ML20066J479

From kanterella
Revision as of 08:09, 21 December 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Inservice Insp Final Rept First Refueling Outage (Period 1/Interval 1), Vol 1 & 2,for Review
ML20066J479
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 01/25/1991
From: Hairston W
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20066J482 List:
References
MSV-00364, MSV-364, NUDOCS 9102010137
Download: ML20066J479 (2)


Text

- . - . - - - -

awv rm cnvan,.

333 ho&%N Amrw

$$15EN?h w .. p a n

$IEt$9Y"*

Benyim Aden 3ROI TempWie P05 f4 %81 January 25, 1991 ,, , , _

W. Q. Hairston, lil Leno vec Presdem naae ,o m e nt MSV-00364

  1. 1233 l

Docket No. 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. -20555 Gentlemen:

V0GTLE ELECTRIC GENERATING PLANT INSERVICE INSPECTION

SUMMARY

REPORT Enclosed are Volumes 1 and 2 of the Vogtle Electric Generating Plant, Unit 2, (VEGP-2) Inservice Inspection (!$1) final Report which constitute the

  • 0wner's Report for Inservice Inspection (Form NIS-1)" required by subsubarticle IWA-6230 of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, 1983 Edition with

. Addenda through Sumer 1983. Inservice inspection activities which were conducted at VEGP-2 during the Fall 1990 maintenance /refuelingoutageare discussed therein. Also ' neluded therein are "0wner's Reports for Repairs or Replacements (Form NIS-2)" for repairs and/or replacements documented at VEGP-2 from immediately prior to t1e receipt of the operating license in February .1989 through the Fall 1990 maintenance / refueling outage. Volumes 3 through 7 of_the ISI Final Report contain- information not typically provided in the "0wner's Report for Inservice Inspection-(Form NIS-1)",

e.g., personnel certifications, nondestructive examination procedures, etc., and are not included herein. Volumes 3 through 7,-however, are available for review upon request at the plant site.

With regard to the NIS-2 reports on repairs and/or replacements, only the completed NIS-2 forms are being submitted.- Any attachments, e.g., code data reports, etc., that are referenced in - the completed NIS-2 forms will be made available for review upon request at the plant site.

Contained in the VEGP-2 " Owner's Report for Inservice Inspection (Form NIS-1)" is a. discussion on the inspection of steam generator tubes performed during- the Fall 1990 maintenance / refueling outage. That discussion constitutes the Special Report required by Vogtle Electric Generating Plant, Unit- 1 and Unit 2 Technical Specification 4.4.5.5.b to be submitted to the U. S. Nuclear Regulatory Commission (USNRC) within twelve months following completion of the steam generator tube inspection.

Accordingly, there will not be a nparate submittal made to the USNRC on the inspection of the-steam generator tubes performed during the subject outage. By copy of this letter, the appropriate USNRC Regional 9102010137 910125 PDR ADOCK 05000425 Ofy Q PDR '

/MjddM

" U. S. Nuclear Regulatory Commission )

MSV-00364 Page 2 Administrator is being provided a copy of the enclosed report volumes; thus, compliance with the requirements of Vogtle Electric Generating Plant, Unit I and Unit 2 Technical Specification 6.8.2 for submittal of Special Reports to the appropriate Regional Administrator is met.

Five copies of Volumes 1 and 2 of the ISI Final Report for the Fall 1990 maintenance / refueling outage are provided for your review. The Regional Administrator for USNRC Region II is being provided with two copies of the subject report volumes.

Should there be any questions in this regard, please contact this office.

Sincerely,

. SA W. G. Hairst , III WGH,III/JAE/gb

Enclosures:

Volumes 1 and 2 of VEGP-2 IS! Final Report, First Maintenance / Refueling Outage (Period 1/ Interval 1) xc: Georcia Power ComDanY Mr. C. K. McCoy (w/o encl.)

Mr. J. A. Bailey (w/o encl.)

Mr. R. M. Odom (w/o encl.)

Mr. P. D. Rushton (w/o encl.)

Mr. W. B. Shipman (w/o encl.)

Mr. L. A. Ward (w/o encl.)

NORMS (w/ encl.)

U. S. Nuclear Reculatory Commission Mr. S. D. Ebneter, Regional Administrator (w/ encl.)

Mr. D. S. Hood, Licensing Project Manager, NRR (w/ encl.)

Mr. B. R. Bonser, Senior Resident Inspector, Vogtle (w/ encl.)

1 s