Revised Monthly Operating Rept & Average Daily Unit Net Power Level Log for Jan 1990 for Braidwood Nuclear Power Station,Unit 1
ML20067A941
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 12/31/1990
From: Peterson M
COMMONWEALTH EDISON CO.
To:
References
NUDOCS 9102080053
Download: ML20067A941 (4)


Text

498 Bigsili

~

. Xerox Telecopier 7020 1-8-27-90 i 14: 25 i 8154503803' DOCKET NO.: 457 8.. OPERATING QATA REPORT UNITS Bra 2

QATE: 02/09/90

- COMPILED 8Y: M. W. Peterson TELEPHONE: (815)458-2801 ext. 2480 OPERATING STATUS

1. Reporting Period: January, 1990 Gross Hours: 744
2. Currently Authorized Power Level (MHt): 3411 I Design Electrical Rating (We-gross): 1175 (We-net): 1120 ,

Design Electrical Max Dependable Rating (MHe-gross):

Capacity 1175 l

Max Dependable Capacity (MHe-net): 1120

3. Power level to which restricted (If Any): None
4. Reasons for restriction (If Any): None IHIS MONTH YR TO DATE CUNULATIVE 74,4 744 1_131s
5. Report period Hours:

744,c 744 9879.3

6. Hours Reactor Critical:

0.0 0.0 0.0

7. RX Reserve Shutdown Hours: _
8. Hours Generator on Line: 744.o 744 3 04.8 OJL 0.0 0.0
9. Unit Reserve Shutdown Hours:

Gross Thermal Energy (HHH): .l!t61079 l 1961079_ 27802037 10.

Gross Elec. Energy (HHH): _ 666416 666416 9557804_

11.

Not Elec. Energy ( W H): _Ji38460_ 638460 _ 9131435- l

12. '

" l 100 100 87.3

13. Reactor Service Factor:
14. Reactor Availability Factor: /100 100 87.3 f 100 100 86.7
15. Unit Service Factor: i 86.7 I
16. Unit Availability Factor: 100 _100_.
17. Unit Capacity Factor (MDC net): 76.6 76.6 72.1 Unit Capacity Factor-(DER net): 76.6 76.6 72.1 l 18.
19. Unit Forced Outage Rate: 0.0 0.0 _

4.5

20. Unit Forced Outage Hours: -

0.0 0.0 -

465.7 _

l 21.

Shutdowns Scheduled Over IfShutdownatEndofReport' Perk Nextpnthst-RefueMag-Outage-Httch.)

~**4 ' '

22. l

! Estimated Date of Startup: j l

L l

l (49572/10) / l L [

9102000053 900209 u r PDR ADOCK 05000457 l

R _ _ ____ PDR J

DOCKET NO.: 50-457 -

D. tMIT SHUTDOMMS/ REDUCTIONS UNIT: Braidwood 2 .

DATE: 02/0e/90, ai COMPILED BY: M. M. Peterson ;j TELEPHONE: (815)458-2901 ext. 2480 3 2

. u_

REPORT PERIOD: January, 1990 G:

o illh0D' LER10SER SYSTEM COMP 0NEMT CAUSE & CORRECTIVE ACTION

_Eg_ IMIE JXE,E WOURS, REASON

/ , . 7

/ , /,'n pf@ / ..

( @

.W eee&AAAAAAAAA4444

SUMMARY

METHOD SYSTEM & CDW m mT TYPE REASON _-

=-

A-Equipment Failure Maint or Test 1 - Method Exhibit F & N F-Forced 2 - Manual Scram Instructions for Preparation of g l.

5-Scheduled C-Refueling Data Entry Sheet y D-Regulatory Restriction 3 - Auto Scram 4 - Continued Licensee Event Report E-Operator Training ti License Examination (LER) File (NUREG-0161)

F-Administration 5 - Reduced Load G-Oper Error 9 - Other N-Other

~!

E!

%I (4957z/12)

~ ~ ~

erox 6lecopier 7020 1 2-27-90 i 14i25 'l 615t.563003* 492'01851512 C. AVERAGE DAILY UNIT NET MWER LEVEL LOG 00CKET NO.: $0-457 UNIT: Braidwood 2 DATE: 02/09/90 COMPILED BY: H. N. Peterson TELEPHONE: (815)458-2801 ext. 2480 MONTH: January, 1990

1. _

1045 17, 837

2. 1033 18. 817 ,
3. 1023 19, 819
4. 1011 20. __815
5. 1011 21. 794  !

988 22. 795 I

6. -
7. J15 23. . 786
8. 954 24, 779 ;l
25. 740  !
9. 942
10. 928 26, 735
11. 920 27. 712 ,,

12, 913 28, 701 _  ;

13. Bal _ 29. 688 14, 891 30. 670 -
15. 881 31. 657
16. 861 i

INSTRUCTIONS On this form list the e.verage daily unit power level in HWe-Net for each j day in the reporting month. Compute to tie nearest whole megawatt.  !!

These figures will be used to plot a graph for each reporting month. I Note that when maximum dependable capacity is used for the net electrical rating of the unit there my be occasions when the daily average power  :

. level exceed; the 100% line (or the restricted power level line). In i such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

/h2l4.nl2gpZW AgLk

~ ~c MI ce&~}'

/

f" r/L. u.L - as w " r"-

y ~fd - y

' ~ ~ ~ ~

xerox Telecepter 702012-27-iOT14igf~i ' ~ ~ ~ 61hhM05 + 39281h:#10 l l

1. Monthly Report for Braidwood Unit 2 A. Summarv of Ocaratina Erearience f The unit entered the month of January at approximately 92%

power. The unit is in an extended coastdown as it l approaches the refueling outage. The unit continued power operation through the end of the month.

l l