and DER). (2) Nameplate and DER
4. ~ Nameplate rating (Gross MWe): 1179 ratings reflect 98% CTP due to turbine
5. Design elect rating (Net MWe): 1116 throttle valve limitations.
6. Max dependable cap (Gross MWe): 924
7. Max dependable cap (Net MWe): 876
8. If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:

NM

9. Power level to which restricted, if any (MWe Net): (2)
10. Reasons for restriction, if any: (2)

THIS MONTH YEAR TO CUMULATIVE DATE

11. Hours in reporting period 720 6.575 76.165
12. Hours reactor was critical 645.9 5 913.4 54.265.0
13. Reactor reserve shutdown hours 0 0 0
14. Hours generator on-line 639.5 5.859.7 51.496.0
15. Unit reserve shutdown hours 9 9 9
16. Gross thermal energy gen (MWH) 1.873.296 18.224.208 157.835.411
17. Gross elect energy gen (MWH) 518.370 5.057.970 50.448.487 l
18. Net Elect energy gen (MWH) 487.355 4.790.020 48.155.489
19. Unit service factor 88.8 89.1 67.6
20. Unit availability factor 88.8 89.1 '67.6
21. Unit cap factor (using MDC net) 77.3 8J 2 61.1 (1)
22. Unit cap factor (using DER net) 60.7 65.3 57.3 (1)
23. Unit forced outage rate Q 2. 8 20.2
24. Shutdowns scheduled over next 6 months (Type, Date, Duration of each):

Refuel. Sept. 27.1996. 53 days

25. If shutdown at end of repon period, estimated date of startup: Nov.19.1996
26. Units in test status (prior to commercial operation): NM FORECAST ACHIEVED Initial Criticality N!% N/A Initial Electricity N!% N/A Commercial Operation N/A N/A

~

9702190302 970214 PDR ADOCK 05000341 R PDR