ML20202A796

From kanterella
Revision as of 00:46, 19 November 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Tech Specs Reflecting Alternative Wording for Surveillance Which Address Only Clarification to Situational Testing Requirement
ML20202A796
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/26/1997
From:
DETROIT EDISON CO.
To:
Shared Package
ML20202A727 List:
References
NUDOCS 9712020224
Download: ML20202A796 (2)


Text

.. .. .. . . . .

, Attachment I to NRC-97-0092 ,

Page1

,t ATTACilMENT 7 PROPOSED TECllNICAL SPECIFICATION CIIANGES (ALTERNATIVE WORDING) 9712020224 971126 PDR ADOCK 05000341 P PDR

4

h. .

, ELECTRICAL POWER !YSTEMS fiOTOR 0PERATED VALfES THERMAL OVERLOAD PROTECTION QHITINGCONDi'IONFOROPERATI0t*

3.8.4.3 The thermal overload protection of each valve used -in safety systems shall be OPERABLE.

APPLICABILITY: Whenever the motor-operated valve is required to be OPERABLE.

ACTION:

With the thermal overload protection for one or more of the above required 0-.ves inoperable, continuously bypass the inoperable thermal overload within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or declare the affected valve (s) inoperable and apply the appropriate ACTION statement (s) for the affected system (s).

, SURVEILLANCE RE0VIREMENTS _

4.8.4.3 The thermal overload protection for the above required valves shall be demonstrated OPERABLE by the performance of a CHANNEL CALIBRATION of a j representative sample of at least 25% of all thermal overloads for the above required valves at least once per 18 months, and by performance of a CHANNEL  :

CALIBRATION of the affected thermal overload following any maintenance I activity which could affect the performance of that thermal overload.  !

(

FERMI - UNIT 2 3/4 8-20 Amendment No. R2, l

- . _ _ _ _ _ _ _ _ _ _ _ _________-_____________________-__- ____ _ - -_ _