ML20134J756

From kanterella
Revision as of 02:08, 2 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards 120-day Response to GL 96-06, Assurance of Equipment Operability & Integrity During Design-Basis Accident Conditions
ML20134J756
Person / Time
Site: Pilgrim
Issue date: 01/28/1997
From: Olivier L
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BECO-2.97-006, BECO-2.97-6, GL-96-06, GL-96-6, NUDOCS 9702120280
Download: ML20134J756 (8)


Text