ML20212P091

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Dec 1986 & Revised Operating Data Rept Sheets from Sept,Oct & Nov 1986, Reflecting Correct Value for Net Electrical Energy Generated in Sept
ML20212P091
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/12/1987
From: Lenart R
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20212P094 List:
References
NP870026, NUDOCS 8703130275
Download: ML20212P091 (1)


Text

2,.

s

$$!dEf" January 12, 1987 MjI r.rms-2 NP870026 Edison EiIn "

mm.

U. S. Nuclear Regulatory Commission Attention:

Director, Office of Resource Management Washington, D.C.

20555 Gentlemen:

Reference:

Fermi 2 NRC Docket No.

50-341 NRC Operating License No.

NPF-43

Subject:

Monthly Operating Status Report for December. 1986 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for December, 1986.

This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

This report also includes revised Operating Data Report sheets for September, October and November, 1986.

The reports have been revised to correct the value for Net Electrical Energy Generated in September.

If you have any questions, please contact us.

Sincerely,

(-

R. S. Lenart Plant Manager Enclosure cc:

J. R. Eckert D. R. Hahn J. G. Keppler W. G. Rogers J. J. Stefano 9,5>q{

G. C. Wright

'k 1 USNRC Document Control Desk Washington, D. C.

l G703130275 870112 PDR ADOCK 05000341 R

PDR