ML20149G750
| ML20149G750 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 10/31/1994 |
| From: | Taylor J NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| To: | Studds G HOUSE OF REP. |
| Shared Package | |
| ML19352E482 | List: |
| References | |
| CCS, NUDOCS 9411040271 | |
| Download: ML20149G750 (1) | |
Text
4,-
j y%
~
UNITED STATES 4
I E
NUCLEAR REGULATORY COMMISSION W ASHINGTON, D.C. 2056tM001 5
,o October 31, 1994 9
The Honorable Gerry E. Studds Member, United States House of Representatives 1212 Hanco.:k Street Quincy, MA 02169
Dear Congressman StuJds:
I am replying to your letter of October 5,1994, in which you asked the U.S.
Nuclear Regulatory Commission to respond to concerns raised by your constituent, Ms. Ott, regarding the reactor core shroud at Pilgrim Nuclear Power Station.
I am enclosing a copy of our response to Ms. Ott and Dr. Muirhead. This reply to you and the reply to Ms. Ott and Dr. Muirhead will not be publicly distributed, because we are treating the information supplied by Ms. Ott and Dr. Muirhead concerning two sources knowing of cracks in the Pilgrim core shroud as an allegation. Our process purposefully limits distribution of related correspondence to reduce the possibility of revealing the identity of individuals bringing allegations to our attention.
I hope our reply is responsive to your constituent's concerns, Sincerely,
/
Nf J
s M. 74ylor xecutive Director for Operations
Enclosure:
Letter to Ms. Ott and Dr. Muirhead l
f k,9W/#9/>ia 4
15011f9~ ~ /
.x
~~
(CM '
,