NRC-96-0073, Monthly Operating Rept for Ju1 1996 for Fermi 2

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Ju1 1996 for Fermi 2
ML20116M752
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/31/1996
From: Giles H, Goodman L
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-96-0073, CON-NRC-96-73 NUDOCS 9608210055
Download: ML20116M752 (4)


Text

.

,o

, e DQ DOIrOil - Fermin D Edison EEn 52 a:1.

Reg. Guide 1.16 August 15,1996 NRC-96-0073 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D. C. 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Ooeratine Status Report for July.1996 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for July,1996. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

If you have any questions, please contact Harry Giles, at (313) 586-1522.

Sin erely, Lynne S. Goodman Director - Nuclear Licensing Enclosure cc: A. B. Beach D. R. Hahn l

M. J. Jordan A. J. Kugler -

A. Vegel J hM, N r//

M. V. Yudasz, Jr.

Region III nn  !

9608210055 960731 PDR ADOCK 05000341 3 R PDR

OPERATING DATA REPORT  !

[

DOCKET NO. 50-341 COMPLETED BY H. B. Giles DATE August 15.1996 TELEPHONE (313) 586-1522 l OPERATING STATUS 1

1. Unit name: Fermi 2 NOTES: (1) Calculated using weighted  !

averages to reflect variations in rating (MDC I I

and DER). (2) As of 07/07/96, limiting power i 2. Reporting period: July.1996 to 89% CTP maximum due to main turbine 1

3. Licensed thermal pcwer (MWt): 3430 bearing vibrations.
4. Nameplate rating (Gross MWe): 1179 Nameplate and DER ratings reflect 98% CTP
5. Design elect rating (Net MWe): 1116 due to turbine throttle valve limitations. ,

j 6. Max dependable cap (gross MWe): 924 j

7. Max dependable cap (Net MWe): 826 j
8. If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:

N/A

9. Power level to which restricted, if any (MWe Net): (2)
10. Reasons for restriction,if any: (2)

TIIIS MONTH YEAR TO CUMULATIVE DATE 3

11 Hours in reporting period 744 1,1}.1 74.701 12 Hours reactor was critical 744 4.523.5 52.875.1 1

13. Reactor reserve shutdown hours 0 0 0 l i
14. Hours generator on-line 744 4.476.2 50.112.5
15. Unit reserve shutdown hours Q Q Q
16. Gross thermal energy gen (MWH) 2.225.664 14J 86.376 153.797.579 l
17. Gross elect energy gen (MWH) 615.610 3.943.700 49.334.217
18. Net Elect energy gen (MWH) 579.849 3.741.136 47.106.605 1
19. Unit service factor 100.0 87.6 67.1 ,
20. Unit availability factor 100.0 87.6 67.1
21. Unit cap factor (using MDC net) 89.0 83.6 60.8 (1)
22. Unit cap factor (using DER net) 69.8 65.6 57.2 (1) ,
23. Unit forced outage rate Q 12.4 20.7
24. Shutdowns scheduled over next 6 months (Type, Date, Duration of each): Refuel. Sept. 27.

1996. 52 days

25. If shutdown at end of report period, estimated date of startup: N/M
26. Units in test status (prior to commercial operation): N/A FORECAST ACHIEVED Initial Criticality E!M N/A Initial Electricity N/A N/A Commercial Operation NM NM f

. 1 l

AVERAGE DAILY UNIT POWER LEVEL l DOCKET NO. 50-341 ,

UNIT Fermi 2 I

DATE August 15.1996 ;

COMPLETED BY H. B. Giles l TELEPHONE (313) 586-1522 )

l Month July.1996  ;

l DAY AVERAGE DAILY DAY AVERAGE DAILY POWER POWER LEVEL LEVEL l (MWe-Net) (MWe-Net) i l

1 796 17 785 2 797 18 777 3 797 19 773 1

4 668 20 783 )

5 735 21 781 6 780 22 782 7 792 23 781 8 797 24 769 9 797 25 768 10 798 26 773 J 11 797 27 788 12 785 28 798 13 775 29 807 14 770 30 799 15 756 31 797 16 763

UNIT SHUTDOWNS AND POWER REDUCTIONS .

DOCKET NO. 50-341 DATE August 15.1996 *

~

UNIT NAME Fermi 2 COMPLETED BY H. B. Giles 9

TEEPHONE (313) 586-1522 REPORT MONTH July.1996 No. (6) Date TYPE Dur (Hrs) Reason (2) Method of LER Sys Code (4) Comp Cause and Corrective Action to (1) shutting down No. Code Prevent Recurrence reactor or (5) reducing power (3)

R96-09 960704 S 0(7) B 5 N/A TK TCV Power reduced to 74% CTP to place the Main Turbine Generator hydrogen gas cooler temperature control valves in automatic operation.

(1) F: Forced (2) REASON: (3) METHOD: (4) Instructions for preparation of data entry S: Scheduled A - Equipment Failure (Explain) 1 - Manual sheets for Licensee Event Report (LER) file B - Maintenance or Test 2 - Manual Scram (NUREG-1022)

C - Refueling 3 - Automatic Scram (5) Same Source as (4)

D - Regulatory Restriction 4 - Continued (6) R - Prefix indicates power reduction.

E - Operations Training and License 5 - Reduced Load S - Prefix indicated plant shutdown.

Examination 9 - Other (7) Duration of reductions reported as zero per F- Administrative Regulatory Guide 1.16, Revision 4.

G - Operational Error (Explain)

H - Other (Explain)