Trip Rept of 811005 Visit to Denver,Co & Richland,Wa to Discuss Site Drainage Plans,Meeting W/Westec Consultants on Possible Orographic Effects & Duration of Rainfall & Meeting W/Pnl to Discuss Safety & Environ Review Procedures
ML20213D936
Person / Time
Site: Columbia, River Bend, 05000000
Issue date: 12/07/1981
From: Staley G
Office of Nuclear Reactor Regulation
To: Lear G
Office of Nuclear Reactor Regulation
References
CON-WNP-0440, CON-WNP-440 NUDOCS 8112170153
Download: ML20213D936 (2)


Text

.

s m

~.

h>

( ?. ' ' ' & v \\.

,v

'.,"., +r m (S. -

1 s d\\

t DEC 7 MI

'. DECJ 1931

.[29ES7" ;7{

Docket Ios. 50-397/458 N'

l ItDt0RN DU'l FOR: George Lear, Chief Ilydrologic and Geotech.nical Engineering BrancN,.Qp /DC Tl!RU:

ityron Fliegel, Leader Hydrologic Engineering Section Hydrologic and Geotechnical Engineerijg Cranch, DE FRO.'t:

Gary Staley, Hydrologic Engineering Section i

Hydrologic and Geotechnical Engineering Branch, DE j

SUBJECT:

TRIP REPORT - DENVER A' D RICULN:D, NASHIllGT0!i i

fly trip durinq the week of October 5,1931 included:

(1) a stop in Denver to meet with Loren Crow and Archie Kahan, the !!ESTEC censultants that did the Pf!P for the Yankee Roue Plant, (2) a site visit to the '::P-2 f:uclear Plant near Richland, Washington and (3) a meeting with our consultants at Pacific !!arthwest Laboratories (Pill) to discuss our safety and environnental review procedures in general and the River Dend review specifically.

During ny necting with Loren Crow and Archie l'ahan, I went over general cortments on the draft report, but spent nost of the time discussing the possible orographic effects and duration of rainfall. They provided detailed discussion and bases to support their judgements in these areas.

I told then I would submit written coments and suggested revisions.

On Tuesday I not Jim Chaffe and Ravin Bra G. Joshi of 1.'PPSS and David Schreiber, their consultant, at their offices north of Richland, !!ashington.

After a brief meeting, we went to the lli!P-2 site uhere we net with the Architectural Engineer representative, Al Scriperio, and went over site drainage plans which were in the final stages of preparation. We then walked the main plant area to look at the site drainage features, the spray ponds i

and pump house and to the top of the Reactor Building to look at roof drainage and an overall view of the site. !!e then drove through the Ui:P-1/4 site to the Columbia River to look at the river intake structure. He also stopped at the llHP-1/4 spray ponds to look at the revisions that were made between the er and OL licensing stage.

He returned to the UPPSS offices and discussed ny draft questions. Dennis flyers and Karen Pickett joined us to discuss the features of the spray ponds.

I learned that during the initial filling and testing of the ponds, they experienced excessive seepage from the ponds. They apparently will replace all the seals in the basins and re-test then for eeepage rates.

7

~N

~

CFF

.....4..............

$hyg3 sunware NRC FORM 318 00-80) NRCM Cao OFFICIAL RECORD COPY usw. im

a..-

y

]

~

geS\\

George Lear q 96 On !!ednesday and Thursday I went to the Pt!L offices north of Richland and not with Rick Skaggs, !! ally !! alters, Dave itayers, Dick Ecker, Jim Doesberg and Fonda Thompson. During this meeting I reviewed the SRP's and Regulatory Guides with emphasis on review procedures and highlighting typical problems encountered during previous reviews in each of our review area s.

I then spent some tino with !! ally t! alters, the River Bend lead reviewer, discussing notes that I had made during a cursory review of the FSAR.

0- ! ginal Sic.,:d by#

Gary 3.Stalcy l

Gary Staley flydrologic Engineering Section Hydrologic and Geotechnical Engineering Cranch Division of Engineering cc:

D. Russell D. Persinko R. Auluck R. Perch G. Staley it. Fliegel J. Scherrer, !!ESTEC l

P,. Skaggs, Pi?L J. Knight i

1 l

1 1

4 s

s

'flts Y

HGEB:DE HGEb! del omc.,

sua ~,.u e >....G.S.t. ale.ylmc...MO..i.ege.l..

...).2.LI../.6.1.....l.U. 7L81..

om>

, sac ronu sis tio-son nacu o242 OFFICIAL RECORD COPY usse:nm-mea