MONTHYEARML20058M1861993-09-22022 September 1993 Summary of Operating Reactors Events Meeting 93-35 on 930915 ML20246F8691989-06-22022 June 1989 Summary of Operating Reactors Events Meeting 89-24 on 890621.On 890615,potential Unmonitored Primary Coolant Release Path to Environ Discovered at WPPSS-2.On 890617,loss of Offsite Power Occurred at Brunswick,Unit 2 ML20155B8231988-09-20020 September 1988 Summary of Operating Reactors Events Meeting 88-37 on 880920.Info Encl Includes rept-to-date of long-term Followup Assignments & Summary of Reactor Scrams ML20214P6121987-05-27027 May 1987 Summary of Operating Reactors Events Meeting 87-14 on 870512 W/Nrr,Res,Aeod & Regional Ofcs Re Events Which Occurred Since 870507 Meeting.List of Attendees & Viewgraphs Encl ML20207L9571986-11-18018 November 1986 Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info Encl IA-86-855, Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info Encl1986-11-18018 November 1986 Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info Encl ML20206J6561986-06-23023 June 1986 Trip Rept of 860612 Training Session in Lacey,Wa Re Federal Radiological Emergency Response Plans & Meeting W/Utils & State of Wa Concerning Potential Emergency Preparedness Issues.Attendees Listed & Training Agenda Encl ML20210J0261986-03-24024 March 1986 Summary of Operating Reactor Events Meeting 86-08 on 860317 to Discuss Events Occurring Since Last Meeting on 860310 ML20128N4771985-05-22022 May 1985 Summary of Operating Reactors Events 850515 Meeting.Div Directors or Representatives Briefed on Events Occurring Since 850507 Meeting.Assignment of Followup Review Responsibilities Discussed.Attendance List Encl ML20197G2091983-12-12012 December 1983 Trip Rept of 831206 Site Visit Re Cable & Cable Tray Separation,Installation of Barriers,Fire Protection & Cable Spreading Room.Plant Ready for Fueling Pending Minor Preoperational Tests ML20197G1511983-12-0909 December 1983 Trip Rept of 831206 Site Visit Re Readiness Review.No Reason Noted to Recommend Delay in or Addl Restrictions Upon Low or Full Power License ML20213E4041983-04-13013 April 1983 Trip Rept of 830322-25 Visit to Richland,Wa to Conduct Fire Protection Site Audit.Concerns Discussed ML20213E1581982-05-28028 May 1982 Trip Rept of 820512 & 13 Site Visit to View Installation & Arrangement of Electrical Equipment & Cables,To Verify Implementation of Design Criteria & to Resolve Differences Between Plant Design & NRC Positions.Agenda Encl ML20213E1471982-05-19019 May 1982 Summary of 820518 Meeting W/Util Re Possible Impact of Seismic Reflection Profiling W/Special Emphasis on Southeast Anticline Fault ML20213E1321982-04-26026 April 1982 Trip Rept of 820412-14 Site Visit to Examine Trenches & Cores.List of Attendees Encl ML20098D1991982-04-23023 April 1982 Summary of 820423 Special Meeting of WPPSS Executive Board in Richland,Wa Re Financial Problems W/Continued Const of Facilities.Notices of Adjournment Encl ML20098D1371982-04-23023 April 1982 Summary of 820423,28 & 29 Regular Meetings of WPPSS Board of Directors in Richland,Wa Re Units 4 & 5 Termination Program, Claim Vouchers & BPA Finance Proposal.Notice of Adjournment for 820423 Meeting Encl ML20098D1121982-04-0505 April 1982 Summary of 820405 Special Meeting of WPPSS Executive Board in Richland,Wa Re Status of Projects,Selection of Cost Effectiveness Study Consultant,Bpa Draft Power Load Forecast & Units 4 & 5 Termination Program ML20213E1091982-03-31031 March 1982 Trip Rept of 820322 Visit to Richland & Seattle,Wa to Inspect Plant Spray Ponds & to Discuss Recent NRC & Util Modeling Studies on Spray Pond Cooling & Water Loss ML20213D9361981-12-0707 December 1981 Trip Rept of 811005 Visit to Denver,Co & Richland,Wa to Discuss Site Drainage Plans,Meeting W/Westec Consultants on Possible Orographic Effects & Duration of Rainfall & Meeting W/Pnl to Discuss Safety & Environ Review Procedures ML20213D9131981-11-12012 November 1981 Forwards Summary of 810929-30 & 1001-02 Design Audit Meetings W/Util in Woodbury,Ny Re All Structural Engineering Areas.W/O Encl ML17276A1761981-11-0202 November 1981 Forwards Minutes from Mechanical Engineering Branch 810929-30 & 1001 Meetings in Woodbury,Ny & 811016 Preservice Insp Meeting in Washington,Dc.Agenda Items from Both Meetings & Subsequent Resolution Encl ML20213D9061981-10-30030 October 1981 Summary of 810914-17 Meetings W/Util in Richland,Wa Re NRC Concerns in Containment Sys Area ML20213D8951981-10-30030 October 1981 Summary of 811007 Meeting W/Util in Bethesda,Md Re Soil Backfilling Compaction & Testing Program ML20213D8811981-10-30030 October 1981 Summary of 810925 Meeting W/Util in Bethesda,Md Re Open Issues in Instrumentation & Control Sys Area ML20213D8701981-10-27027 October 1981 Summary of 810929-1001 Meetings W/Util in Woodbury,Ny Re Open Issues in Mechanical Engineering Branch Area ML20213D3241980-09-18018 September 1980 Summary of 800805 Meeting W/Util & Consultants in Chicago,Il Re Facility Plant Unique Safety/Relief Valve Discharge Load Specification.Attendance List Encl ML20213D1971980-04-15015 April 1980 Forwards Summary of 800401-02 Meeting W/Savannah River Lab, Util,Ge & Burns & Roe in Richland,Wa Re FSAR Changes Resulting from Applicant Rewrite of Chapter 7 & to Conduct Site Tour of Facility ML20148C1311979-12-20020 December 1979 Summary of Meeting W/Mark II Owners Group in Bethesda,Md Re Status of Several long-term Program Tasks in Advance of Final Documentation.Agenda,List of Attendees & Viewgraphs Encl ML20213D0331979-08-22022 August 1979 Summary of 790717-18 Meeting W/Mark II Owners Group Re long-term Program Tasks ML20213C8911979-03-14014 March 1979 Summary of 790213-14 Meeting W/Mark II Owners Group Re Lead Plant Acceptance Criteria & Intermediate Plant Program Tasks ML20214G8711978-01-11011 January 1978 Summary of 771202 Meeting W/Ge Re Rev 1 to NEDO-10466, Power Generation Control Complex Design Criteria & Safety Evaluation. List of Meeting Attendees Encl ML20214G8691978-01-10010 January 1978 Summary of 770518-19 Meetings W/Mark II Owners & GE Re Mark II Containment Pool Dynamic Loads Program ML20214G8451977-12-0202 December 1977 Summary of 770510 Meeting W/Mark II Owners Executive Committee Re Mark II Containment Dynamic Loads Program.List of Attendees & Viewgraphs Encl ML20214G8351977-11-29029 November 1977 Summary of 770401 & 0707 Meetings W/Mark II Owners & GE Re Methods for Combining Dynamic Loads for Structural Design of Mark II Containment.List of Attendees & Viewgraphs Encl ML20214G8141977-11-22022 November 1977 Summary of 771116-17 Meetings W/Washington Energy Facility Site Evaluation Council in Richland,Wa Re Status of Plant & Impact of Aid to Mitigate Socioeconomic Impacts Resulting from Plant Const ML20214G7951977-08-0202 August 1977 Summary of 770729 Meeting W/Utils & GE Re Mark II Containment Pool Dynamic Load Program ML20214G7841977-06-23023 June 1977 Summary of 770615 Meeting W/Utils & GE Re Mark II Containment Pool Dynamic Loads.List of Attendees Encl ML20214G7741977-06-0808 June 1977 Summary of 770526 Meeting W/Mark II Owners & GE Re Mark II Containment Pool Dynamic Loads.List of Meeting Attendees Encl ML20214G6951977-04-18018 April 1977 Summary of 770216-17 Meeting W/Mark II Owners,Ge & BNL Re Mark II Containment Pool Dynamic Load Support Program.List of Meeting Attendees & Viewgraphs Encl ML20214G4271976-12-29029 December 1976 Summary of 761202 Meeting W/Mark II Owners & GE Re Mark II Containment Structural Design & Pool Dynamic Loads Supporting Program.Attendee List & Viewgraphs Encl ML20214G4371976-12-0707 December 1976 Summary of 761027-28 Meetings W/Mark II Owners,Ge & BNL Re Pool Dynamic Loads Analytical Model & Test Program.Lists of Attendees & Viewgraphs Encl ML20214G4501976-06-0808 June 1976 Summary of 760429 Meeting W/Ge,Mark II Owners & Respective Aes Re GE 751105 Design Basis Document NEDE-21061, Mark II Containment Dynamic Forcing Function Info Rept (Dffr) ML20214G6031975-08-26026 August 1975 Summary of 750821 Meeting W/Mark II Owners,Sargent & Lundy, Bechtel,S&W & B&R in Bethesda,Md Re Load Factors & Load Combinations for Assessing Capability of Mark II Containments to Accommodate Safety/Relief Valve Loads ML20214G7791975-07-0303 July 1975 Summary of 750630 Meeting W/Mark II Owners,Aes & GE in Bethesda,Md Re Role of Mark II Owners,Status of Const of Various Mark II Units & Program for Determining Mark II LOCA & Safety/Relief Valve Loads ML20214G5351974-11-0101 November 1974 Summary of 741018 Meeting W/Util & B&R Re Sacrificial Shield Pressure Response post-CP Review.List of Attendees Encl ML20198F0921974-08-0909 August 1974 Trip Rept of 740715 Site Visit for Site Review.Relationship of Proposed WPPSS Units 1 & 4 to WPPSS Unit 2 & Location of Future Effluent Discharge Line on Columbia River Noted ML20214G8191973-11-21021 November 1973 Summary of 731017-18 Meetings W/Util,B&R & GE in Bethesda,Md Re Outstanding post-CP Items ML20214G8121972-11-13013 November 1972 Summary of 721026 Meeting W/Util,B&R,Usgs & Geological Consultant in Denver,Co Re Util Plans for Resolving Contradictions in Geological Data in PSAR & Ambiquities in Regional Geological Analysis ML20214G4601972-08-21021 August 1972 Summary of 720804 & 09 Meetings W/Util & B&R in Bethesda,Md Re Adequacy of 20% of Critical Damping for Horizontal & Vertical Response Used by Applicant for Soil Structure Interaction During Seismic Event.Attendees List Encl 1993-09-22
[Table view] Category:TRIP REPORTS
MONTHYEARML20206J6561986-06-23023 June 1986 Trip Rept of 860612 Training Session in Lacey,Wa Re Federal Radiological Emergency Response Plans & Meeting W/Utils & State of Wa Concerning Potential Emergency Preparedness Issues.Attendees Listed & Training Agenda Encl ML20197G2091983-12-12012 December 1983 Trip Rept of 831206 Site Visit Re Cable & Cable Tray Separation,Installation of Barriers,Fire Protection & Cable Spreading Room.Plant Ready for Fueling Pending Minor Preoperational Tests ML20197G1511983-12-0909 December 1983 Trip Rept of 831206 Site Visit Re Readiness Review.No Reason Noted to Recommend Delay in or Addl Restrictions Upon Low or Full Power License ML20213E4041983-04-13013 April 1983 Trip Rept of 830322-25 Visit to Richland,Wa to Conduct Fire Protection Site Audit.Concerns Discussed ML20213E1581982-05-28028 May 1982 Trip Rept of 820512 & 13 Site Visit to View Installation & Arrangement of Electrical Equipment & Cables,To Verify Implementation of Design Criteria & to Resolve Differences Between Plant Design & NRC Positions.Agenda Encl ML20213E1321982-04-26026 April 1982 Trip Rept of 820412-14 Site Visit to Examine Trenches & Cores.List of Attendees Encl ML20213E1091982-03-31031 March 1982 Trip Rept of 820322 Visit to Richland & Seattle,Wa to Inspect Plant Spray Ponds & to Discuss Recent NRC & Util Modeling Studies on Spray Pond Cooling & Water Loss ML20213D9361981-12-0707 December 1981 Trip Rept of 811005 Visit to Denver,Co & Richland,Wa to Discuss Site Drainage Plans,Meeting W/Westec Consultants on Possible Orographic Effects & Duration of Rainfall & Meeting W/Pnl to Discuss Safety & Environ Review Procedures ML20198F0921974-08-0909 August 1974 Trip Rept of 740715 Site Visit for Site Review.Relationship of Proposed WPPSS Units 1 & 4 to WPPSS Unit 2 & Location of Future Effluent Discharge Line on Columbia River Noted ML20214G5381972-06-26026 June 1972 Trip Rept of 720612-15 Visit to Facility & Grand Coulee Dam,Wa to Review Results of Latest Investigations,Examine 15-ft Deep Trench at Facility & Conduct Geological Reconnaissance at Dam ML20198F8861972-02-22022 February 1972 Trip Rept of Site Visit During Wk of 720207 Re State of Wa Review & Details of Environ Monitoring Program ML20198F9011972-02-22022 February 1972 Trip Rept of Site Visit During Wk of 720207 Re State of Wa Review,Environ Statements & Environ Monitoring Program 1986-06-23
[Table view] |
Text
.
)' .- ,
},(. (? YL 0EO MAY 3 81992 s
h(
MEMORANDUM FOR: M. Srinivasan, Chief Power Systems Branch C[g ,- ,
+ f(g J. E. Knight, Section Leader THRU:
Electrical Section, PSB, DSI e'3.'y,
'; 3. dd3 $c.@ -
.a .
FROM: S. Rhow, Electrical Section D, g- g%
k @
Power Systems Branch, DSI Q j , r,a \,
SUBJECT:
TRIP REPORT ON SITE VISIT OF WNP NO 2 On May 12 and 13,1982, I visited the site of WNP No. 2 to view the installation and arrangement of electrical equipment and cables in the areas identified in the attached sheet. The purpose of the site visit was to verify proper implementation of the design criteria and to resolve differences between WNP-2 design and our technical positions. During my tour, I identified the major differences described in detail as follows:
- 1. The applicant misinterpreted the requirements of IEEE Standard 384 for Independence of Class lE Equipment and Circuits. With respect to the associated circuits, their definition of the associated circuits is non-Class lE cables / wires which share raceways with Class 1E cables / wires and which are not physically separated from Class 1E cables / wires. I clarified the definition of the associated circuits such as non-Class 1E cables / wires which share raceways with Class lE cables / wires or which are not physically separated from Class lE cables / wires. Non-Class lE cables must be physically separated from Class lE cables in the same manner that redundant Class lE cables are separated from each other or they become associated circuits and must follow the requirements for associated circuits. The applicant committed to exercise the correct definition. Accordingly, necessary modifications and rerouting or separation of wires / cables / raceways will be implemented throughout the plant to bring the installation into conformance with IEEE 384 as endorsed by R.G. 1.75.
- 2. Separation requirements of non-Class lE circuits from Class lE circuits / associated circuits are the same as separation of redundant channel / division required by IEEE Standard 384 as endorsed by R.G. 1.75. In the WNP-2 Plant, the as found separation between Class lE associated circuits and non-Class lE circuits did not confonn to these requirements. The applicant has begun a thorough evaluation of-t,hg-separation of these circuits. The applicant committed to W x N
8206090190 820529 w ef"._ADOCK 09000397 j cr-omce) .. . . .
sensaue ) .... . . . .. . ,,
oAre ) . . . . . .
moranuatav mo.ncuan r OFFlCIAL RECORD COPY usa >a se,-mu
M. Srinivasan MAY 2 81982 modify the design to bring any deviations from criteria found in the installation into conformance with the criteria identified in IEEE 384 as endorsed by R.G. 1.75.
- 3. Power Systems Branch Technical Position 1, Item 2, deals with load shedding and load. sequencing of the emergency loads to the bus.
The applicant in the FSAR proposed to retain' the load shedding feature during the sequencing of emergency loads onto the Class lE buses following a loss of offsite power. Load shedding in WNP No. 2 would be instituted only if bus voltage were to drop below 69% of the nominal bus voltage.
I reviewed the WNP-2 design regarding PSB BTP-1 during my site visit and found that the design, as shown on the drawings, automatically prevents load shedding of the emergency buses once the diesel generator is supplying power to the emergency buses. I indicated tc the applicant that the design drawings did not agree with the description in the FSAR.
They admitted that there was a discrepancy in the design due to a lack of communication between the applicant and his consulting company (Burns & Roe). Based on this indicatior of incorrect information in either the FSAR or drawings, tM applicant committed to amend the FSAR.
Subsequent to my site visit, the applicant and I held a conference call on May 21, 1982, during which the applicant stated he had decided to modify the drawings in accordance with the design information of FSAR. I requested that documentation of the drawings and a description of the modifications be provided. I expect this information to be provided shortly.
- 4. In the FSAR the diesel generator unit design is described as including an emergency override of the test mode to permit response to LOCA signals and return control of the diesel generator unit to the standby mode.
During the periodic testing of a diesel generator, if a safety-iiijection signal occurs, the diesel generator in the test mode is disconnected from parallel operation with the offsite power system and maintained in the emergency standby mode. In the actual design as found in the drawing review at WNP-2, the diesel generator in the test mode remains in parallel operation with offsite power system even though a LOCA signal occurs. The diesel generator unit will be manually tripped at the discretion of operator later on. In the mean time, the diesel generator would supply power to non-emergency loads through the tie breakers and non-Class lE buses as well as the emergency loads.
1 I
I omes > . . . . . . . . . . . . . . . . . . . ........................ . . . . . . . . . . . . .. ... . . . ..
suanee) . . . . . . . . . . . . . . . . . . . . . .................. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . .
care > . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..
C FCPM 318 (10-60) NRCM C243 OFFICIAL RECORD COPY usapo. i ii-335 co
me M. Srinivasan MAY 2 81982 The applicant had comitted to investigate this problem with the AE (Burns & Roe). At a conference call of May 21, 1982, the applicant indicated that this design was their final position. This design is not in accordance with the FSAR description nor with the staff position and is, therefore, unacceptable.
~
Sang Rhow Electrical Section Power Systems Branch, DSI
Enclosure:
Site Visit Agenda cc: R. Mattrsn L. Rubenstein A. Ungaro A. Schwencer R. Auluck DISTRIBUTION:
Central Files PSB RF l
t l
l l
l l
l i
l l
or,,c o .m :...PSB PSB 2 ' s -
sun ~auo #5iF . .. . . . . .
.J,EKni ght oro . 5/J.?./.82.. , ..sp.g82. , , . , , , . . , , , . , , . . . . . . . . . , , , , , ,, . , , , , , , , , , , , , , , , , , , , . , , , , , , , , , , , , , ,
sac rosu m oa-sa nacu cm OFFICIAL RECORD COPY ucro. u. -mm
~
3 WNP No. 2 Agenda Site Visit
- 1. Unresolved Items None
- 2. Control Room
- a. Diesel control board, D/G inoperable status alarm
- b. ESF initiation and bypass switch arrangement and status panel
- c. Annunciator panel
- d. D.C. system monitoring and alarm
- 3. Cab.le Runs and Cable Spreading
- a. t .2 of separation
- b. Penetrations and cable terminations
- c. Identification of cables and raceways
- 4. Switch Gear Rooms
- a. General layout
- b. Physical and electrical separation of redundant units
- 5. Battery and Charger Installations
- a. General layout
- b. Physical and electrical separation
- c. Ventilation independence
- d. Monitoring instrumentation and alarms
~
- 6. Diesel Generator
- a. Physical and electrical separation of redundant units
- b. D/G local control panels, instruments and control
- 7. Switchyard
- a. General layout
- b. Physical and electrical separation of transmission lines, buses, breakers w-
- c. Relay house
- d. Control power supplies (AC and DC)
- 8. Reactor Building
- a. General layout
- b. Separation of piping and cabling to redundant equipment
- 9. Shutdown Outsite Control Room
- a. Remote shutdown panel arrangement, separation and layout b.. Identification of control and monitoring equipment
- 10. ESF Systems and Pump Rooms
- a. General Layout
- b. Physical and electrical separation of redundant equipment
- c. Identification of cables, raceways and equipment t
- 11. Vital Instrumentation Power Supply Installation l
- a. General layout
- b. Physical and electrical separation
- c. Monitoring instrumentation
! d. Identification of cables, raceways and equipment
- 12. Turbine Building l
- a. Turbine overspeed protection system, instrumentation arrangement and layout .
l 1
-