Notice of Violation from Insp on 900716-0808.Violation noted:11 Incidents in Which Access to High Radiation Areas Not Controlled as Required by Procedure Zap 5-51-15
ML20059H160
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 09/06/1990
From: Greger L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20059H158 List:
References
50-295-90-15, 50-304-90-17, NUDOCS 9009170022
Download: ML20059H160 (1)


Text

,

.n p[

. q-1,.

u, a

y NOTICE OF VIOLATION y

o Commonwealth Edison Company Docket Nos; 50-295;' 50-304 j(

Zion Nuclear Power Station License Nos. DPR-39; DPR-48 L

As a result of the inspection conducted during 'the oeriod Jul 16 through-

[U J

-August:8, 1990, and in accordance with the " General Statement'of Policy and.

[!

. Procedure for.NRC Enforcement Actions," 10 CFR Part 2, Appendix C,.(1989)

~-

.(Enforcement Policy) the f.ollowing. violation was identified:

.e a Technical; Specification.6.2.1. requires adherence to Zion Station procedures.

. Zion Station' Administrative Procedure, ZAP 5-51-15, High Radiation Area Access j

Control, requires that high radiation access doors be closed and locked at-L..

all. times.unless a worker is posted outside the area to pr@ibit unauthorized entries.

2AP 5-51-15 also requires positive control over keys to-locked high-radiation areas.:

~

l OH Contrary to the above,'during the period from December 7, 1989 to May 10, 1990, o

there were eleven incidents in which access to high radiation areas was not controlled as required by ZAP 5-51-15.

Five of these incidents-involved th'e'

'radwaste annex door.

. s

-This-is:aLSeverity Level IV violation (Supplement IV).

j Pursuant to'thel provisions of 10 CFR.2.201, you are' required to submit to this office within thirty days of,the date of this Notice-a written statement or explanation in' reply, including for. each violation:

(1) the corrective steps that:have been taken and the results achieved;-(2) the corrective steps that 1

will be'taken to avoid further' violations; and (3) the date when full ~

compliance will be' achieved.

Consideration may be given to extending your response time for good cause shown..

SEP 6M3 Dated-L. Robert GFegfr, Chief Reactor Programs Branch i