Summary of 880504 Meeting W/Util in Rockville,Md Re Status of Facility.List of Participants,Meeting Agenda & Viewgraphs Encl
ML20153E806
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 05/04/1988
From: Hopkins J
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8805100120
Download: ML20153E806 (27)


Text

. _ . _ . _ _ _ - . _ _

- - , May 4, 1988 l

Docket No. 50-425 .

l LICENSEEE: Georgia Power Company FACILITIES: Vogtle Unit 2  :

SUBJECT:

SUMMARY

OF MEETING HELD MAY 4, 1988, TO DISCUSS THE STATUS OF r I

V0GTLE UNIT 2 4

On May 4, 1988, the staff met with representatives of the Georgia Power Company  !

at the NRC offices in Rockville, Maryland to discuss the status of Vogtle Unit

2. Participants are listed in Enclosure 1.

The agenda for the meeting is included as Enclosure 2. Enclosure 3 is the viewgraphs reviewed at the meeting. GPC stated that they are on schedule for a fuel load date of February 28, 1989. I S

Jon B. Hopkins, Project Manager Project Directorate II-3 .

Division of Reactor Projects - T/II i

Enclosures:

l As stated -

cc:  :

4 See next page  ;

i l l 1

, t i  !

I a

i i

?

l JM:PDil-3 l / JHopkins:pw j $ /lf /88 8805100120 800504

! PDR ADOCK 05000425 PDR A

I l

c ,

8 o g

.. UNITED STATES

. E g NUCLEAR REGULATORY COMMISSION 5 ;E WASHINGTON, D. C. 20555

\, ...../ May 4, 1988 ,

Docket No. 50-425 LICENSEEE: Georgia Power Company FACILITIES: Vogtle Unit 2

SUBJECT:

SUMMARY

OF HEETING HELO MAY 4, 1988, TO DISCUSS THE STATUS OF V0GTLE UNIT 2 On May 4, 1988, the staff met with representatives of the Georgia Power Company at the NRC offices in Rockville, Maryland to discuss the status of Vogtle Unit

2. Participants are listed in EMlosure 1.

The agenda for the meeting is included as Enclosure 2. Enclosure 3 is the viewgraphs reviewed at the meeting. GPC stated that they are on schedule for a fuel load date of February 28, 1989.

f .

e 'Y on B. Hopkins, Project Manager Project Directorate II-3 Division of Reactor Projects - I/fi

Enclosures:

As stated cc:

See next page

l

  • Georgia Power Company Vogtle Electric Generating Plant CC:

Mr. L. T. Gucwa Resident inspector Manager of Safety and Licensing Nuclear Regulatory Ccunission ,

Georgia Power Company P. O. Box 572 P.O. Box 4545 Waynesboro, Georgia 30830 Atlanta, Georgia 30302 Mr. Ruble A. Thomas Deppish Kirkland, III, Counsel Executive Consultant Office of the Consumers' Utility Southern Company Services, Inc. Council P. O. Box 2625 Suite 225 Birmingham, Alabama 35202 32 Peachtree Street, N.E.

Atlanta, Georgia 30302 James E. Joiner Mr. Paul 0. Rice Troutman, Sanders, Lockerman, Vice President & Project Director & Ashmore Georgia Power Company 1400 Candler Building Post Office Box 282 127 Peachtree Street, N.E. '

Waynesboro, Georgia 30830 Atlanta, Georgia 30303 Danny Feig Mr. J. A. Bailey 1130 Alta Avenue Project Licensing Manager Atlanta, Georgia 30307 i Southern Company Services, Inc. '

P.O. Box 2625 Carol Stangler Birmingham, Alabama 35202 Georgians Against Nuclear Energy 425 Euclid Terrace Ernest L. Blake, Jr. Atlanta, Georgia 30307 Bruce W. Churchill, Esq.

Shaw, Pittman, Potts and Trowbridge kr. R. P. Mcdonald l 2300 N Street, N. W. Executive Vice President -

Washington, O. C. 20037 Nuclear Operations Georgia Power Company  :

Mr. G. Bockhold, Jr. P.O. Box 4545 l General Manager Nuclear Operations Atlanta, Georgia 30302 l Georgia Power Company i

P. O. Box 1600 Waynesboro, Georgia 30830 Regional Administrator, Region li U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W , Suite 2900 Atlanta, Georgia 30323 4

)

ENCt.050RE 1 ATTENDEES V0GTLE UNIT 2 MEETING May1g,12g!

NRC C Varga D. Matthews

- J. Hopkins b

GPC P7 Rice C. Whitney Southern Company Services 37 BIT 1ey 1

A

l ',

ENCLOSURE 2 NRC STATUS EETING MAY O 1988 AGENDA INTRODUCTION ORGANIZATION l

COMPLETION STATUS CONSTRUCTION 1

ENGINEERING STARTUP STAFFING /0VERTIME V0GTLE SPECIAL PROGRAMS MILESTONES i

i

i ENCLOSURE 3 Iag E . . . . . . . . . . . . . _

c gy .

s e  !

- . 3 _  % I a - p  :' a l

. E I ll p

=

as

!st . -

=

.a f a

l h .

g ,

q --

s.

~

'"J a '

E --.

k 5  !

E  :# is

$i -

a e s F g

  • le 1 - s d

e E.

p :3 W -

m ~

9W  : s a a I

! e i

S j 5 i  !  !

a en I i ,

=

g E a  :

Ig I9 i L..

o("O l5 .

o g a

l 1

UNIT 2 COMM0DITY

SUMMARY

APRIL, 1988 TOTAL SCHEDULED INSTALLED QUANTITY PERCENT

~

ESTIMATE TO-DATE TO-DATE TO-GO COMPLETE LARGE HANGERS 13,303 13,102 13,141 162 98.8%

SMALL PIPE 184,751 183,487 184,779 0 100.0

, SMALL HANGERS 21,118 18,633 18,861 2,257 89.3 TUBING 36,503 35,373 35,127 1,376 96.2 .

TUBING HANGERS 2,827 2,211 2,376 451 84.0

INSULATION 271,925 113,688 112,154 159,771 41.2 RIGID CONDUlT 428,205 411,248 420,232 7,973 98.1 WIRE & CABLE 6,929,869 6,299,097 6,568,225 361,644 94.8 TERMINATIONS 224,812 180,295 183,344 41,468 81.6 l UNSCHED. COMMOD 438,703 333,542 362,925 75,778 82.7

) PEN. SEALS 10,950 2,273 2,264 8,686 20.7 COATINGS 1,779,532 1,248,353 1,275,217 504,315 71.7 i

l

} . ..

Attcctunent 2 Revision 2. Nrch 29.1988

, SUPPORT -

SCHEDULE FOR ANALYTICAL RECEIPT i

PPP TO V SAMU 12000

LEGEND .

10,800 so . .

) As of 4/24/88 Primary Hydro ....... TOTAL HGRS Sched Cum = %39 i

.. . Act. Cum = 9926 92% Complete (IM AnPaks) j ~@- ACTUAL 34ee- - APr Sched = 1540 Act. = 1540 (As of 4/24/88) f'

/

u 92% Cum Complete ,.

7aos- -

hy Sched = 1161 ,

Act. = 63 (As of 4/24/88) ,'

l eeee- -

k z '

meo - -

1

m. .

.i l s4eo- -

)

i

! tsee- -

~

I 1

MkR MY JUL SEP NOV JAN MR MY APR -J U N AUG OCT DEC FEB APR i 19a7 - 1ssa

Attcchment 5 ,

Revision 1. November 2. _1968 V SAMU SUPPORT RECONCILIATION

  • sooo SCHEDULE

,g LEGEND ssome --

10,.800 As of 4/24/88 - / ~~-~~~- TOTAL HGRS Sched Cum = 6031 /

1 esso- - Act. Cum = 6049 561 Complete f' ACTUAL Secondary Hydro (56Anpaks) g' Apr Sched = Z"50 To Date seco. -

/ 4.51 REWORK j Act. = .361 (As of 4/24/88) ~

3 56% Cue Complete ,-

ysee- - '

a!

May Sched = 950 Act. -

0 (As of 4/24/88) ,

, rimary Hydro j (100 Anpaks)

C3 ocoo- -

  • Jun Sched = 950 l Act. = 0 (As of 4/24/88)

, none- -

i i

I sees- -

! seco- -

tsoo- -

o . .  ;  ;  ;  ;  ;  ;  ; - -  ;  ;  ;  ;  ;  ;

MAY JUL SEP NOV JAN MAR MAY JUL SEP JUN AUG OCT DEC FEB APR 'JUN AUG i

1987 -- 1988

DGETAT1 E!!s f"g%

i UNIT 2 DESIGN CHANGE STATUS FROM UNIT 1 DCR'S UNIT 2 DCR'S TO BE DESIGED 60-BKLOG EXCLUDES CANrFII Fn

.. - AM) EECTED

. . -,. l 50-1 40-un ca f5 E

I l 20-

! 10-i l

NC* D se / /i ISSLED m 0 llI a _aal 10 10 0

7 2

9 1

4 0

1 2

4 1

4 4

10 3

0 I

0 7

.m 0

2 2

0 BKLOG SO 43 36 33 32 30 27 21 24 17 15 17 WEEK Et0ING  ! 2/7 2/14 2/21 2/28 3/6 3/13 3/20 3/27 4/3 4/10 4/17 4/24 S/1 S/8 S/15 S/22: S/29

)

Ji

LESSONS LEARNED TOTAL PROGRAM 3400 --

3230 J230 3233 3235 3236 3236 TOTAL ITEE J236 3700 -- 3 ,93,,, n -----+ ---- * - - - o - - - *- - - e 887 ggg PERCENT CDhPLETE

p.
  • 3000 -- j

_ __._ m gg l l ACTUAL 2800 --

l <646

,, 7

-,e

--o4,gggy , f /2772 --------- TOTAL MnBER OF.

, .... ITEE IN. PROGRAM l 2600 -- l 2400 __

239 ,('

2200 -- 285T l f

l l

\ %m 2000 -- i at 1800 --

l w i :e  :

W

I645 1600 --  !  % 1535 1  : 1484
1 1601 ~ 'e e 8400 -- II 15l2 \

jf 1455 \

  • \

1200 -- 125 l IOI0

  • l  % 991 992 p ,942 A 1000 --941 il 987 w ~ '922 Bil / 'e? A jf N s g48 m- y y 668 810 T21 198 186

~

  • m % 5 T27 til ~ 6 600 --) 6TO 4

) 6I6 482 447 y__/

503 " ' k ~ ,AOI 381

~ e, 323 3 l 319 ~ * - o 05 ,276 ,2TI _

200 -) \

\

0 -

JAN FEB MAR APR M4Y JLN JLY AUG SLP OCT NOV DECl JAN FEB WR APR MY JLN JLY AUG SEP OCT NOV DEC JAN FEB i

i aty a l 1987 l *9ss 1989 InsmL

GEORGIA POWER COMPANY - PLANT V0GTLE UNIT 2 88-0 SUBSYSTEM RELEASE FOR TEST ACCEPTANCE DATES DATES REFLECT PROJECT MONTH STATUS AS OF 04/24/88 86 1987 1988 SEP JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 25 24 -

23 22 AN01 GK08 GA00 21 GK02 EF05 KC12 GV06 20 GLO3 GE01 LC00 HBOS 19 8 GS00 GK07 LD01 KA02 18 .A80f HB02 KC05 LD03 DE00 KAOS N 17 A80T HB03 KC06 LD04 KA03 KA08 16 AB0f A000 AC00 HB04 KC11 LDOS KA06 KB02 15 EGer .A007 CA00' AE00 HBOS KG05 StOf KB03 KB04

14 KSOY M .AE0f CB00 AK00 HG00 KN00 QA02 KE01 KB05 I

13 ,KGet BG0(T AE07 CC00 AF00 ANO2 GA03 0801 GA04 LD06 KC14 l 12 ,.KJ05 .SJ0f .280f,E80(T AG00 BG04 0802 0803 GA05 LF02 KD02 11 g XJ0( EF02r .8G07 CGOIT EF03 BM01 BM02 GC00 GJ03 GA06 LG00 KDOS 10 I NG80' ,.5007 ,990T 9001 _M10tf ,EF04~ CE00 CF00 0002 GJ05 GA07 2 03 KF01 i 9 )E100' BSSE _SdOf adof ,at2f ,Sgtof GD00 GK06 CHOO GF01 GJ06 GJ12 GA08 KF03 8 ,JiA0s , EiOE _SJ02' .,BJ07 .3L07 SHOT GE02 GN00 GLO4 GF03 GJ07 GJ13 GJ04 KF04 7 DS0(T KJer SM0f BN0(T ,DA0(T SN05' SLOf HB01 GROO GJ10 GJ08 QJ14 GJ18 KF05 6 990E ,.f!N97 ,SMOE .SNotf ,EG00- 5LGE KE02 MHOtf GT00 SD01 GJO9 GJ15 GJ19 KF06 5 SEOF ,ANOT ,200(T JCAer EActT .JB0(T jiGetT MA00 2 04 HA00 SD02 GJ11 GJ16 GJ23 LD02 4 EE0f M 3680f 3Eier ,EL30E .300f ,KBer EBINT EG00' HG06 MBOO MB0( GJ01 SE02 GJ22 GJ17 DJ24 LE00 3 . JAG 8f , RIG 0E JNie(r ,JG40E ,KFSE ,.jiCOE ,fDetr,MC0tf EF3f ,S80tf .JGCOI RC00 MIOf RP01 SF01 GK00 GJdC GJ25 LH00 2 .JeGOT QG06 Jeder 3840E LF6f SG6( .ESof .arcti 6806 M06 .5480f SA00 SC06 RP02 l SF02 SE01 GJ21 SG00 GE00 BJer"..DGGE' , SCOT S800 SC08 SHOO SG00 SJ00 SD03

, 1 JeGOY ,.INMT _RHerly ,.SGer .SG8T ,KJOE ,. SCOT SKOOjRD00 I

O b

's>  :

4 k b _h M

p li I I I

Z -X- I O

I .

0 k -

C l I

~

\ h l w sp \ \

H .j i

~

gn \ l Y- 1 I

Q M <

( -

k m s -

J l W A g T = . N -

s I! E,$ R

' .%.4 N D 8 -

t' l cn ) -

5 H

ii g

un 5 g

H z

\ '

\

N g

M l

w g g 1 CL g I

" s@ta g

\

l > I i l i l i l , I ,

~

h l h h $ $ $

8

, . 0 1

INITIAL TEST PROGRAM LMIT 2 - CtMLATIVE STATUS l P u ce(T co w u tt i 100 - m '

m,a go to lf. -- -- .

ACTUAL ni /[ N.E

-+--

  • 7-  ;

/

1 N f

  • / /

N-

  • l l 10 0 ' ' ' ' ' ' ' ' '

i 0 N O J F N A N 4 2 A 8 0 N O J F W IOffN INITIAL TEST PROGRAM - MAJOR C0F0ENTS UNIT 2 - CLMLATIVE STATUS PUCO(T IN -

EMBLE I 88.1 M,3 N N -

I 70 -

ao f 58.7 88 1 N -

! m -

1

22. 24.7 I 13 13

?

O-PUSt CATS MWpt AIR aas amrw i

BTATW 64/84/W I

l 9

- - -u_a.-

O PLANT V0GTLE UNIT - 2 TOTAL PROJECT STAFFING 88-0 BUDGET

~

e,-v 1-,.v=-a-

~

p s p / s ;*ptspsjjp};ppppsppjpps;s~

            = ! =-     ---t --      / / / / / / / }}L/f }} L / / /                                                                            ~T-_
                                                                                                                                                                 ~
            ~

e#*ttss////ftss/ts - 10000 l 9000 m .._._ E LL! l Z 7000 ._

                                                                                                                                )

F Z 6000 W i J -s

                                                                                                        ~     
  • m- / N i I., , _ _ , , , * '" . ,, "- ' - - <
                                                                                                        - ' ',                         I g

o 4000 o x 3 I -

  • sooo N

ij N g  % 1000 -

                                                  -     - - ----                            ---                                    ' - '      ~~

o JAN FEBWAPR WJUNJUL AUGSEPOCTNWDEC JAN FEBWAPRWJUN JULAUGSEPOCTNWDEC MgNMMYQ _ , 1987 1988 1989

PLANT V0GTLE UNIT - 2 TOTAL CONSTRUCTION STAFFING 88-0 BUOGET

  .1-v.1-,-v= ~      p pp p ri                 s t p s pIs s p p ssppspess                                       s   i}} Pi scr / w-   ---r - l/ / / O s / / / / / / D / / / /                                                                         ~~
                                                                                                                                                                  ~

v^ ~t 1 *L ol* t'f f / # # # 44/ 1 4/ Sooo 4300 --- -- z# W lkh&W' - y c'/ z 3300 ~

                                                                      ,                     s                                              , -.            .

g z 3000 i

                                                                                               \

NN W - 3 4 2500 \3 H \

                                                                                                         \,                     .    - - .        .- -
  -   ,-                                                                                                    \

1000 ~~ g x - o 1 T. JAN FEB MARAPR MJUN JUL AUGSEP OCT;cWDEC JAN FEB MAPR WAYJUN JLA. AUG SEP OCT NWDEC JAN FEBMARAPR MAYJUN, 1987 1988 1989

PLANT V0GTLE UNIT - 2 CORE ENGINEERING STAFFING 88-0 BUDGET t 87-1/E7-1.1/**

  • l
                                          } $ $ 4 $ $ $ $ $ $ $ $ $ ge $ $ ge p p p 1                                                                                            e g 4          4   4)pp                         s
                               ---r -. + / 4 4 4 4 si ~o ~J~4 's 4 4 }) ] }
                                                                                                                                         ~~      ~
                                                                                                                                                                                  ~          -~     ~                  -

n,. t u r. m= b- p g 1000 900 7 800 C tij I l Z 700 ' F-Z ' 600 -- L1J  ! 500 A

> 1 i
;                  H                  i      !                                                                                                                                          -        !

4 a m ,__,' ,

 !                 O                  -              ,

l

!                  L1J                l                                                                                                1 y                                                                                                                                       ..-      ...   ..., _ . ..-         ._

200 l s' "-s" wm C .r.,. -e=N

                                                                                                                               ~3 1
                                                                                                                                                                                          ~~

100 - - - - -- -- - - - - -- - - - - -- - l -- - ~

                                                                                                                                                                                                            \ --

l < i ,

                                        = m-.v= ==wocram                                                   u mmu,..v= ==wocnnum                                           - = === =v=

1987 1988 1989 4

   \                                                                                                                                                                      e                                                a
 .     . _ . _ -                    . .=.       - - _ . _                         _ _ .      _                                -          -                -      _ .           ..                            _                              .     -

I l PLANT V0GTLE UNIT - 2 TOTAL START-UP STAFFING 88-0 BUDGET 87-1/87-1,1 M 2 g$ $ $ $ q gi gg s

                                                                                                                                     $$$              $              $ } l__._._}     }                                                                        yg

', ^cT / w- -- 1 -- + # _#_#_#_f f # #, 4$ -- r _t_4 # # # _f_ f f * '

                                                                          ###?!!!!!#!!!!!///                                                                                                                                                                   a_ _ ,                            _ ,

i 2000 -l 1300 ._ _ !_ 1600 7 Il 4 q __. 4 w w E 1400 l H

                                                                                                                                                                                                                                                                  ;         f;'                                        ;
i'  :

Z 1200 i

                                                                                                                                                                                                                               #                                4 W                                                                                                                                                                       ~                                                                                             ---
                                 .a                                                                                                                                     #
                                                                                                                                                                               -   /        ..-

t 4 I 4 1000  ! t I i l  ! H .  !,

i 3 aoo l ,
                                                                                                                                                                         /

,i e - / / i, ,+; 1 i W -

                                                                                                                                                                     'J-soo 4,,- -

ss/ ,

                                                                                                                                                                                                                                                         +\-                          +

{i c ,/ ' ___3 ,

                                                                                              /                         ,

t s

 )                                        200                                                      <,                                                                                                                                                                       {         '
                                                                                         /.-     -

M  ! i l o o , 1 i 1 i i  ; i L i JAN FEBWftAPft MYJUN JUL AUCSEPOCTNOVDEC JAN FEBWftAPUt MAYJUN JUL AUGSEP OCT NCWDE( JAN FDWftAPftmY l i 1987 l 1938 1989

    -            - . _ _ . _ _ _               --_-_----______-_2                              m    _ _ _ _ _ _ - - - -                                --'w-         -

es +v-- -r--- _ _ _ _ . - ____m- _ _ _ _ _ _ - - - -

PLANT V0GTLE UNIT - 2 TOTAL B0P STAFFING 88-0 BUDGET ar-1/sz-1. stas-a---

                                                                                                                      $ # $ $ $ $ $ $ S # # # # # $ $ $ # # # #                                                                                                                                   ##44f44$$

n r / v.s.

                                                               ---r - - # # $ J 4 4 4 4 4 # # $ 4 # # S # #

i , m"ce *4'*ff444&##

                                                                                                                                                                                                                             #44444                                                                                                            _,

I  ! j i 900 7 . ... - . E -- -- , - , -,-.-._.._ ._ . _ , _ . . _ . _ , , _ . . ._, 4, f t

ui i X 700 - -- -- -- - ---

7 7 ._. -.. F i  : I l Z 600 -----m--- - -- ..--- -

                                                                                                                                                                                                                                                                   ---E-.                                                d}

W 4 f

                                           -J                                                                  l. _ _ ,                                                                                                                                                 '

j l

                                           <      soo            _m                                                                           _.

l l

                                                                                                                                                                       .__7_                                                                                                                                                                      ;
                                           )

a

                                                                                                                               '7              _-.
                                                                                                                                         }. ,.. _ s,,,                           l     [,           , , , _
                                                                                                                                                                                                                                           - -        ' - - -...   ... r          %

{ 400 __ i y j__-_ _ } ! C5 l W ' I

!                                                 m             ._                                             .         ,                                                                                                                                             ,!                                                         !

g%  ; p . . 7_ i l l Y 200  !

                                                                                                                           - 7 ]--

i i  ! i 100 - - - - + - 3 -- --- I I o 1 1, l,bi  : 1.

.                                                                                                           i mu            rrammw.nmaAuss&ocruove                                                                        m etammm.xm.xx.Aucs&ocrNovm                       ....                                     m rtsamm.am]   ._                  -

l i 1987 1988 1989 l I 4

    - . _ _ . . . _ _ -         -.                   _ _ _      _ _ _ _ _ - _ _ . - . . - - - - - - _ _ - _ _ . _ _ .                                                                               - - - - - - - - _ - -                                                            -_- - -     m        -                 --_ -         - - - .                  - _ - - - _ . . _ _ -
    ,                                                                                                                               r PLANT V0GTLE - UNIT 2 TOTAL PROJECT - OVERTIME RATE CtMLAfbt AAft Actas    Ls3 1J4 tm t#    t es t.as t. e t.as 1.41 t.se tw     t.u t.m t.64 5.+e t .*a
                  ..S       \                   -l                               !!                    !!                -

4 \ \ 3.5

                               \

3

                                \                                    .
                                                                                      \

l 2.3 N

                 ,,                     x'             '

1 0.5 1 t 0 _ ___ _ _ _ . . _ _ _i. _ !_ _ _ 1M7 1900 PLANT V0GTLE - UNIT 2 TOTAL PROJECT - OVERTIME RATE am.y nArt l 4

                                                             .                                                                   I aCLAL.S   143 143 6.44 446 440 1.44 f.as t.14 the IJi     t.i t tat  tes   til   t.ft t.34                     i i

5 ' 4.5 i ' i M cx ,

                  <                                                                                                    f        l i
      .        u                                                                                                                :

l 1 l 3 l 2.3 , 2 u I .

                 ,       l                                  .    .          .

l 1

               ,,                       .   .               I L I I                             .

I 0 I I I I I I  ; IM7 1988 15

l l I V0GTLE SPECIAL PROGRAMS I QUALITY ASSURANCE READINESS REVIEW QUALITY CONCERN PROGRAM 4 - ANTI-DRUG PROGRAM SECURITY i I s' 1 SAFETY PROGRAM i LICENSING l 4 l i i 16 i

      . l   II              l l e     llll l ll   l l l l   lill il    ll 1.II               l   L-llIlllLllll           l   l
     !sil ill ll lllllll l            ll  l
     ! ii'            ll l l l l      ! l
l l- lL"Ill Lllllll l ll 1 l I ll Illllllllll 9l l"-lllllllII" l o
;        i  ,!!!!e,isi'iii_iiiol!

n iJ ;i :i i pc a  : a =u aaa e a m 17

    .                                                                                                               L
QUALITY CONCERN PROGRAM i i

STATUS REPORT APRIL 28, 1988 i i MONTH YEAR TO DATE TOTAL (APR) (1988) PROGRAM h QUALITY CONCERNS I RECEIVED 13 53 i 1466 i INVESTIGATION COMPLETE 3 40 1452 UNDER INVESTIGATION 10 13 14 1

ANONYMOUS 2 8 208 l  !

PROTECTED ACTIVITY CONCERNS

'          RECEIVED                          0                                         3           107 INVESTIGATION COMPLETE            O                                         3 UNDER INVESTIGATION                                                                     107               '

0 0 0 NON QUALITY CONCERNS 11 42 1164 l i KNOWN SUBMITTER FEEDBACK FOR 1988 IS 67% WITH 100% SATISFIED SIGNOFFS AND 0% DISSATISFIED SIGNOFFS.  ;

  )

KNOWN SUBMITTER FEEDBACK FOR THE PROGRAM TO DATE IS 56% WITH 90% SATISFIED SIGNOFFS AND 10% DISSATISFIED SIGNOFF$.  ! i l I I

 '             NOTE: AS: OF APRIL 1, 1987, FIGURES DO NOT i

INCLUDE UNIT 1 CONCERNS. DEAN HARLESS EXT. 7930 1 1 18

. ?l 4 4 UNIT 2 LICENSING ITEMS UNDER REVIEW LETTER NO. TOPIC DATE GN-1411 PRESERVICE INSPECTION PROGRAM 11-04-87 GN-1415 FSAR AENDENT 34 - INFORMTION ON C0fMJNICATION 11-23-87 SYSTEMS GN-1416 EQUIPENT QUALIFICATION WCAPS ON NSSS - UAIT 1 12-07-87 GN-1419 FSAR AENDENT 34 - INFORPRTION ON EERGENCY 12-21-87 LIGHTING GN-1422 SPENTFUELRACKS(CRITICALITYANDSEISMIC) 12-23-87 l SL-3938 GENERIC LETTER 83-28 ITEM 2.2.2 01-05-88 GN-1423 DRAFT TECH SPECS 01-15-88 GN-1426 SNM LICENSE APPLICATION 01-22-88 GN-1427 CONTROL ROOM SAFE & ALTERNATE SHUTDOW CAPABILITY 01-25-88  ! SL-4149 STEAM GENERATOR TUDE RUPTURE 02-29-88 GN-1434 ELECTRICAL SEPARATION CRITERIA (R.G. 1.75) 03-14-88  ! SL-4413 GENERIC LETTER 83-28 ITEM 2.2.1 03-28-88 GN-1440 FSAR AENDENT 35 03-30-88 GN-1442 INSERVICE TESTING OF PU9FS AND VALVES 03-25-88 GN-1443 ENVIRONENTAL PROTECTION PLAN 04-05-88 GN-1441 SPENT FUEL RACKS (THERPML HYDRAULICS) 04-20-88 l l l 19 '

1 RJTURE SUBMITTALS l i

  • i EQUIPENT QUALIFICATION REPORTS '

I FIRE PROTECTION HAZARDS ANALYSIS I WASTE EVAPORATOR /RADWASTE ENHANCEENTS

  • l CONTROL ROON HVAC
                                                                                                      )

NEW CALCULATIONS FOR NSCW FSAR CHAPTER 13, 14, 17 CHANGES OUTSTANDING OPEN AND CONFIRM TORY ITEMS AMSAC - 10CFR50.62 INDIVIDUAL PLANT EXAMINATION - GENERIC LETTER i i REALISTIC DISPERSION M) DEL FOR 00CM I' l STATION BLACROUT - UNRESOLVED SAFETY ISSUE SECURITY PLAN CHANGES l l EERGENCY PLAN CHANGES l l l 1 i 1% _. __ _ ~ . . . _ , , . s . _.

L UNIT 2 PROJECT MILESTONES Scheduled

Primary Hydro 05/19/88 Turbine On Turning Gear 06/18/88 Secondary Hydro 07/12/88 Start Fuel Receipt 10/03/88 Start HFT 10/12/88 I
SIT /ILRT 12/11/88 ESFAS 01/07/89 i

Fuel Load 02/28/89 Initial Criticality 04/10/89 Full Power Operating License 04/17/89 l 4 i lI t I 1 I 21

i O!STRIBUTION FOR MEETING SLHMARY DATED: May'4,1988 Facility: Vogtle Electrical Generating Plant Unit 2* C9etWFtW1 NRC POR Local POR , PO!!-3 Reading Vogtle Reading D. Matthews M. Rood J. Hopkins OGC-WF E. Jordan J. Partlow ACRS (10)

  • Copies sent to persons on facility service' list}}