Summary of 750821 Meeting W/Mark II Owners,Sargent & Lundy, Bechtel,S&W & B&R in Bethesda,Md Re Load Factors & Load Combinations for Assessing Capability of Mark II Containments to Accommodate Safety/Relief Valve LoadsML20214G603 |
Person / Time |
---|
Site: |
Nine Mile Point, Susquehanna, Columbia, Limerick, LaSalle, 05000000, Zimmer, Shoreham, Bailly |
---|
Issue date: |
08/26/1975 |
---|
From: |
Cutchin J Office of Nuclear Reactor Regulation |
---|
To: |
Office of Nuclear Reactor Regulation |
---|
References |
---|
CON-WNP-0027, CON-WNP-27 NUDOCS 8605220313 |
Download: ML20214G603 (8) |
|
|
---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20217D1001999-09-24024 September 1999 Summary of 990901 Meeting with Nmpc,Nyseg & Amergen Energy Co in Rockville,Maryland Re NMPC Plans & Pending Submittal Re Transfer of NMPC Interest & Authorities Under Operating Licenses for Nine Mile Point ML20207K3831998-12-31031 December 1998 Summary of 981218 PRB Meeting Re 2.206 Petition Request from P Gunter to W Travers,Nrc Requesting That NRC Convene Public Hearing to Consider Revocation of Nine Mile Point,Unit 1 Operating License ML20198J1651998-12-15015 December 1998 Summary of 981118 Meeting with Util in Rockville,Md Re Ampacity Validation Analyses.List of Attendees & Handouts Provided by Util Encl ML20203H2091998-02-24024 February 1998 Summary of 980211 Telcon W/Niagara Mohawk Power Corp on Licensee Progress in Responding to NRC Request for Addl Info Requested During 970822 Telcon Re Licensee Application for License Amend to Change Rc Chemistry Requirements in TSs ML20216G5171997-09-0404 September 1997 Summary of 970805 Meeting W/Util Re Thermo-Lag Corrective Actions at Peach Bottom & Limerick.List of Attendees & Meeting Handouts Encl ML20141H9231997-05-20020 May 1997 Summary of 970516 Telcon W/Niagara Mohawk Power Corp Re Licensee Plans for non-code Repair to Reactor Water Cleanup Sys Piping at Nine Mile Point Nuclear Station 1. List of Participants & Info Submitted by Licensee Encl ML20140F3561997-04-30030 April 1997 Summary of 970414 Meeting W/Util in Rockville,Md to Discuss Issues Associated W/Use of Thermo-Lag Fire Barrier Matl at Plants.Meeting Attendees & Handouts Encl ML20137Z4011997-04-18018 April 1997 Summary of 970410-11 Telcon W/Util Re Licensee on Core Shroud Welds & Tie Rod Assemblies for Plant ML20147J1271997-04-0707 April 1997 Summary of Telcon on 970403 W/Nmpc to Discuss Licensees Observations from Insp of Weld 32-WD-050 Between Recirculation Sys Suction Piping & Isolation Valve 32-376 at Plant ML20134M3841997-02-13013 February 1997 Summary of 970128 Meeting W/Util to Discuss Program to Dispose of Weapons Grade Pu Through Use as Mixed Oxide Fuel. List of Attendees & Matl Used in Presentation Encl ML20133G1401997-01-10010 January 1997 Summary of 961025 Meeting W/Peco in Delta,Pa Re Status of Licensing Actions Associated W/Plants.List of Attendees & Copy of Presentation Matl Encl ML20059J0261994-01-24024 January 1994 Summary of 931214 Meeting W/Representatives of PECO to Discuss Risk of Performing 24 H Emergency DG Testing at Power.List of Attendees Encl ML20059J8071994-01-19019 January 1994 Summary of Operating Reactors Events Meeting 94-02 on 940112 ML20217D4611993-12-0808 December 1993 Summary of 931206 Meeting W/Commonwealth Edison Co Re Items of Mutual Interest Re Operations at Utilities Nuclear Power Plants,W/Special Attention Devoted to Activities at Quad Cities Nuclear Station,Units 1 & 2 ML20058F0451993-11-24024 November 1993 Summary of 931103 Meeting W/Util in Rockville,Md Re Submittal Plans for Cost Beneficial Licensing Actions & to Get Feedback from NRC Staff.List of Attendees Encl ML20059H9941993-11-0808 November 1993 Summary of 931019 Meeting W/Util Re Discussions on Status of Current MOV Testing Program & NRC GL 89-10.List of Attendees & Meeting Agenda Encl ML20058M5891993-09-27027 September 1993 Summary of Operating Reactors Events Meeting 93-36 on 930922 ML20058M1861993-09-22022 September 1993 Summary of Operating Reactors Events Meeting 93-35 on 930915 ML20057B4771993-09-15015 September 1993 Summary of 930824 Meeting W/Util Re Implementation of dual-site Senior Reactor Limited to Fuel Handling (Lsr) Program.List of Meeting Attendees & Meeting Handouts Encl ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20059C9731993-09-0808 September 1993 Summary of 400th ACRS Meeting on 930805-06 in Bethesda,Md Re Proposed Resolution of GSI 57, Effects of Fire Protection Sys Actuation on Safety-Related Equipment & Lessons Learned from LaSalle Fire & Report on ABWR Fire Safety Issues ML20057A5691993-09-0202 September 1993 Summary of 930809 Meeting W/Util in Wayne,Pa Re Various Licensing Activities Re Plants.List of Attendees Encl ML20056D7471993-07-27027 July 1993 Summary of 930617 Meeting W/Util to Discuss Steps Being Taken by Licensee to Resolve Reactor Vessel Water Level Instrumentation Degassing Issue.List of Attendees Encl ML20128H6211993-02-0808 February 1993 Summary of 921123-24 Meeting in King of Prussia,Pa Re Positions on Operator Licensing Issues & to Solicit Input ML20059C7311993-01-30030 January 1993 Summary of 391st ACRS Meeting on 921105-07 in Bethesda,Md Re NRC Regulatory Analysis Guidelines & Reactor Operating Events & Occurrences,Shearon Harris Plant Loss of High Head SI & LaSalle Overfill Due to Failure of MFW Pumps to Trip ML20128C9371993-01-14014 January 1993 Summary of 921110 Meeting W/Util in Rockville,Md Re Two Issues Affecting Activities Performed During Refueling Outages ML20125E5551992-12-14014 December 1992 Summary of 921123 Meeting W/Utils in Rockville,Md Re Temporary Radwaste Sys.Licensee Anticipates Making Formal Submittal to NRC of Proposed Temporary Spent Fuel Pool Cleanup Sys by 921215 ML20126F1241992-12-10010 December 1992 Summary of 921201 Meeting W/Util in Rockville,Md Re Various Licensing Activities.List of Attendees Encl ML20125D0991992-12-0101 December 1992 Summary of 921022-23 Meeting W/Lipa Re Status of Plant Decommissioning Project ML20127A4961990-06-0707 June 1990 Summary of 900529 Meeting W/Nrr Allegation Review Board Re Allegation NRR-89-A-0023, Molded Case Circuit Breakers Adjustment Procedures ML20247R0161989-09-21021 September 1989 Summary of Operating Reactors Events Meeting 89-34 on 890920 to Brief Senior Managers & Regional Offices on Selected Events That Occured Since Last Meeting ML20247E3641989-09-0606 September 1989 Summary of 890717 Meeting W/Numarc,B&W Owners Group & Representatives of Lead Plants Re Status of STS Amends & Outstanding Issues Associated W/Lead Plant STS Submittals ML20247D5291989-09-0505 September 1989 Summary of Operating Reactors Events Meeting 89-31 on 890830.Significant Event for Input Into NRC Performance Indicator Program Identified ML20247K2471989-08-24024 August 1989 Trip Rept of Staff 890718-19,21 & 0801-02 Visits to Nuclear Power Plants to Gather Info Re Industry Actions to Address Loss of Oil Malfunctions of Rosemount Models 1153 & 1154 Transmitters ML20246K2171989-08-24024 August 1989 Summary of Operating Reactors Events Meeting 89-30 on 890823 Re Reactor Trip W/Multiple Instrumentation & Equipment Failures at DC Cook Unit 2 on 890814 & Auxiliary Feedwater Flows at Hb Robinson ML20246E1531989-08-16016 August 1989 Summary of 890727 Meeting W/Util,Nus Corp,Conner & Wetterhahn,Bechtel,Bnl & State of PA in Rockville,Md Re Severe Accident Issues.Licensee Presented Info Re Comparison of Core Damage for Accident Classes in PRA ML20248B5171989-08-0303 August 1989 Summary of 890725 Interface Meeting W/Util in Birrmingham,Al Re Sonopco/Util Corporate Organization Including Generic Activities & Initiatives Re Plants.Agenda & Viewgraphs Encl ML20245G5421989-08-0303 August 1989 Summary of Operating Reactors Events Meeting 89-28 on 890802.List of Attendees,Events Discussed & Significant Elements of Events & Summaries of Reactor Scrams for Wks Ending 890723 & 30 Encl ML20246P7771989-07-13013 July 1989 Summary of Operating Reactors Events Meeting 89-26 on 890712.Events Discussed & Significant Elements of Events Presented in Encl 2.List of Attendees Also Encl ML20246F8691989-06-22022 June 1989 Summary of Operating Reactors Events Meeting 89-24 on 890621.On 890615,potential Unmonitored Primary Coolant Release Path to Environ Discovered at WPPSS-2.On 890617,loss of Offsite Power Occurred at Brunswick,Unit 2 ML20245G6411989-06-15015 June 1989 Summary of Operating Reactors Events Meeting 89-23 on 890614.On 890607,multiple Electrical Distribution Sys Problems Occurred at Oconee,Units 1,2 & 3.On 890610,unit Power Signal Caused Scram ML20245F2221989-06-0808 June 1989 Summary of Operating Reactors Events Meeting 89-21 on 890531.List of Attendees & Related Info Encl ML20245A3851989-05-30030 May 1989 Summary of Operating Reactors Events Meeting 89-20 on 890524.List of Meeting Attendees & Viewgraphs Encl ML20247M7961989-05-24024 May 1989 Summary of 890502 Meeting W/Util,Sargent & Lundy & Rl Cloud Assoc in Rockville,Md Re Nonlinear Piping Analyses Used to Justify Removal of Snubbers & Pipe Supports.List of Attendees & Presentation by Licensee & Contractors Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247J7051989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl. Record Copy ML20247J6991989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20247D3441989-05-16016 May 1989 Summary of Operating Reactors Events Meeting 89-19 on 890510.List of Attendees,Events Discussed & Significant Elements of Events & Rept of long-term Followup Assignments & Summary of Scrams for Wk Ending 890507 Encl ML20247R6001989-05-15015 May 1989 Summary of ACRS Subcommittee on Limerick Unit 2 Meeting on 890425 in Philadelphia,Pa Re Application for Ol.Statement of Limerick Ecology Action Encl 1999-09-24
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20217D1001999-09-24024 September 1999 Summary of 990901 Meeting with Nmpc,Nyseg & Amergen Energy Co in Rockville,Maryland Re NMPC Plans & Pending Submittal Re Transfer of NMPC Interest & Authorities Under Operating Licenses for Nine Mile Point ML20207K3831998-12-31031 December 1998 Summary of 981218 PRB Meeting Re 2.206 Petition Request from P Gunter to W Travers,Nrc Requesting That NRC Convene Public Hearing to Consider Revocation of Nine Mile Point,Unit 1 Operating License ML20198J1651998-12-15015 December 1998 Summary of 981118 Meeting with Util in Rockville,Md Re Ampacity Validation Analyses.List of Attendees & Handouts Provided by Util Encl ML20203H2091998-02-24024 February 1998 Summary of 980211 Telcon W/Niagara Mohawk Power Corp on Licensee Progress in Responding to NRC Request for Addl Info Requested During 970822 Telcon Re Licensee Application for License Amend to Change Rc Chemistry Requirements in TSs ML20216G5171997-09-0404 September 1997 Summary of 970805 Meeting W/Util Re Thermo-Lag Corrective Actions at Peach Bottom & Limerick.List of Attendees & Meeting Handouts Encl ML20141H9231997-05-20020 May 1997 Summary of 970516 Telcon W/Niagara Mohawk Power Corp Re Licensee Plans for non-code Repair to Reactor Water Cleanup Sys Piping at Nine Mile Point Nuclear Station 1. List of Participants & Info Submitted by Licensee Encl ML20140F3561997-04-30030 April 1997 Summary of 970414 Meeting W/Util in Rockville,Md to Discuss Issues Associated W/Use of Thermo-Lag Fire Barrier Matl at Plants.Meeting Attendees & Handouts Encl ML20137Z4011997-04-18018 April 1997 Summary of 970410-11 Telcon W/Util Re Licensee on Core Shroud Welds & Tie Rod Assemblies for Plant ML20147J1271997-04-0707 April 1997 Summary of Telcon on 970403 W/Nmpc to Discuss Licensees Observations from Insp of Weld 32-WD-050 Between Recirculation Sys Suction Piping & Isolation Valve 32-376 at Plant ML20134M3841997-02-13013 February 1997 Summary of 970128 Meeting W/Util to Discuss Program to Dispose of Weapons Grade Pu Through Use as Mixed Oxide Fuel. List of Attendees & Matl Used in Presentation Encl ML20133G1401997-01-10010 January 1997 Summary of 961025 Meeting W/Peco in Delta,Pa Re Status of Licensing Actions Associated W/Plants.List of Attendees & Copy of Presentation Matl Encl ML20059J0261994-01-24024 January 1994 Summary of 931214 Meeting W/Representatives of PECO to Discuss Risk of Performing 24 H Emergency DG Testing at Power.List of Attendees Encl ML20059J8071994-01-19019 January 1994 Summary of Operating Reactors Events Meeting 94-02 on 940112 ML20217D4611993-12-0808 December 1993 Summary of 931206 Meeting W/Commonwealth Edison Co Re Items of Mutual Interest Re Operations at Utilities Nuclear Power Plants,W/Special Attention Devoted to Activities at Quad Cities Nuclear Station,Units 1 & 2 ML20058F0451993-11-24024 November 1993 Summary of 931103 Meeting W/Util in Rockville,Md Re Submittal Plans for Cost Beneficial Licensing Actions & to Get Feedback from NRC Staff.List of Attendees Encl ML20059H9941993-11-0808 November 1993 Summary of 931019 Meeting W/Util Re Discussions on Status of Current MOV Testing Program & NRC GL 89-10.List of Attendees & Meeting Agenda Encl ML20058M5891993-09-27027 September 1993 Summary of Operating Reactors Events Meeting 93-36 on 930922 ML20058M1861993-09-22022 September 1993 Summary of Operating Reactors Events Meeting 93-35 on 930915 ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20057B4771993-09-15015 September 1993 Summary of 930824 Meeting W/Util Re Implementation of dual-site Senior Reactor Limited to Fuel Handling (Lsr) Program.List of Meeting Attendees & Meeting Handouts Encl ML20059C9731993-09-0808 September 1993 Summary of 400th ACRS Meeting on 930805-06 in Bethesda,Md Re Proposed Resolution of GSI 57, Effects of Fire Protection Sys Actuation on Safety-Related Equipment & Lessons Learned from LaSalle Fire & Report on ABWR Fire Safety Issues ML20057A5691993-09-0202 September 1993 Summary of 930809 Meeting W/Util in Wayne,Pa Re Various Licensing Activities Re Plants.List of Attendees Encl ML20056D7471993-07-27027 July 1993 Summary of 930617 Meeting W/Util to Discuss Steps Being Taken by Licensee to Resolve Reactor Vessel Water Level Instrumentation Degassing Issue.List of Attendees Encl ML20128H6211993-02-0808 February 1993 Summary of 921123-24 Meeting in King of Prussia,Pa Re Positions on Operator Licensing Issues & to Solicit Input ML20059C7311993-01-30030 January 1993 Summary of 391st ACRS Meeting on 921105-07 in Bethesda,Md Re NRC Regulatory Analysis Guidelines & Reactor Operating Events & Occurrences,Shearon Harris Plant Loss of High Head SI & LaSalle Overfill Due to Failure of MFW Pumps to Trip ML20128C9371993-01-14014 January 1993 Summary of 921110 Meeting W/Util in Rockville,Md Re Two Issues Affecting Activities Performed During Refueling Outages ML20125E5551992-12-14014 December 1992 Summary of 921123 Meeting W/Utils in Rockville,Md Re Temporary Radwaste Sys.Licensee Anticipates Making Formal Submittal to NRC of Proposed Temporary Spent Fuel Pool Cleanup Sys by 921215 ML20126F1241992-12-10010 December 1992 Summary of 921201 Meeting W/Util in Rockville,Md Re Various Licensing Activities.List of Attendees Encl ML20125D0991992-12-0101 December 1992 Summary of 921022-23 Meeting W/Lipa Re Status of Plant Decommissioning Project ML20127A4961990-06-0707 June 1990 Summary of 900529 Meeting W/Nrr Allegation Review Board Re Allegation NRR-89-A-0023, Molded Case Circuit Breakers Adjustment Procedures ML20247R0161989-09-21021 September 1989 Summary of Operating Reactors Events Meeting 89-34 on 890920 to Brief Senior Managers & Regional Offices on Selected Events That Occured Since Last Meeting ML20247E3641989-09-0606 September 1989 Summary of 890717 Meeting W/Numarc,B&W Owners Group & Representatives of Lead Plants Re Status of STS Amends & Outstanding Issues Associated W/Lead Plant STS Submittals ML20247D5291989-09-0505 September 1989 Summary of Operating Reactors Events Meeting 89-31 on 890830.Significant Event for Input Into NRC Performance Indicator Program Identified ML20246K2171989-08-24024 August 1989 Summary of Operating Reactors Events Meeting 89-30 on 890823 Re Reactor Trip W/Multiple Instrumentation & Equipment Failures at DC Cook Unit 2 on 890814 & Auxiliary Feedwater Flows at Hb Robinson ML20246E1531989-08-16016 August 1989 Summary of 890727 Meeting W/Util,Nus Corp,Conner & Wetterhahn,Bechtel,Bnl & State of PA in Rockville,Md Re Severe Accident Issues.Licensee Presented Info Re Comparison of Core Damage for Accident Classes in PRA ML20248B5171989-08-0303 August 1989 Summary of 890725 Interface Meeting W/Util in Birrmingham,Al Re Sonopco/Util Corporate Organization Including Generic Activities & Initiatives Re Plants.Agenda & Viewgraphs Encl ML20245G5421989-08-0303 August 1989 Summary of Operating Reactors Events Meeting 89-28 on 890802.List of Attendees,Events Discussed & Significant Elements of Events & Summaries of Reactor Scrams for Wks Ending 890723 & 30 Encl ML20246P7771989-07-13013 July 1989 Summary of Operating Reactors Events Meeting 89-26 on 890712.Events Discussed & Significant Elements of Events Presented in Encl 2.List of Attendees Also Encl ML20246F8691989-06-22022 June 1989 Summary of Operating Reactors Events Meeting 89-24 on 890621.On 890615,potential Unmonitored Primary Coolant Release Path to Environ Discovered at WPPSS-2.On 890617,loss of Offsite Power Occurred at Brunswick,Unit 2 ML20245G6411989-06-15015 June 1989 Summary of Operating Reactors Events Meeting 89-23 on 890614.On 890607,multiple Electrical Distribution Sys Problems Occurred at Oconee,Units 1,2 & 3.On 890610,unit Power Signal Caused Scram ML20245F2221989-06-0808 June 1989 Summary of Operating Reactors Events Meeting 89-21 on 890531.List of Attendees & Related Info Encl ML20245A3851989-05-30030 May 1989 Summary of Operating Reactors Events Meeting 89-20 on 890524.List of Meeting Attendees & Viewgraphs Encl ML20247M7961989-05-24024 May 1989 Summary of 890502 Meeting W/Util,Sargent & Lundy & Rl Cloud Assoc in Rockville,Md Re Nonlinear Piping Analyses Used to Justify Removal of Snubbers & Pipe Supports.List of Attendees & Presentation by Licensee & Contractors Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247J6991989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl ML20247J7051989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl. Record Copy ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20247D3441989-05-16016 May 1989 Summary of Operating Reactors Events Meeting 89-19 on 890510.List of Attendees,Events Discussed & Significant Elements of Events & Rept of long-term Followup Assignments & Summary of Scrams for Wk Ending 890507 Encl ML20247R6001989-05-15015 May 1989 Summary of ACRS Subcommittee on Limerick Unit 2 Meeting on 890425 in Philadelphia,Pa Re Application for Ol.Statement of Limerick Ecology Action Encl ML20246L7281989-05-0505 May 1989 Summary of 890503 Meeting W/Util in Rockville,Md Re Containment Vessel Structural Integrity Tech Specs for Plants.List of Attendees & Licensee Presentation Encl 1999-09-24
[Table view] |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
, , UNITED STATES NUCLEAR REGULATORY COMMIS$loi.
VVASMSNGTON. D. C. 20665 AUG 2 ' 1975 Docket Nos. 50-322, 50-352 & 50-50-358, 50-367, 50
[ 50-374, 50-387 6 50-38 50-f97 50-410 APPLICANI: Long Island Lighting Company, Philadelphia Electric Company, Cincinnati Gas & Electric Company, Northern Indiana Public Service Company, Commonwealth Edison Company, Pennsylvania Power & Light Company, Washington Public Power Supply System, Niagra Mohawk Power Corporation FACILITIES: Shoreham Nuclear Power Station, Unit 1; Limerick Generating Station, Units 1 & 2; Wm. H. Zimmer Nuclear Power Station, Unit 1; Bailly Generating Station, Nuclear 1; LaSalle County Station, Units 1 & 2; Susquehanna Steam Electric Station, Units 1 & 2; WPPSS Nuclear Project No. 2; Nine Mile Point Nuclear Station, Unit 2
SUMMARY
OF MEETING HELD ON AUGUST 21, 1975.WITH MARK II OWNERS AND ARCHITECT-ENGINEERS On August 21, 1975 representatives of certain of the above - named Mark II Owners, Sargent & Lundy, Bechtel, Stone & Webster, Burns & Roe, and the NRC staff met in Bethesda, Maryland. The primary purpose of the meeting was to discuss load factors and load combinations proposed by the Mark II Owners and their architect-engineers for assessing the capability of Mark II containment structures to accomunodate safety / relief valve (SRV) leads (LOCA loads are still being evaluated by G. E. and were not to be discussed.) An attendance list and copies of some of the tables and figures used in presentations made at the meeting are enclosed.
Messrs. Crawford and Bergstrom of Sargent & Lundy made presentations.
Some of the major points made were:
- 1. The SRV load is a major load which was not considered in the original design of Mark II containments.
- 2. The SRV load has been added to the load combinations, and load factors associated with other loads in the load combinations are being reassessed (and reduced where possible to allow inclusion of the SRV loads without design modifications.)
~
~
'#7s.wt6 8605220313 750826 PDR ADOCK 05000322 A PDR
__ ______ _ ______ __________________-___ _ _____-___________.-___0
-2 ) AUG 2 6 1975
- 3. Present plans are to combine the SRV loads with the small- and intermediate-break LOCA loads but not with the large-break LOCA loads. (GE is assessing the time sequences of the LOCA and SRV loads to see if the SRV and large-break IDCA loads should be combined.)
- 4. Current philosophy is to include conservatism in the load rather than in the load factor.
Representatives of the NRC staff asked a' number of questions, many of which cannot be answered until after the Preliminary Forcing Function Report is completed and design assessments are made of individual containment designs.
The Mark II owners were advised not to allow the schedule for submittal of required information to the NRC staff to begin to slip. They were also advised that reductions in the margins presently included in the design of the containments or in the conservatism presently included in the load factors and load combinations presented in their PSAR's could be viewed as modifications to the principal architectural and engineering criteria for design included in their PSAR's and necessitate amendment of their construction permits.
MQ J. M. Cutchin IV Light Water Reactors Branch 1-2 Division of Reactor Licensing
Enclosures:
As stated
, .m . ,
.,~ ~ . . . . - . .
,. . t ..
p%...g. .,. .
m~. ..
u m%.
+, 4, .
N8RMRt.IZED -'
'n -
- GURNT I TY I..c. - - .. .:'.:' SYMMETRIC 5A H3,. .
a t :
,, m... p.rc. q q m . .i .w y r.sy.. v..ur .. -
. =~-
r c W
.,,,.,4L:t%-v.~..--.
w
SCO.LE '. 'a
~
. . .q . ;. . - e.. ..
r.m. .. . . .
,. . .. ~.h.
~-
~ . .. ..
.. ,. S es
.= + - * ,se
.y.,
j
. y'
-% 4 e
., 2. . et N.
. +
7 .
e.
.9 ~g 7: m r *
.gsv
..n .+- g, . %. .y n.. .n, .. e ..h
... * . ... . . ..s... ,
. ~: .
l . 8 ,li < g.. ,,c.~
. .,. ) e,
^
, y,. ' p"
. A -
, s. ..,**<.-, y.g. - d. .". .; .--- . . . - *r l
' 88
, .. m. cu.t
.n i,g.y ..-
T.
.r cs 4E.n...e e 7.r ,o.*. re
,t .. *,
-.r- g D.g. . . s g.
I.6 +' >. . .., ',m;- r.,n-O. ee.c :n.e%. . s ;.A,,. - . : . ::.,f' m- .-
. e: -.. . .. r . - - _., .. , . . -
.: q r vp ;.. ;. .-.
.+
. . . i. - .,. m,, . -.. ..
... .e. . .
..[._. $
) 8. . [v,
,,,4
~ . M. . . -M M'. y .m. . c.n. a .. . .. im $N...it .i '.'~ '@. 5. -W s
- n. w e ..p.....
.~. r. .. . u,n..m, . .,:
. .... .z... i .
~ 9,.4 ,.
,. .y; - - . p. ,,. _. . . . . . .
- 2 . ~ . .. , , .
% Ve
.. r;4(e Ta-s *g. g ,,.Q -
g ,5 _
_. . ;p *;
~ -
' UK^, . *
. . , ~. . [.
e.
.n,,!** .. i w .a.q ,
. D . . .m. .A r
.e ~.. .
....o. :.n.,
a ., - ...,#, . f ,.e M 'M - ,7 -
-s . 3.. y
~ .
r.c. .
^
.m.1. ?m _?_,_
.s.e cA. . .
-.+ , . . . a..n..
s . .: L-.;+gqq.
.JD c.y ,
. .e v ..*... -
~ qa. r.,... .,g. ,.
. . . . . . 3..zy .
0*2 .w y c.. . . .;, 7..,
. . z1. ...~m . .
..w.e .v. . . .
~
.wm . a. .- s, 4, ,w,,7 . o '
m.t . .-
.v.~~._.<.......
- n. . .w .~ 4. .u . .... ...,...,m.
. . :: . ... . yA 7,' .
e .. .
'y %$.%$'-A..;AY . & 'W % i * * "-W#,.'s *'l ' Q '1.$
g*4 .
.. . W+%'>: . ' ^
"~.3 :#n..
%.* '; : =.~: .
~: ....
. !. .fK':L. .ict ' .,, . v
- 2.,- ? @
. n ;L.*; *' v.;....l.- . .. . .=. .
.w r. =r . - . :ag a .. 4 e&.:R,y r9,w s v.n..r . ..
x:m . u.
m .-
.. t -- ..w. ..
.. t .
0.6 = .m...m..s.g. g. ~
. . ,? . n.~;. ~-.g w ~. y.,e..w;,-i;.%.-
.n . . . . e . .
. q .:.
p, ,.s.3 g. 4.g .7. ,, j
.- . g...,a.; ... .
,,,-...-. .g k ... .
.r. ...T -
g* * -. .v f. ar . . - e.v . .
.. . h-[ Ql..
-. iM. _,f ,;.
' 3 ;. -
M. .w.. y , . .W "r , o.-A~W
, ',Df .
- d. M5$.
1.'.?%i?.4NE... .,.~
. .,.@. . ?.% -
f n, - .; {,,- - . -
4 l 3 ,, . . . * . . - . .
s SU . , ,
g .* . . . ,* ,
l
.i .
~
E.b 'gb pf
}k *
. c; 7
v'
&. .*,a..,--... '. _ h.
. .g
=
e- */ .j'* *
.,f f ' ;. r . . . ~ - .. . . = . ' ..-
- 6. . / ,M-s , ,
.....,...e, .
, # .... W.. ~p . . . .. .. s
.; .'. p * .~ i * % . . . . '
- ,, a. . .?. - , . .' . ,
,. n ' , ... : //
. 3.. ...;.
g- .s e
. o
. . . . . . ~ c , ,. . . : , .
- *
. . <*s.:x.,_,_ ' . , . . -_. *
- e. . .
xm. . .. :._.1.
- - . . . . . . .- .. .. .. l . ..
., i.~ .
. a .
'. ~.- r:3. SEQUENCED SYMt1ETRIC t
7/24/75 . .
3 .
N8RNRLIZE0 , ... .
QUANTITY -
' ~
~ . .
- J '. .' m'
. f. .c.'. '. -
. . . . =w .
x.
10*- '- ' *
- i ~ .
ca ~ *
~' ,, *
. c. .
1
~ ~
5.8 '
a' ~
- 5. . . ..2 $. . . .5 ..AO.. 5.. P.. W' = * ~5.'
c . a ~..Y.
. ~. . .
n 36 <
}.4 '
l
.~.
, ) \ ./
. LI l 12 .' "
I 1
'W 80 .
l i TIl
)
%j i 0
1 1 u J o'. 2 ..
. u; u
' J -
~
04 .- . .
- '? -
Q ,., ,.
n.g h_.. .
1 aldat
.. a.
" <. .. y? %.<. c ' _
10*" , ..
i . .
.^
= . ..
\
1
. -t
..e., ..
l .
.. ; y _
,Y
- 2. . . , ,
, .y- -
.,a r h..* . . _ _ . , - - - - - .
._ _ ._ n . . m - a. - - - -
f
(.
I, j,
say r.ono PREi.Iy l -
/* -
. i Pressure DistrJbetion * '
source: - . :. ~ . .
. Date : A:... ;., .37. ~
.- l A-G '
DesCTE . LOAD M. AGNITucEES a
t e
=
- v. -
. s
- . .e
- . . . g
. . .- ... e
- .. a ; w..A. ..
,..;4. c n.
$,- ,i m., . . . i ,-- w. ,
~. c. , .
p ,. .*
.** .. ::,.s :
='
W" g',
.. = . .. .: . . , . .
D. . "t:- f3 *_ ~ ?: -
~
.m
- A . r. , . .
- n. .
.: .c m -
V
.. i,
. . . s
. s.- .
u
, s .
t . . -
1 a .
g ?
/. .
s r n p -
. e.
g - -
. 's -0
. 1- -
, f d' ce
- E .
-- .sk ."Q 3 e O coc.: .
G' o .:.!
. r~
n - -
4 c.t.
d i I i i
s .,
i
( ( j
. p
. I , ..
I k k $ pesim a g
4 -10 . .
)_to- t),a - e .
. g f
I f .
g.4 R .-
i LOAD 00MB1 hT10 $
LDAD EQN. OWD . D L F P. To Ro E. Eos F3 TA Rg SRV 1 Normal 1.4 1.7 1.0 1.0 - - - -- - - - 1.5 w/efremp 2 Normal 1.0 1.3 1.0 1.0 1.0 1.0 - :- -- - -
1.3 w/ reg 3 i Normal 1.0 1.0 1.0 1.0 1.0 1.0 IJS' 1.25 Sev.Env. ',
4 Abnormal 1.0 1.0 1.0 - - --
.M,, 5'. 10 1.0 1.25 5 Abnormal 1.0 1.0 1.0 - - .
1.1 ' ~
4- .J.k' '
1.0 1.0 1.1 Sev.Env. '-
1.0 1.0 1.0 1.0 1.0 l'.0
~
6 Normal 1.0 -
.-- -- - 1.0 Exte .Env.
1.0 1.0 1.0 1.0 1.0 7 Abnormal 1.0 - - - - 1.0 1.0 EIt.Env.
i IARD DEMIFTIM .
D = Dead Imads _SW = Srv.~ 1med L = Live Imada ' ,3 0 = Opetsting Basis , Earthquake F - Prestressing toads BB = Safe Shutdown Earthquake To = Operating Tegerature Loads P3 = Fipe Break Pressure Ioad &w Ro = Operating " Pipe Beactdane ;, g ,. :p ; 4h druks s TA = Accident Temperature Load Pp = Operating Pressure Loads g - Ramation 14 4e %
% y
, y.
$,J '.
e e
me A s
Y~* , e, ~ ~,h '
- _* ) &Le,.R ,1ll?s'& *I ., . AZR}s -
AucusT 21, 1975 ,
CONTAINMENT LINER CRITERIA ACCEPTANCE CRITERIA FOR MECHANICAL LOADS IN ACCORDANCE WITH ASME BOILER PRESSURE VESSEL CODE SECTION III, DIVISION 1, SUBSECTION NE ACCEPTANCE CRITERIA FOR SELFLIMITING LOADS IN ACCORDANCE WITH ASME BOILER PRESSURE VESSEL CODE SECTIONIO, DIVISION 2,SUBSECTIONCC
\
- 1 (Meeting Summary)
Distribution R. S. Boyd Docket File 3 W. Gammill [J NRC PDR V. Benaroya Local PDR R. Vollmer .
NRR Reading J. Collins V. A. Moore G. Lainas f> J 7 R. C. DeYoung J. Knight D. Skovholt S. Pawlicki D. Muller L. Shao R. Denise T. Ippolito W. Butler R. Houston J. Stolz T. Novak R. Clark D. Ross T. Speis EP Project Manager D. Vassallo Attorney, OELD K. Kniel IE (3)
K. Goller M. Rushbrook A. Schwencer R. Fraley (16)
P. Collins 0. Parr R. Purple G. Lear D. Ziemann LWR l-2 File G. Knighton P. ReiFa C. Dicker I. Pelter B. Youngblood I. Villalva W. Regan R. Powell S. Varga W. Kane R. W. Klecker J. Snell R. Heineman J. M. Cutchin IV H. Denton Isa Sihweil R. Tedesco L. C. Shao R. Maccary S. Hon V. Stello F. P. Schauer B. Grimes C. P. Tan M. Spangler A. L. Gluckmann ,
R. Ballard R. J. Stuart Jacob Kastner D
3 ,,
3 L'
'