Notice of Violation from Insp on 921207-11.Violation Noted: on 921209 Operator Failed to Review,Sign & Comply W/ Appropriate Radiation Work Permit Prior to Entering High Radiation Areas in Which Radiography About to Commence
ML20126J231
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 12/29/1992
From: Pederson C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20126J206 List:
References
50-295-92-34, 50-304-92-34, NUDOCS 9301060089
Download: ML20126J231 (1)


Text

.t

!!0TICE OF VIOLATION-Commonwealth Edison Company. Docket Nos.4 50-295; 50-304 Zion' Nuclear' Generating Station Licenses No._DPR-39; DPR-48 During an NRC inspection conducted on December 7 through 11, 1992, a violation of NRC requirements was identified. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C, the violation is listed below:

Technical Specification 6.2.2 requires that radiation control procedures be prepared, implemented and maintained.

Zion Administrative Procedure, ZAP 610-02, High Radiation Area Access Contrnl, requires personnel to review, sign and comply with the appropriate radiation work permit prior to entering a high radiation area.

Contrary to the above, on December 9, 1992, an Operator failed to review, sign and comply with the ap3ropriate radiation work permit prior to entering a high radiation area in whici radiography was about to commence.

This is a Severity Level IV violation (Supplement IV).

Pursuant to the provisions of 10 CFR 2.201, Commonwealth Edison is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTH: Document Control Desk, Washington, D.C. 20555 with a copy to the U.S.-Nuclear Regulatory Commission, Region III, 799 Roosevelt Road, Glen Ellyn, Illinois, 60137, and a' copy to the NRC Resident Inspector at the Zion Nuclear Generating Station within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply should be clearly marked as a " Reply to a Notice of Violation" and-should include:

(1) the reason for the violation, or, if contested,- the. basis for disputing the violation, (2) the corrective steps that'have been taken and the results achieved, (3) the corrective' steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.

If an adequate reply is not received within the time specified in this Notice, an order or a demand for information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action .as may -

be proper should not be taken. Where good cause is shown, consideration will be given to extending the response time, Dated a Glen Ellyn, Illinois 2 N (gf8O thisJ1 ay of December 1992 Cpfthia D. Pederson, Chief geactorSupportProgramsBranch 9301060089 921229 PDR ADOCK 05000295 O PDR