ML20149G761

From kanterella
Revision as of 13:03, 26 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Requests Info Re Util Alleged Knowledge of Core Shroud Cracking at Plant in Response to Automatic Shutdown of Plant on 940829
ML20149G761
Person / Time
Site: Pilgrim
Issue date: 09/16/1994
From: Muirhead D
CITIZENS UNITED FOR RESPONSIBLE ENERGY
To: Selin I, The Chairman
NRC COMMISSION (OCM)
Shared Package
ML19352E482 List:
References
CCS, NUDOCS 9411040284
Download: ML20149G761 (2)


Text

-

- ~ . ~ .. . .

P.02 Citizens Urging Responsible Energy ".

J September 16, 1994 Ivan Selin, Chairsian US Nuclear Regulatory Commission Washington, D.C. 20$55 via Fax: (301) 504-1672 Esar Chairman Selin As you are avare, the Pilgrim Nuclear Power Station automatically shutdown on August 29, 1994. This is the fourth unplanned shutdown this year. While various malfunctions associated vith the shutdown remain under investigation, it is now apparent that the plant's main generator ves seriously damaged. Boston Bdison originally said there was "no damage to any of the equipment."

However, at a press conference last Monday, the company confirmed that Pilgrim will remain off line for up to four months to complete up to $6 million in repairs.

Our purpose in writing is to inform you that two anonymous sources have stated that Boston Edison is aware Have you been l

l that the core shroud at Pilgrim is cracked.

noticed of such findings, or has past NRC inspection activity identified any core shroud crack indications at Pilgrim 7 Clearly the NRC views the subject of core shroud cracking  !

with great concern since you have issued Generic Letter 94-03, "Intergranular stress corros,on cracking (IGasc) of core shrouds in Boiling water Reacto rs " on July 25, 1994  !

gg notice g onnortunity Igg nubile commenIni *because fact, of j e urgent nature of the actions requested.=

Federal Register, Volume 59, No. 155/ Triday, August 12, 1994 says, "The NRC determined that the need for licensees to tuplement the reauested actions quickly made it necessary  :

1 to :,ssue this generic letter immediately."

In view of Pilgrim's unexpected lengthy outage and the ,

emergent nature of this issue, we feel it vould be prudent for the NRC to novo up the schedule for Pilgrim's core shroud inspection. Have you considered this action?

(~~~WWo90dd Post Office Box 2621 . Duxbury, Massachusetts 02331 .

(617) 934-0496

r . _. , _ .

3gn te.n 'S ---

4 - 4

. p.e2 i Finally, the NRC's Week ending July " WEEKLY INFORMATION REPORT" to you for 15, 1994 notices an August 4, 1994 meeti ng with Boston Edison "To discuss the reactor vessel inspection inspection reifof request." scheduled for thz April 1995Ioscc refueling o of the company's request and the current status of thisPlease p issue.

We would also like to know what criteria, standards or the requsstedthe regulations NRC will use in deciding whether to grant relief.

We look forward to your reply.

Sincerely yours, s

Donald M. Muirhead Jr, M.D. ary C. Ott Co-Chairmen CCI i Senator Edward Kennedy Senator John Kerry

/ Congressaan Gerry Studda Attorney General Scott Harshbarger Ronald Eaton Robert Pollard 9

l l

i

7..,_.--

9 i

l

,  ?

I CONGRES8%QNAL CCRRESPONDENCE SYSTEM DOCUNINT PR.EPARATIOg MMtTET This checklist is be submitted vtth each docuamat (or group og Os/As) sent for . ing into the CLL ,

,7

2. . BRIEF DESCRIPTION OF DOCUMENTtS) b i 13#O {

3- TYPE or- -

f Correspe h re-w y (astsat ,

/

3. doc:" TINT CONTROL Sensitive (1.Jtc OR17)V Non-Seasitive
4. CONGRESSIONAL COMMITTEE and SUBCOMMITTNES (if. applicable)

Congrassional Committai Subcommittaa s

9. SUBJECT CCDES (a)

(b)

(c)

6. soURC: or DOCUMENTS ,

i (al c5520 (document naam

& AtY,achments (b) / saan. (c)

( 4) . Ratay (a) ,

otheir

7. 8YSTZX LOG EATES (a) / / !l ;I U, Dat;s. OC3. sont: docuamat. to CC3 (b) Data CCs. rossiveesdesument (c) Data returned to OC1 for additional information (d) Data resubmitted by-CCA to CC=

(a) Data antared into CCS by (f) Dats OCA notified that document is in CC:

B. COXMCIT5

. _ . . _ . - _ --- .- _ _ - _ .- _ - _ - - . . . - .