ML20214G774

From kanterella
Jump to navigation Jump to search
Summary of 770526 Meeting W/Mark II Owners & GE Re Mark II Containment Pool Dynamic Loads.List of Meeting Attendees Encl
ML20214G774
Person / Time
Site: Nine Mile Point, Susquehanna, Columbia, Limerick, LaSalle, 05000000, Zimmer, Shoreham, Bailly
Issue date: 06/08/1977
From: Miner S
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
CON-WNP-0182, CON-WNP-182 NUDOCS 8605220489
Download: ML20214G774 (3)


Text

.

9g j

UNITED STATES

'. NUCLEAR REGULATORY COMMISSION j WASHINGTON, D. C. 20555 JUN 8 1977 DOCKET NOS. 50-322, 50-352 & 50-353, 50-358, 50-367, 50-373 & 50-374, 50-387 % 50-38QU 397) 50-410 APPLICANTS: LONG ISLAND LIGHTING COMPANY, PHILADELPHIA ELECTRIC COMPANY, CINCINNATI GAS AND ELECTRIC COMPANY, NORTHERN INDIANA PUBLIC SERVICE COMPANY, COMMONWEALTH EDISON COMPANY, PENNSYLVANIA POWER AND LIGHT COMPANY, WASHINGTON PUBLIC POWER SUPPLY SYSTEM AND NIAGARA M0 HAWK POWER CORPORATION FACILITIES: SH0REHAM NUCLEAR POWER STATION UNIT N0. 1, LIMERICK GENERATING STATION UNITS NO. 1 AND 2, WILLIAM H. ZIMMER NUCLEAR POWER STATION UNIT 1, BAILLY GENERATING STATION NUCLEAR NO. 1. LASALLE COUNTY STATION UNITS N0. 1 AND 2, SUSQUEHANNA STEAM ELECTRIC STATION UNITS NO. 1 AND 2, WPPSS NUCLEAR PROJECT NO. 2, NINE MILE POINT NUCLEAR STATION UNIT N0. 2

SUBJECT:

SUMMARY

OF MEETING HELD ON MAY 26, 1977 TO DISCUSS MARK II CONTAINMENT POOL DYNAMIC LOADS A meeting was held on May 26,1977 between representatives of the Mark II Owners, the General Electric Company and the NRC staff. The purpose of the meeting was to discuss draft questions prepared by the staff on Mark II topical reports recently submitted to the NRC. These reports include:

the 4-T test (phase 2 and 3), Analytical model Mark II pool swell phenomenon and the January 1977 applications memorandum. The attendees list is attached.

The major items discussed are as follows:

1. The draft questions were clarified and selected questions were deleted.
2. The Mark II owners were requested to revise the DFFR for the short term program to remove inconsistencies in the short term program load definition between the DFFR and the two Mark II
applications memorandum, i 3. We expressed concern that several of the current DFFR l

loads do not contain adequate margin for the short term program.

l These loads include: downcomer lateral loads, pool l boundary chugging loads and pool breakthrough elevation, We indicated that there was a need for additional discussions in the near future to resolve these concerns.

Af f

  • B605220489 770608 PDR ADOCK 05000322 A PDR

JIM 8 1977

4. We requested General Electric to investigate coupling between the wetwell pool dynamic model and the drywell pressurization analytical model.

At the conclusion of the meeting, plans were discussed for a followup meeting _on June 14, 1977 to discuss the current data base and load structure interactions related to the downcomer lateral loads, the agenda for the proposed July Mark II owners group meeting, and the remaining undiscussed draft questions.

bM Sydney Miner) Project Manager Light Water Reactors Branch No. 3 Division of Project Management Enclosure Attendance List l ~

l

m

, ENCLOSURE ATTENDANCE LIST MEETING MAY 26, 1977 MARK II OWNERS MEETING NRC BNL

  • S. Miner C. Economus C. Anderson
  • J. Kudrick
  • P. T. Kuo S&L, MARK II TSC CHAIRMAN
  • F. Schauer R. M. Crawford GE PP&L, VICE CHAIRMAN MARK II OWNERS W. A. Graftan L. H. Frauenholz E. M. Mead R. J. Ernst i

a