ML20205J940

From kanterella
Revision as of 17:26, 12 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-483/99-01 on 990207-0330.One Violation Occurred & Being Treated as Noncited Violation,Consistent with App C of Enforcement Policy
ML20205J940
Person / Time
Site: Callaway Ameren icon.png
Issue date: 04/05/1999
From: Graves D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Randolph G
UNION ELECTRIC CO.
Shared Package
ML20205J943 List:
References
50-483-99-01, 50-483-99-1, NUDOCS 9904120270
Download: ML20205J940 (5)


See also: IR 05000483/1999001

Text

y

.-

UNITED STATES

a

+l4" "' Cuto,

, w . NUCLEAR REGULATORY COMMISSION

'$ E REGloN IV

$

9*

j 8 611 RV AN PLAZA DRIVE, SulTE 400

ARLINGTON, TEXAS 76011-8064

,,,g  ;

.

APR - 51999 1

!

Garry L. Randolph, Vice President and  !

Chief Nuclear Officer i

Union Electric Company

P.O. Box 620

Fulton, Missouri 65251

SUBJECT: NRC INSPECTION REPORT NO. 50-483/99-01

l

Dear Mr. Randolph:

This refers to the inspection conducted on February 7 through March 20,1999, at the Callaway

Plant. The enclosed report presents the results of this inspection.

Based on the results of this inspection, the NRC has determined that one violation of NRC '

.

requirements occurred. The violation is being treated as a noncited violation (NCV), consistent

with Appendix C of the Enforcement Policy. The NCV is described in the subject inspection

report. If you contest the violation or severity level of the NCV, you should provide a response

within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear

Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with l

'

copies to the Regional Administrator, Region IV, and the Director, Office of Enforcement,

United States Nuclear Regulatory Commission, Washington, DC 20555-0001.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure, and your response will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

dd

.

David N. Graves, Chief

Project Branch B

Division of Reactor Projects

Docket No.: 50-483

License No.: NPF-30

Enclosure:

NRC Inspection Report No.

50-483/99-01

r.,

9904120270 990405

PDR ADOCK 05000483

G PDR

)

c. l

.

.

Union Electric Company -2-

cc w/ enclosure:

Professional Nuclear Consulting, Inc.

19041 Raines Drive

Derwood, Maryland 20855

John O'Neill, Esq.

Shaw, Pittman, Potts & Trowbridge

2300 N. Street, N.W.

Washington, D.C. 20037

H. D. Bono, Supervising Engineer

Quality Assurance Regulatory Support

Union Electric Company

P.O. Box 620 .

Fulton, Missouri 65251

Manager - Eiectric Department

Missouri Public Service Commission

301 W. High

P.C. Box 360

Jefferson City, Missouri 65102

Ronald A. Kucera, Inter-Governmental Affairs Liaison

Department of Natural Resources

P.O. Box 176

Jefferson City, Missouri 65102

Otto L. Maynard, President and

Chief Executive Officer

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, Kansas 66839

Dan I. Bolef, President

Kay Drey, Representative

Board of Directors Coalition

for the Environment

6267 Delmar Boulevard

University City, Missouri 63130

Lee Fritz, Presiding Commissioner

Callaway County Court House

10 East Fifth Street

Fulton, Missouri 65151

._

p --

.

.

Union Electric Company . -3-

Alan C. Passwater, Manager

Licensing and Fuels

AmerenUE

One Ameren Plaza

1901 Chouteau Avenue

P.O. Box 66149

St. Louis, Missouri 63166-6149

J. V.' Laux, Manager

Quality Assurance

Union Electric Company

P.O. Box 620

Fulton, Missouri 65251

Jerry Uhlmann, Director

State Emergency Management Agency

P.O. Box 116

. Jefferson City, Missouri 65101

l

.

j

!

a=.

p

?

APR -5.199;

. Union Electric Company -4-.

E-Mail report to T. Frye (TJF)

l- E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

i. - bcc to DCD (IE01)

bec distrib. by RIV:

Regional Administrator Resident inspector

DRP Director DRS-PSB

)

DRS Director MIS System i

Branch Chief (DRP/B) RIV File i

Project Engineer (DRP/B)

Branch Chief (DRP/TSS)

.

I

p20049 i

I

l

DOCUMENT NAME: R:\_CW\CW901RP.DGP

To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Cooy with enclosures "N" = No copy

RIV:RE PE i SRI AC:DRP/B ._

JDHanna /h RVAzua 47 DGPassehle DNGraves PJ  ;

3/ 9 /99 ' 3/ O /99 /~

"

3/ ~t /99 2d /OS ?/c///

OFFICIAL RECORD COPY l

l

J

I,

Union Electric Company -4- O

E-Mail report to T. Frye (TJF)

l

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

- bec to DCD (IE01)

bec distrib. by RIV: 1

Regional Administrator - Resident inspector

DRP Director DRS-PSB

DRS Director MIS System

Branch Chief (DRP/B) RIV File

Project Engineer (DRP/B)

Branch Chief (DRP/TSS)

DOCUMENT NAME: R:\_CW\CW901RP.DGP

To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

RIV:RE PE , i SRI AC:DRP/B

JDHanna /6(2 RVAzua @V DGPassehlb DNGraves Yu

~l

l 3/7f /99 3/ 9 /99 ' 3/31/99 $ 2/ != ft/ff

OFFICIAL RECORD COPY

l