Summary of 760429 Meeting W/Ge,Mark II Owners & Respective Aes Re GE 751105 Design Basis Document NEDE-21061, Mark II Containment Dynamic Forcing Function Info Rept (Dffr)
ML20214G450
Person / Time
Site: Nine Mile Point, Susquehanna, Columbia, Limerick, LaSalle, 05000000, Zimmer, Shoreham, Bailly
Issue date: 06/08/1976
From: Miner S
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
CON-WNP-0010, CON-WNP-10 NUDOCS 8605220153
Download: ML20214G450 (13)


Text

.

I i

~

1 JUN o 1976 l

l>0CKFT NOS: 50-322, 50-352 6 50-353, 50-358, 50-367, 53-37365%374,50-387650-388,l50-39/,

50-410 w APPLICANTS: Long Island LightinF Co., Philadelphia Electric, (*incinnati Cas and Electric Co., Northern Indiana Public Service Co.,

Consnonwealth Edisoa, Pennsylvania Power and Light Co.,

Washington Public Power Supply Systen and Miagara Mohawk Tower Corporation l'ACILITICS: Shoreham Nuclear Power Station Unit No. 1, Limerick Generating Station Units No. I and No. 2, William 11. Zimmer Nuclear Power Station, Unit 1, Pailly Generating Statien Muclear 1, LaSalle Coimty Station l' nits No. I and No. 2, Suaquehanna Steam Electric Station Units t'o. I and Fo. 2, WPPSS Nuclear Project No. 2, Nine File Point Nuclear Station Unit ?'o. 2 EU" MARY OF MEETING llELD ON APRIL 29, l'176 UITH MARF II OWNERS on ?;ovember 5, 1975, the Cencral Electric Company subnitted, for the

tark II ownera group, a design basis docunent desitnated as " wark II Containment Dynamic Forcing Function Information Peport (DFFR)",

.:E.10 21001 and NEDE 21061P. Subsequently each of the Mark II owners subnitted a plant specific report. The NRC staff during their preliminary review of the DFFR and the various plant specific reporta found that there vas a considerable variation in the manner in which the DFFR was applicil by each Mark II owner in his plant specific evaluation, t meeting was held on April 29, 1976, hetveen represent-atives of the Mark II owners, their architect engineers, the General 1:lectric Coin any and the NRC staff to determine whether a comon basis for loads and c:argins could be included in the DFFR so that the document could be reviewed to a much greater extent on a generic basin, applicable to all ?' ark II containments. In addition the status and schedule of the ?tark II Pool Wnanic Loading Program were discussed. The attendec<-

list, the meeting agenda, and copies of some of the slides used in the i rnsentation nade at the meeting are enclosed. The remainder of the nii 'ea are available in my of fice.

orreca w _ . _ _ - .- - - - - -- -~

,wa= n es s e .

ears * - . _ -- -- -- - - ~ - - - - ' ' - - " ~ ' - * - -

Foean AEC.)l3 (Rev. FS H AECM 0240 W u. s. eovanness=v ene=ve=e orrecai e,re.saa.see 8605220153 760608 PDR ADOCK 05000322 A PDH

i

\

l 1

l JUN 2 1976 j The following principal topics were discussed, l

1. Dynamic Forcing Functio _n Information Report - DFFR The DFFR was issued in September'1975. Revision No. 1 consisting of errata and editorial changes was substitted in April 1976. 'The l DFFR was intended to provide bounding load methodology for use by the Mark II owners. However, it was not mandatory that all the Mark II owners follow the DFFR nor would all the owners make a couraiement to follow the DFFR completely.
2. Supportiny, Program Parallel with the preparation of the DFFR, the Mark II owners sponsored a test and analysis support program (see enclosure).

The purpose of the program is to provide test information to support the DFFR and to refine the analytical techniques in the DFFR.

A docu:.ent providing more details on the supporting program will be supplied by the end of May.

3. "4T" P_ool Swell Tests The 4T tests which are part of the supporting program are in progress.

Phase I testing was completed and the test report will be provided by the end of Mav. CE stated that the test resulte confirm the DFFR load methodology except that a condensation load on the well was measured. The DFFR indicates that this load is not significant.

4. Rectrig_Pove;r ,Re; search Institute (EPRI) Tests EPRI is conducting multi-downconer tests on a scale model. The purpose of the test is to provide motion pictures of the pool swell during blowdovn through more than one downconer. The motion pictures are expected to be available in '!ay.
5. FSAR Schedula The ark II owners provided the following dates bv when they expect to subuit their FSAR; (a) LaSalle County Station Unit No. I and ?;o. 2 -

August 1976, (b) WPPSS Nuclear Project No. 2 - late July 1976, (c)

Litteric!: Generating Station Units No. I and No. 2 - Decenber 1977, (d) Susquehanna Stean Electric Station Units No. I and No. 2 - First Ouarter 1978, and (e) Nine Mile Point Nuclear Plant No. 2 - 197A-1979.

o# Pet e 9= ,, ,,n,,,,,,,,, . , , , , , , , , , , , , , ,,, , , , , . , . _ , , , , , , , _ , , , .

e u.a . - .

  • _ _. . , . . .__ -

DA f g en _

Forms AEC.)l4 ( Rev. 9-9 9 ) AECM 024J W t . s. novs amass =t resafe=e otess es sete.sas ese

i

- 3- JUN 0 1976 sumary The intent of the April 29 meeting was to determine whether a cosemon basis for loads and margin could be included in the DFFR so that it could be reviewed to a much greater extent on a generic basis applicable to all Mark II containments. Itowever, the various 'iark II owners held that the design differences between the various Mark II contaimeents make any further significant review on a generic basis impractical and therefore wished to proceed on an individual plant basis. We indicated we could follow this approach and will proceed to review each Mark II containment on an individuni basis. We also stated that for this approach each containment vill be reviewed during the operatinct license review phase for that specific plant.

DNWhid by Sydney Miner, Project Manager Light Water Reactors Branch 4 Division of Project Management Euclosures

1. Tne Attendance List
2. Agenda
3. Copies of Slides l

l l

LWR 4 7 LWR 4 or e.c e e.

g .. . . . .-- - - . - .

. ..... SMiner/ red IWRBut1er._ . _ . . . . . , _

l .... 6/ 7 /76 6/7/76 - - ---

Ferns AEC 318 (R *. 9 9)) AZO 4 0240 # u. s. eavs.=msat ***mve=e orric as ***e.sas.ies

i

' ENCLOSURE 1 MARK II CONTAINMENT MEETING APRIL 29, 1976 ATTENDANCE LIST NRC BECHTEL LILCO Sydney Miner E. L. McFarland Joseph P. Novarro Clifford Anderson H. R. Schmiedel H. Chau T. M. Su Andrew B2tes F. Schauer NUTECH ~

GE A. Bournia W. R. Butler A. F. Deardorff Dana C. Ditmore W. F. Kane L. H. Frauenholz R. Tedesco R. E. Schaffstall P. F. Riehm CIN GAS & ELEC A. R. Smith M. D. Lynch COMPANY J. Snell C. P. Tan J. D. Flynn CECO S. P. Chan H. C. Brinkmann G. Lainas Brent Shelton SARCENT & LUNDY NNPC Ray M. Crawford S. F.. Manno B. A. Erler PECO PP&L R. H. Logue W. E. Barberich W. J. Rhoades WPPSS BURNS & ROE G. L. Gelhaus Don Baker Bedros Bedrosian STONE & WEBSTER ,

NIPSCO

~

W. P. Hennessy J. W. Dunn D. J. Alexander D. J. Heesen Ron Klause

  • i 4/27/7c ENCLGitz: 2 MARX II POOL DYNAMIC LOAD STATUS REPORT NRC/ OWNERS G?OUP/GC PROPOSED '!EETIN" AGENDA NRC AGENDA AGENDA ITEM I I Schedule for the Mark II Owners Group Pool Dynamic Load Program II II Status of the Mark II Owners Group

& . Pool Dynamic Load Program III F A Overview of Phenomena Investigated B Summary of Analytical Results and Documentation C Summary of Test Results and Documentation D Future Analysis and Tests III Sta tt s and Basis of the Dynamic Forcing Function Repoi t (DFFR)

III A,B,C A Application of the DFFR to Design Assessmen:

(

IV B Basis of the DFFR Load Methodology III E C Report Update III D IV Discussion of NRC Questions V V Plant Unique Assess ent Report -

Summary, Conclusion,s, and NRC Review Schedule t .

1 1

E':CLn5URE 3 I MARK I'I SUP{ DATING PROGRAM STATUS UP-DATE Activity Targeted Program Activity Type Completion Date A. LOCA Related Activities

1. "4T" Pool Swell Test Test Phase I Report End of May 1976 Phase II Report September 1976
2. DFFR Pool Swell Velocity Analysis November 1976 Breakthrough Mcdel Confirmation
3. Impact Tests on Pool Test Complete Internal Structurcs (NEDE-13426P & NEOC-20989-2P)
4. Qualify Impact Model Analysis Compl e te (NEDE-13426P & NEDC-20989-2P)

B. Safety / Relief Valve Related Activities

1. Relief Valve Pipe Clearing Analysis May 1977 Model for Quencher (Confirmation of Model)
2. Relief Valve Pipe Clearing ' Analysis Complete Model for Ramshead & Test ~

(NED0-20942, NEDE-20942P, NE00-21062 & NEDE-21062P)

3. In-Plant Test of S/R Test End 4th Quarter 1976 Valve Discharge Loads During Consecutive Actuations (Ramshead)
4. DFFR Relief Valve Analysis late 2nd Quarter 1977 Consecutive Actuation Transient Analysis Confirmation
5. In-Plant Test of S/R Test September 1977 Valve Discharge Loads During Consecutive Actuations (Quencher)
6. Safety / Relief Valve Steam Analysis End 4th Quarter 1976 Discharge Thermal Mixing (Confirmation of Model)

. l C. MARK II Supporting Report End of May 1976 Program Report 1

i MARK 11 C0tlTAlllMEllT TASK FORCE: .

DFFR OBJECTIVES:.

1. METHODOLOGY FOR PRELIMlllARY DESIGli LOADS JUSTIFICATIO;l C0ilSISTEiiT WITH TEST DATA 2.

, 3. TIMELY RESP 0ilSE T0 flRC QUESTI0ils 9

I l

i e

I

i 4/28/76 -

MARK II CONTAltJMEtJT TASK FORCE

?

DAR OsaECTIvES:

1. DE$IGt{ ASSESSMENT OF EXISTING PLANT 2.. IDENTIFICATI0tl 0F DE.S!GN MODIFICATIONS
3. TIMELY RESPONSE TO NRC QUESTIONS DAR RESULTS:
1. LOAD DEFINITION
2. EXISTING STRUCTURES ACCOMMODATE DYNAMIC POOL LOAcS
3. SOME DESIGN MODIFICATIONS REQUIRED h

a e

'. 4/28/76

.. ~

MARK II CONTAINMENT IASK FORCE

?

LOAD METHOD 0LCGY OBJECTIVES:

1. COMMON BASIS FOR LOAD IDENTIFICATION
2. COMMON BASIS FOR LOAD COMBINATIONS
3. COMMON BASIS FOR PLANT SPECIFIC LOADS
4. COMMON BASIS FOR STRUCTURAL LOAD FACTORS
5. COMMON BASIS FOR LOAD HARGIN CO'MMONDESIGNFEATUREb

~

.l. DOWNCOMER LOADS UNIQUE DESIGN FEATURES

1. SRfDISCHARGE

~

l l 2.

POOL = SWELL l

l l'

~

t 1

l I o

DISTRIBUTION Dock'et Files R. Maccary NRC PDR D. Ross Local PDR R. Tedesco TIC J. Knight

, NRR Reading S. Pawlicki

- - LWR 3 File I. Sihweil B. C. Rusche P. Check E. C. Case T. Novak ,

R. S. Boyd Z. Rosztoczy R. C. DeYoung- V. Beneroya i R. Denise G. Lainas D. Skovholt T. Ippolito

.T . Stolz V. Moore K. Kniel R. Vollmer O. Parr M. Ernst U. Butler W. Gamnill D. Vassallo G. Knighton R. Clark B. Youngblood T. Speis W. Regan ,

P. Collins D. Bunch

, C. Ileltemes J. Collins-

{~~ R. Houston W. Kreger S. Varga R. Ballard

, J. Miller- M. Spangler F. J. Williams J. Stepp R. Heineman L. Hulman 4 H. Denton j ' Project !!anager

!' Attorney, ELD IE (3)

11. Rushbrook NRC participants i

, ACRS (16) ,

i:

i-4 4

a j.

I f

I i

i

?

I N

'. 1 Long Island Lighting Company Honorable Lawrence Coughlin ATTN: Andrew W. Wofford House of Representatives Vice President Congress of the United States 175 East Old Country Road Washington, D. C. 20515 Hicksville, New York 11801 Roger B. Reynolds, Jr. , Esq.

Edward M. Barrett, Esq. 324 Swede Street General Counsel Norristown, Pennsylvania 19401 -

Long Island Lighting Company 250 Old Country Road Willard C. Hetzel, Esq.

Mineola, New York 11501 312 Main Street East Greenville, Pennsylvania 18041 Edward J. Walsh, Esq.

General Attorney Lawrence Sager, Esq.

Long Island Lighting Company Sager & Sager Associates 250 Old Country Road 45 High Street Mineola, New York 11501 Pottstown, Pennsylvania 19464 Hr. Thomas Burke Joseph A. Smyth Project Manager Assistant County Solicitor Shoreham Nuclear Power Station County of Montgomery P. O. Box 618 Cou'thouse Wading River, New York 11792 Norristown,' Pennsylvania 19404 Dr. William E. Seymour Eugene J. Bradley Staff Coordinator Philadelphia Electric Company New York State Atomic Energy Council Associate General Counsel New York State Department of Commerce 2301 Market Street 99 Washington Street Philadelphia, Pennsylvania 19101 Albany, New York 12210 The Cincinnati Gas and Philadelphia Electric Company Electric Company ATTH: Edward G. Bauer, Jr. ATTN: Mr. Earl A. Borgmann Vice President & General Counsel Vice President - Engineering 2301 Market Street P. O. Box 960 Philadelphia, Pennsylvania 19101 Cincinnati, Ohio 45201 Troy B. Conner, Jr. , Esq. Troy B. Conner, Jr. , Esq.

Conner & Knotts Conner & Knotts 1747 Pennsylvania Avenue, N. W. 1747 Pennsylvania Avenue, N. W.

Washington, D. C.. 20006 Washington, D. C. 20006 W. William Anderson, Esq. Mr. William J. Moran Deputy Attorney General General Counsel Room 512, Main Capitol Bldg. The Cincinnati Gas and Harrisburg, Pennsylvania 17120 Electric Company P. O. Box 960 Frank R. Clokey, Esq. Cincinnati, Ohio 45201 Special Assistant Attorney General Room 219, Towne House Apartments Mr. William G. Porter, Jr.

P. O. Box 2063 Porter, Stanley, Arthur, Harrisburg, Pennsylvania 17105 and Platt 37 West Broad Street Columbus, Ohio 43215

s ss I

Mr. Robert Killen, Chairman Mr. Stephen Schumacher of the Board & Chief Miami Valley Power Project Executive Officer P. O. Box 252 The Dayton Power and Light Company Dayton, Ohio 45401 P. O. Box 1034 Dayton, Ohio 45401 Timothy S. Hogan, Jr., Chairman Board of Commissioners J. Robert Newlin, Counsel 50 Market Street Clermont County ,

The Dayton Power and Light Company Batavia, Ohio 45103 P. O. Box 1034 Dayton, Ohio 45401 Northern Indiana Public Service Company ATTN: Mr. H. P. Lyle, Vice President Clermont County Library Electric Production & Engineering Third and Broadway Streets 5265 Hohman Avenue Batavia, Ohio 45103 Hammond, Indiana 463,25 Mr. James D. Flynn, Manager Meredith Hemphill, Jr. , Esq.

Licensing and Environmental Affairs Assistant General Counsel The Cincinnati Gas and Electric Company Bethlehem Steel Corporation P'. O. Box 960 Martin Tower Cincinnati, Ohio 45201 Bethlehem, Pennsylvania 18016 Mr. J. P. Fenstermaker William H. Eichhorn, Esq.

Senior Vice President - Operations Schroer, Eichhorn & Morrow Columbus and Southern Ohio 5243 Hohman Avenue Electric Company Hammond, Indiana 46320 215 North Front Street Columbus, Ohio 43215 Mr. Edward W. Osann, Jr.

Wolfe, Hubbard, Leydid, Voit & Osann, Ltd.

David'B. Fankhauser, PhD Suite 4600 3569 Nine Mile Road One IBM Plaza Cincinnati, Ohio 45230 Chicago., Illinois 60611 Gary P. Kreider, Esq. Marvin N. Benn, Esq.

Keating, Muething and Klekamp Special Assistant Attorney General 18th Floor, Provident Tower 134 North LaSalle Street One East Fourth Street Suite 2222 Cincinnati, Ohio 45202 Chicago, Illinois 60602

, Ms. Mari B. Snell Robert J. Vollen, Esq.

8801 Brittany Drive 109 North Dearborn Street Cincinnati, Ohio 45242 Chicago, Illinois 60602 Stephen T. Sonneville, Chairman Commonwealth Edison Company Greater Cincinnati Citizens ATTN: Mr. Byron Lee, Jr.

Solid Waste Project -

Vice President 6628 Afton Avenue P. O. Box 767 Cincinnati, Ohio 45213 Chicago, Illinois 60690 Thomas A. Luebbers, Esq. Richard E. Fowell, Esq.

Cincinnati City Solicitor Isham, Lincoln & Beale Room 214, City Hall One First National Plaza, Suite 4200 Cincinnati, Ohio 45202 Chicago, Illinois 60670

1 Mr. Brent Shelton, Chairman Arvin E. Upton, Esquire Mark II Owners Group LeBoeuf, Lamb, Leiby & MacRae Commonwealth Edison Company 1757 N F.reet, N. W.

P. 0.~ Box 767 Washington, D. C. 20036 Chicago, Illinois 60690 Miss Juanita Kersey, Librarian Mr. Norman W. Curtis Oswego City Library ,

Vice President - Engineering 120 E. Second Street

& Construction Oswego, New York 13126 Pennsylvania Power & Light Company 2 North Ninth Street Mr. Richard Goldsmith Allentown, Pennsylvania 18101 Syracuse University College of Law Mr. Earle M. Mead, Project Manager E. I. White Hall Campus Pennsylvania Power & Light Company Syracuse, New York 13210 2 North Ninth Street Allentown, Pennsylvania 18101 Dr. William E. Seymour Staff Coordinator Gerald Charnoff, Esquire New York State Atomic Energy Council Shaw, Pi ttman, Potts, Trowbridge New York State Department of Commerce

& Madden 99 Washington Street Barr Building Albany, New York 12210 910 17th Street, N.W.

Washington, D. C. 20006 Anthony Z. Roisman, Esquire Berlin, Roisman & Kessler Mr. William E. Barberich 1712 N Street N. W.

Licensing Engineer Washington, D. C. 20036 Pennsylvania Power & Light Company -

2 North Ninth Street Allentown, Pennsylvania 18101 Washington Public Power Supply System ATTN: Mr. J. J. Stein Managing Director 301 Fifth Avenue P. O. Box 968 Richland, Washington 99352 Richard O. Quigley Esq.

Washington Public. Power Sucply System P. O. Box 968 Richland, Washington 99352 Niagara Mohawk Power Corporation -

ATTN: Mr. Gerald K. Rhode Vice President - Engineering 300 Erie Boulevard West Syracuse, New York 13202

_