Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20058M1861993-09-22022 September 1993 Summary of Operating Reactors Events Meeting 93-35 on 930915 ML20246F8691989-06-22022 June 1989 Summary of Operating Reactors Events Meeting 89-24 on 890621.On 890615,potential Unmonitored Primary Coolant Release Path to Environ Discovered at WPPSS-2.On 890617,loss of Offsite Power Occurred at Brunswick,Unit 2 ML20155B8231988-09-20020 September 1988 Summary of Operating Reactors Events Meeting 88-37 on 880920.Info Encl Includes rept-to-date of long-term Followup Assignments & Summary of Reactor Scrams ML20214P6121987-05-27027 May 1987 Summary of Operating Reactors Events Meeting 87-14 on 870512 W/Nrr,Res,Aeod & Regional Ofcs Re Events Which Occurred Since 870507 Meeting.List of Attendees & Viewgraphs Encl ML20207L9571986-11-18018 November 1986 Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info Encl IA-86-855, Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info Encl1986-11-18018 November 1986 Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info Encl ML20206J6561986-06-23023 June 1986 Trip Rept of 860612 Training Session in Lacey,Wa Re Federal Radiological Emergency Response Plans & Meeting W/Utils & State of Wa Concerning Potential Emergency Preparedness Issues.Attendees Listed & Training Agenda Encl ML20210J0261986-03-24024 March 1986 Summary of Operating Reactor Events Meeting 86-08 on 860317 to Discuss Events Occurring Since Last Meeting on 860310 ML20128N4771985-05-22022 May 1985 Summary of Operating Reactors Events 850515 Meeting.Div Directors or Representatives Briefed on Events Occurring Since 850507 Meeting.Assignment of Followup Review Responsibilities Discussed.Attendance List Encl ML20197G2091983-12-12012 December 1983 Trip Rept of 831206 Site Visit Re Cable & Cable Tray Separation,Installation of Barriers,Fire Protection & Cable Spreading Room.Plant Ready for Fueling Pending Minor Preoperational Tests ML20197G1511983-12-0909 December 1983 Trip Rept of 831206 Site Visit Re Readiness Review.No Reason Noted to Recommend Delay in or Addl Restrictions Upon Low or Full Power License ML20213E4041983-04-13013 April 1983 Trip Rept of 830322-25 Visit to Richland,Wa to Conduct Fire Protection Site Audit.Concerns Discussed ML20213E1581982-05-28028 May 1982 Trip Rept of 820512 & 13 Site Visit to View Installation & Arrangement of Electrical Equipment & Cables,To Verify Implementation of Design Criteria & to Resolve Differences Between Plant Design & NRC Positions.Agenda Encl ML20213E1471982-05-19019 May 1982 Summary of 820518 Meeting W/Util Re Possible Impact of Seismic Reflection Profiling W/Special Emphasis on Southeast Anticline Fault ML20213E1321982-04-26026 April 1982 Trip Rept of 820412-14 Site Visit to Examine Trenches & Cores.List of Attendees Encl ML20098D1991982-04-23023 April 1982 Summary of 820423 Special Meeting of WPPSS Executive Board in Richland,Wa Re Financial Problems W/Continued Const of Facilities.Notices of Adjournment Encl ML20098D1371982-04-23023 April 1982 Summary of 820423,28 & 29 Regular Meetings of WPPSS Board of Directors in Richland,Wa Re Units 4 & 5 Termination Program, Claim Vouchers & BPA Finance Proposal.Notice of Adjournment for 820423 Meeting Encl ML20098D1121982-04-0505 April 1982 Summary of 820405 Special Meeting of WPPSS Executive Board in Richland,Wa Re Status of Projects,Selection of Cost Effectiveness Study Consultant,Bpa Draft Power Load Forecast & Units 4 & 5 Termination Program ML20213E1091982-03-31031 March 1982 Trip Rept of 820322 Visit to Richland & Seattle,Wa to Inspect Plant Spray Ponds & to Discuss Recent NRC & Util Modeling Studies on Spray Pond Cooling & Water Loss ML20213D9361981-12-0707 December 1981 Trip Rept of 811005 Visit to Denver,Co & Richland,Wa to Discuss Site Drainage Plans,Meeting W/Westec Consultants on Possible Orographic Effects & Duration of Rainfall & Meeting W/Pnl to Discuss Safety & Environ Review Procedures ML20213D9131981-11-12012 November 1981 Forwards Summary of 810929-30 & 1001-02 Design Audit Meetings W/Util in Woodbury,Ny Re All Structural Engineering Areas.W/O Encl ML17276A1761981-11-0202 November 1981 Forwards Minutes from Mechanical Engineering Branch 810929-30 & 1001 Meetings in Woodbury,Ny & 811016 Preservice Insp Meeting in Washington,Dc.Agenda Items from Both Meetings & Subsequent Resolution Encl ML20213D9061981-10-30030 October 1981 Summary of 810914-17 Meetings W/Util in Richland,Wa Re NRC Concerns in Containment Sys Area ML20213D8951981-10-30030 October 1981 Summary of 811007 Meeting W/Util in Bethesda,Md Re Soil Backfilling Compaction & Testing Program ML20213D8811981-10-30030 October 1981 Summary of 810925 Meeting W/Util in Bethesda,Md Re Open Issues in Instrumentation & Control Sys Area ML20213D8701981-10-27027 October 1981 Summary of 810929-1001 Meetings W/Util in Woodbury,Ny Re Open Issues in Mechanical Engineering Branch Area ML20213D3241980-09-18018 September 1980 Summary of 800805 Meeting W/Util & Consultants in Chicago,Il Re Facility Plant Unique Safety/Relief Valve Discharge Load Specification.Attendance List Encl ML20213D1971980-04-15015 April 1980 Forwards Summary of 800401-02 Meeting W/Savannah River Lab, Util,Ge & Burns & Roe in Richland,Wa Re FSAR Changes Resulting from Applicant Rewrite of Chapter 7 & to Conduct Site Tour of Facility ML20148C1311979-12-20020 December 1979 Summary of Meeting W/Mark II Owners Group in Bethesda,Md Re Status of Several long-term Program Tasks in Advance of Final Documentation.Agenda,List of Attendees & Viewgraphs Encl ML20213D0331979-08-22022 August 1979 Summary of 790717-18 Meeting W/Mark II Owners Group Re long-term Program Tasks ML20213C8911979-03-14014 March 1979 Summary of 790213-14 Meeting W/Mark II Owners Group Re Lead Plant Acceptance Criteria & Intermediate Plant Program Tasks ML20214G8711978-01-11011 January 1978 Summary of 771202 Meeting W/Ge Re Rev 1 to NEDO-10466, Power Generation Control Complex Design Criteria & Safety Evaluation. List of Meeting Attendees Encl ML20214G8691978-01-10010 January 1978 Summary of 770518-19 Meetings W/Mark II Owners & GE Re Mark II Containment Pool Dynamic Loads Program ML20214G8451977-12-0202 December 1977 Summary of 770510 Meeting W/Mark II Owners Executive Committee Re Mark II Containment Dynamic Loads Program.List of Attendees & Viewgraphs Encl ML20214G8351977-11-29029 November 1977 Summary of 770401 & 0707 Meetings W/Mark II Owners & GE Re Methods for Combining Dynamic Loads for Structural Design of Mark II Containment.List of Attendees & Viewgraphs Encl ML20214G8141977-11-22022 November 1977 Summary of 771116-17 Meetings W/Washington Energy Facility Site Evaluation Council in Richland,Wa Re Status of Plant & Impact of Aid to Mitigate Socioeconomic Impacts Resulting from Plant Const ML20214G7951977-08-0202 August 1977 Summary of 770729 Meeting W/Utils & GE Re Mark II Containment Pool Dynamic Load Program ML20214G7841977-06-23023 June 1977 Summary of 770615 Meeting W/Utils & GE Re Mark II Containment Pool Dynamic Loads.List of Attendees Encl ML20214G7741977-06-0808 June 1977 Summary of 770526 Meeting W/Mark II Owners & GE Re Mark II Containment Pool Dynamic Loads.List of Meeting Attendees Encl ML20214G6951977-04-18018 April 1977 Summary of 770216-17 Meeting W/Mark II Owners,Ge & BNL Re Mark II Containment Pool Dynamic Load Support Program.List of Meeting Attendees & Viewgraphs Encl ML20214G4271976-12-29029 December 1976 Summary of 761202 Meeting W/Mark II Owners & GE Re Mark II Containment Structural Design & Pool Dynamic Loads Supporting Program.Attendee List & Viewgraphs Encl ML20214G4371976-12-0707 December 1976 Summary of 761027-28 Meetings W/Mark II Owners,Ge & BNL Re Pool Dynamic Loads Analytical Model & Test Program.Lists of Attendees & Viewgraphs Encl ML20214G4501976-06-0808 June 1976 Summary of 760429 Meeting W/Ge,Mark II Owners & Respective Aes Re GE 751105 Design Basis Document NEDE-21061, Mark II Containment Dynamic Forcing Function Info Rept (Dffr) ML20214G6031975-08-26026 August 1975 Summary of 750821 Meeting W/Mark II Owners,Sargent & Lundy, Bechtel,S&W & B&R in Bethesda,Md Re Load Factors & Load Combinations for Assessing Capability of Mark II Containments to Accommodate Safety/Relief Valve Loads ML20214G7791975-07-0303 July 1975 Summary of 750630 Meeting W/Mark II Owners,Aes & GE in Bethesda,Md Re Role of Mark II Owners,Status of Const of Various Mark II Units & Program for Determining Mark II LOCA & Safety/Relief Valve Loads ML20214G5351974-11-0101 November 1974 Summary of 741018 Meeting W/Util & B&R Re Sacrificial Shield Pressure Response post-CP Review.List of Attendees Encl ML20198F0921974-08-0909 August 1974 Trip Rept of 740715 Site Visit for Site Review.Relationship of Proposed WPPSS Units 1 & 4 to WPPSS Unit 2 & Location of Future Effluent Discharge Line on Columbia River Noted ML20214G8191973-11-21021 November 1973 Summary of 731017-18 Meetings W/Util,B&R & GE in Bethesda,Md Re Outstanding post-CP Items ML20214G8121972-11-13013 November 1972 Summary of 721026 Meeting W/Util,B&R,Usgs & Geological Consultant in Denver,Co Re Util Plans for Resolving Contradictions in Geological Data in PSAR & Ambiquities in Regional Geological Analysis ML20214G4601972-08-21021 August 1972 Summary of 720804 & 09 Meetings W/Util & B&R in Bethesda,Md Re Adequacy of 20% of Critical Damping for Horizontal & Vertical Response Used by Applicant for Soil Structure Interaction During Seismic Event.Attendees List Encl 1993-09-22
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20058M1861993-09-22022 September 1993 Summary of Operating Reactors Events Meeting 93-35 on 930915 ML20246F8691989-06-22022 June 1989 Summary of Operating Reactors Events Meeting 89-24 on 890621.On 890615,potential Unmonitored Primary Coolant Release Path to Environ Discovered at WPPSS-2.On 890617,loss of Offsite Power Occurred at Brunswick,Unit 2 ML20155B8231988-09-20020 September 1988 Summary of Operating Reactors Events Meeting 88-37 on 880920.Info Encl Includes rept-to-date of long-term Followup Assignments & Summary of Reactor Scrams ML20214P6121987-05-27027 May 1987 Summary of Operating Reactors Events Meeting 87-14 on 870512 W/Nrr,Res,Aeod & Regional Ofcs Re Events Which Occurred Since 870507 Meeting.List of Attendees & Viewgraphs Encl IA-86-855, Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info Encl1986-11-18018 November 1986 Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info Encl ML20207L9571986-11-18018 November 1986 Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info Encl ML20210J0261986-03-24024 March 1986 Summary of Operating Reactor Events Meeting 86-08 on 860317 to Discuss Events Occurring Since Last Meeting on 860310 ML20128N4771985-05-22022 May 1985 Summary of Operating Reactors Events 850515 Meeting.Div Directors or Representatives Briefed on Events Occurring Since 850507 Meeting.Assignment of Followup Review Responsibilities Discussed.Attendance List Encl ML20213E1471982-05-19019 May 1982 Summary of 820518 Meeting W/Util Re Possible Impact of Seismic Reflection Profiling W/Special Emphasis on Southeast Anticline Fault ML20213D9131981-11-12012 November 1981 Forwards Summary of 810929-30 & 1001-02 Design Audit Meetings W/Util in Woodbury,Ny Re All Structural Engineering Areas.W/O Encl ML17276A1761981-11-0202 November 1981 Forwards Minutes from Mechanical Engineering Branch 810929-30 & 1001 Meetings in Woodbury,Ny & 811016 Preservice Insp Meeting in Washington,Dc.Agenda Items from Both Meetings & Subsequent Resolution Encl ML20213D8811981-10-30030 October 1981 Summary of 810925 Meeting W/Util in Bethesda,Md Re Open Issues in Instrumentation & Control Sys Area ML20213D8951981-10-30030 October 1981 Summary of 811007 Meeting W/Util in Bethesda,Md Re Soil Backfilling Compaction & Testing Program ML20213D9061981-10-30030 October 1981 Summary of 810914-17 Meetings W/Util in Richland,Wa Re NRC Concerns in Containment Sys Area ML20213D8701981-10-27027 October 1981 Summary of 810929-1001 Meetings W/Util in Woodbury,Ny Re Open Issues in Mechanical Engineering Branch Area ML20213D3241980-09-18018 September 1980 Summary of 800805 Meeting W/Util & Consultants in Chicago,Il Re Facility Plant Unique Safety/Relief Valve Discharge Load Specification.Attendance List Encl ML20213D1971980-04-15015 April 1980 Forwards Summary of 800401-02 Meeting W/Savannah River Lab, Util,Ge & Burns & Roe in Richland,Wa Re FSAR Changes Resulting from Applicant Rewrite of Chapter 7 & to Conduct Site Tour of Facility ML20148C1311979-12-20020 December 1979 Summary of Meeting W/Mark II Owners Group in Bethesda,Md Re Status of Several long-term Program Tasks in Advance of Final Documentation.Agenda,List of Attendees & Viewgraphs Encl ML20213D0331979-08-22022 August 1979 Summary of 790717-18 Meeting W/Mark II Owners Group Re long-term Program Tasks ML20213C8911979-03-14014 March 1979 Summary of 790213-14 Meeting W/Mark II Owners Group Re Lead Plant Acceptance Criteria & Intermediate Plant Program Tasks ML20214G8711978-01-11011 January 1978 Summary of 771202 Meeting W/Ge Re Rev 1 to NEDO-10466, Power Generation Control Complex Design Criteria & Safety Evaluation. List of Meeting Attendees Encl ML20214G8691978-01-10010 January 1978 Summary of 770518-19 Meetings W/Mark II Owners & GE Re Mark II Containment Pool Dynamic Loads Program ML20214G8451977-12-0202 December 1977 Summary of 770510 Meeting W/Mark II Owners Executive Committee Re Mark II Containment Dynamic Loads Program.List of Attendees & Viewgraphs Encl ML20214G8351977-11-29029 November 1977 Summary of 770401 & 0707 Meetings W/Mark II Owners & GE Re Methods for Combining Dynamic Loads for Structural Design of Mark II Containment.List of Attendees & Viewgraphs Encl ML20214G8141977-11-22022 November 1977 Summary of 771116-17 Meetings W/Washington Energy Facility Site Evaluation Council in Richland,Wa Re Status of Plant & Impact of Aid to Mitigate Socioeconomic Impacts Resulting from Plant Const ML20214G7951977-08-0202 August 1977 Summary of 770729 Meeting W/Utils & GE Re Mark II Containment Pool Dynamic Load Program ML20214G7841977-06-23023 June 1977 Summary of 770615 Meeting W/Utils & GE Re Mark II Containment Pool Dynamic Loads.List of Attendees Encl ML20214G7741977-06-0808 June 1977 Summary of 770526 Meeting W/Mark II Owners & GE Re Mark II Containment Pool Dynamic Loads.List of Meeting Attendees Encl ML20214G6951977-04-18018 April 1977 Summary of 770216-17 Meeting W/Mark II Owners,Ge & BNL Re Mark II Containment Pool Dynamic Load Support Program.List of Meeting Attendees & Viewgraphs Encl ML20214G4271976-12-29029 December 1976 Summary of 761202 Meeting W/Mark II Owners & GE Re Mark II Containment Structural Design & Pool Dynamic Loads Supporting Program.Attendee List & Viewgraphs Encl ML20214G4371976-12-0707 December 1976 Summary of 761027-28 Meetings W/Mark II Owners,Ge & BNL Re Pool Dynamic Loads Analytical Model & Test Program.Lists of Attendees & Viewgraphs Encl ML20214G4501976-06-0808 June 1976 Summary of 760429 Meeting W/Ge,Mark II Owners & Respective Aes Re GE 751105 Design Basis Document NEDE-21061, Mark II Containment Dynamic Forcing Function Info Rept (Dffr) ML20214G6031975-08-26026 August 1975 Summary of 750821 Meeting W/Mark II Owners,Sargent & Lundy, Bechtel,S&W & B&R in Bethesda,Md Re Load Factors & Load Combinations for Assessing Capability of Mark II Containments to Accommodate Safety/Relief Valve Loads ML20214G7791975-07-0303 July 1975 Summary of 750630 Meeting W/Mark II Owners,Aes & GE in Bethesda,Md Re Role of Mark II Owners,Status of Const of Various Mark II Units & Program for Determining Mark II LOCA & Safety/Relief Valve Loads ML20214G5351974-11-0101 November 1974 Summary of 741018 Meeting W/Util & B&R Re Sacrificial Shield Pressure Response post-CP Review.List of Attendees Encl ML20214G8191973-11-21021 November 1973 Summary of 731017-18 Meetings W/Util,B&R & GE in Bethesda,Md Re Outstanding post-CP Items ML20214G8121972-11-13013 November 1972 Summary of 721026 Meeting W/Util,B&R,Usgs & Geological Consultant in Denver,Co Re Util Plans for Resolving Contradictions in Geological Data in PSAR & Ambiquities in Regional Geological Analysis ML20214G4601972-08-21021 August 1972 Summary of 720804 & 09 Meetings W/Util & B&R in Bethesda,Md Re Adequacy of 20% of Critical Damping for Horizontal & Vertical Response Used by Applicant for Soil Structure Interaction During Seismic Event.Attendees List Encl ML20198F7891972-05-25025 May 1972 Summary of 720525 Meeting W/Util Re Environ Review Schedule of Application ML20214G6251972-03-14014 March 1972 Summary of 711212-15 Site Visit W/Util & B&R Re Geological Reconnaissance in Hanford,Wa.Attendance List Encl ML20214G6361972-02-24024 February 1972 Summary of 721215 & 16 Meetings W/Util B&R,Usgs & GE in Kennewick,Wa Re Site Geology,Hydrology & Applicable Fftf Published Info.Attendance List Encl ML20214G7221971-11-16016 November 1971 Summary of 711028 Meeting W/Util,Bpa,Ge & B&R Re Schedule Requirements & to Review Anticipated Problem Areas Recently Encountered W/Other BWRs 1993-09-22
[Table view] |