Notice of Violation from Insp on 850904-1007
ML20198F304
Person / Time
Site: Zion, 05000904  File:ZionSolutions icon.png
Issue date: 11/07/1985
From: Chrissotimos N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20198F302 List:
References
50-295-85-31, 50-304-85-32, NUDOCS 8511140319
Download: ML20198F304 (2)


Text

. .

.

O g Appendix NOTICE OF VIOLATION Commonwealth Edison Company Docket No. 50-295 Docket No. 50-304 As a result of the inspection conducted on September 4 through October 7, 1985 and in accordance with the General Policy and Procedures for NRC Enforcement Actions (10 CFR Part 2, Appendix C), the following violations were identified: CFR 50.72(b) states in part, "(2) . . . the licensee shall notify the NRC as soon as practical and in all cases, within four hours of the occurrence of any of the following:

(ii)' Any event or condition that results in manual or automatic actuation of any engineered safety feature (ESF). . . ." CFR 50.73(a) states in part, "(1) The holder of an operating license for a nuclear power plant (licensee) shall submit a Licensee Even Report (LER) for any event of the type described in this paragraph within 30 days after the discovery of the event . . . (2) The licensee shall report. . . .

(iv) Any event or condition that resulted in manual or automatic actuation of any Engineered Safety Feature (ESF). . . ."

Contrary to the above, 'The licensee failed to notify the NRC within four hours of the occurrence for the following two events: The ESF actuation on August 2, 1985 when all three Unit 1 PP air compressors auto started. A four hour ENS telephone notification was made on August 30, 198 The ESF actuation on September 9, 1985 when Unit 2 containment purge valves were inadvertently shut when the jumpers were removed from the purge valve circuitry. A four hour ENS telephone notification was made approximately seven hours after the event occurre . The licensee failed to submit an LER within 30 days for the following two events: The ESF actuation on May 27, 1985 when an improper sequence of operations resulted in an inadvertent closure of several Train A Containment Isolation Valves. A Deviation Report reclass-ification was submitted October 7, 1985, and an LER will follo PDR ADOCK 05000295 G PDR

. _ __ _ ____ - m-J

. .

'o . -

.

Appendix 2 The ESF actuation on August 2, 1985 when all three Unit 1 PP air compressors auto started. An LER was submitted on September 10, 198 This is a Severity Level IV violation (Supplement I).

The inspection showed that action had been taken to correct the identified violatio Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement or explanation in reply, including for each violation: (1) corrective action taken-and the results achieved; (2) corrective action to be taken to avoid further noncompliance; and (3) the date when full compliance will-be achieve Consideration may be given-to extending your response time for good cause show //-7-5S Dated CJWistotimos, Chief Pr ct's Branch 2

'