Notice of Violation from Insp on 931012-1123.Violation Noted:Removal of Fuel from Unit 1 Reactor Vessel Was Not Suspended When All Unit 1 EDG Were Rendered Inoperable Due to Isolation of Svc Water to Generators
ML20058H242
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 12/07/1993
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20058H233 List:
References
50-295-93-20, 50-304-93-20, NUDOCS 9312130029
Download: ML20058H242 (2)


Text

F i

e i

NOTICE OF VIOLATION Commonwealth Edison Company Docket Nos. 50-295; 50-304 l

Zion Nuclear Generating Station License Nos. DPR-39; DPR-48 l

During an NRC inspection conducted on October 12 through November 23, 1993, a' violation of NRC requirements was identified.

In accordance with the " General

. Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, r

Appendix C (1993), the violation is listed below:

[

Technical Specification 6.2.1 requires that written procedures including applicable checkoff lists covering normal startup, operation, and shutdown of the reactor and other systems and components involving nuclear safety to the facility shall be prepared, implemented, and maintained.

Zion Administrative Technical Specification 3.15.1 requires that fuel l

movements be suspended if all emergency diesel generators to a unit are inoperable.

]

Zion administrative procedure 300-06A " Returning Equipment to Service" requires that, upon completion of work, the out-of-service cards be removed before the activity is cleared in the outage editor ano before closing out PT-14 " Inoperable Equipment Surveillance Tests."

l Contrary to the above:

1)

On November 3,1993, removal of fuel from the Unit I reactor vessel was i

not suspended when all Unit 1 emergency diesel generators were rendered inoperable due to the isolation of service water to the generators.

2)

Although an out-of-service for residual heat removal valve IMOV-SI8804A, was cleared in the outage editor on August 25; the PT-14 was closed on August 27 and the out-of-service cards were not removed until August 30.

This-is a Severity Level IV violation (Supplement 1).

Pursuant to the provisions of 10 CFR 2.201, Zion Nuclear Generating Station is hereby required to submit a written statement or explanation to the U.S.

j Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington,- D.C.

-l 20555 with a copy to the U.S. Nuclear Regulatory Commission, Region Ill, 799 i

Roosevelt Road, Glen Ellyn,-Illinois, 60137, and a copy to the NRC Resident i

9312130029 931207 l

PDR ADOCK 05000295.

G PDR i

)

Notice of Violation 2

i t

inspector at the Zion Nuclear Generating Station within 30 days of the date of.

the letter transmitting this Notice of Violation. This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for r

each violation:

(1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.

If an adequate reply is not received within the time specified in this Notice, e

an order or demand for information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken.

Where good cause is shown, consideration will be given to extending the response time.

l i

i b

i Dated at Glen Ellyn, Illinois l