ML20197B797

From kanterella
Revision as of 19:53, 23 November 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Summary of 860903 Meeting W/Util Re Detailed Exam of Draft Emergency Plan.List of Attendees Encl
ML20197B797
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 10/24/1986
From: Kadambi N
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8610300411
Download: ML20197B797 (7)


Text

'

,ph'c oe ,'e d UNITED STATES

'go 8 NUCLEAR RECULATORY COMMISSION WASHINGTON, D. C. 20555 j 3 ,E

\.....,/ 0012 4 99f 1 I

)

Docket Nos.: 50-498 -

and 50-499 APPLICANT: Houston Lighting and Power Company FACILITY: South Texas Project, Units 1 and ?

SUBJECT:

SUMMARY

OF MEETING ON EMERGENCY PLAN ON SEPTEMBER 3, 1986 The meeting attendees are shown in Enclosure 1. The discussions involved a detailed examinaticn of the draft emergency plan.

Discussion:

The purpose of the meeting was to discuss Revision 2 of the South Texas Project emergency plan. The plan was reviewed against the criteria in NUREG-0654, FEMA-REP-1, Revision 1. A summary of the observations follows:

- Lists of local organizations in the Introduction section, Assignment of Responsibility section and in block diagrams were inconsistent.

Some Letters of Agreement were missing.

- The notification method and division of responsibility for the State of Texas was confusing.

- The block diagrams were sometines inconsistent with description of organizction in the text.

- The title of some individuals were incorrect, especially the Radiological Manager vs. Radiological Director.

Shift staffing did not match Table B-1 guidance. -

- The Emergency Action Level scheme was incomplete.

- The time of notification of the NRC was misleading.

- Some references to tables and figures were incorrect.

L 8610300411 861024 PDR ADOCK 05000498 F PDR

7 <

y' -

Description of assembly areas were not clear.

The discussion of the Media Information Center and its -

staff was not clear.

- Peteorlogical data transmission was not clear.

Training requirements for emergency organization members were confusing. Frequency was not always specified.

In addition to these main observations, several typographical and grammatical errors were noted. Further description of some areas were also requested.

The applicant provided new maps to be inserted into the emergency plan and indicated that all of the implementing procedures were being completely revised. The applicant agreed to submit a new draft of the emergency classification procedure by the end of September 1986 and a new revision of the emergency plan by October 15, 1986.

N. P. Kadambi, Project Manager PWR Project Directorate No. 5 Division of PWR Licensing-A cc: Rosemary T. Hogan, EPB/I&F Falk Kantor, EPR/I&E h

- -- . - - - - - _ _ _ _ , . - . .-- - , _ . ~ , - + - - - -

I t .

y Mr. J. H. Goldberg Houston I.ichting and Power Company South Texas Project CC" Brian Berwick, Esq. Resident Inspector /Sotsth Texas Assistant Attorney General Project Environmental Protection Division c/o U.S. Nuclear Regulatory Commission P. O. Box 12548 P. O. Box 910 Capitol Station Bay City, Texas 77414 J.ustin, Texas 78711 Mr. Jonathan Davis Mr. J. T. Westermeir Assistant City Attorney Manager, South Texas Project City of Austin Houston I.ighting and Power Company P. O. Box 1088 P. O. Box 1700 Austin, Texas 78767 Fouston, Texas 77001 Ms. Pat Coy Mr. H. L. Peterson Citizens Concerned About Nuclear Mr. G. Pokorny Power City of Austin 5106 Casa Oro P. O. Box 1088 San Antonio, Texas 78233 Austin, Texas 78767

~

Mr. Mark R. Wisenberg Mr. J. B. Poston Manager, Nuclear licensing Mr. A. Von Rosenberg Houston lighting and Power Company City Public Service Boad P. O. Box 1700 P. O. Box 1771 Fouston, Texas 77001 San Antonio, Texas 78296 Mr. Charles Falligan Jack R. Newman, Esq. Mr. Burton I.. Lex Newnan & Poltzinger, P.C. Bechtel Corporation 1615 1. Street, NW P. O. Box 2166 Washington, D.C. 20036 Houston, Texas 77001 Melbert Schwartz, Jr., Esq. Mr. E. R. Brooks Baker & Botts Mr. R. I., Range

- One Shell Plaza Central Power and light Company-Houston, Texas 77002 P. O. Box 2122 Corpus Christi, Texas 78403 Mrs. Peggy Buchorn Executive Director Citizens for Equitable Utilities, Inc.

Route 1, Box 1684 Brazoria, Texas 77422

f e v' Pouston lighting & Power Company South Texas Project l

CC:

Regional Administrator, Region IV -

U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Mr. I.anny Sinkin, Counsel for Intervenor Citizens Concerned about Nuclear Power, Inc.

Christic Institute 1324 North Capitol Street Washington, D.C. 20002 l.icensing Representative Houston lighting and Power Company Suite 1309 7910 Woodmont Avenue Bethesda, Maryland 20814 e

.I

r .

e' ENCLOSilRE 1 MEETING ON EMERGENCY PLANNING SEPTEMBER 3, 1986 -

N. P. Kadambi NRR/PD#5 M. A. McBurnett HL&P/ Nuclear Licensing Rosemary T. Hogan NRC EP Specialist Falk Kantor NP.C/IE/EPB R. R. Goodwin HL&P/ Emergency Plan Terry G. Roberson ,

HL8P Engineering e

i J

i

OCT s4 na;

-2 Description of assembly areas were not clear.

The discussion of the Media Information Center and its staff was not clear.

Meteorlogical data transmission was not clear.

Training requirements for emergency organization members were confusing. Frequency was not always specified.

In addition to these main observations, several typographical and grammatical errors were noted. Further description of some areas were also requested.

The applicant provided new maps to be inserted into the emergency plan and indicated that all of the implementing procedures were being completely revised. The applicant agreed to submit a new draft of the emergency classification procedure by the end of September 1986 and a new revision of the emergency plan by October 15, 1986.

N. P. Kadambi, Project Manager PWR Project Directorate No. 5 Division of PWR Licensing-A cc: Rosemary T. Hogan, EP8JI&E Falk Kantor, EPB/I&E I

i PD15 Dy[:P

! NPKadambi:ss UVSNo$p#5ha'n l

10/2.y86 10/2'//86 l

l

so-qfg r . . .

~

. Meetina Summary Distribution DocketT6ricentral" File NRC Participants NRC PDR Local PDR N. P. Kadambi  :

PD#5 Reading File Rosemary T. Hogan J. Partlow Falk Kantor V. Noonan N. P. Kadambi OGC-Bethesda l

E. iordan B. Grimes ACRS (10)

M. Rushbrook

. cc: Licensee and Plant Service List 2

, , - - - , ,-,,--,-,.,~-c , - , - - - - - . , - - , - - - , , - - - - , , - , - , - - - - - - - - - - - - - -