Monthly Operating Rept for Oct 1996 for Callaway Plant Unit 1
ML20134K576
Person / Time
Site: Callaway Ameren icon.png
Issue date: 10/31/1996
From: Affolter R, Holmes M
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-3485, NUDOCS 9611190218
Download: ML20134K576 (7)


Text

, . _

Callaway Pl ant p ,

Post Office Bcx 620 Fu!:an, Missoun 65251 UNTON Eucnuc 33 November 6,1996  :

I U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop Pl-137 Washington, DC 20555-0001 l ULNRC-3485 Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTIILY OPERATING REPORT OCTOBER 1996 The enclosed Monthly Operating Report for October 1996 is submitted pursuant to Section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

M R. D. ffolter Manager, Callaway Plant RDA/ Mall /Imf Enclosure f&:24'i 9611190218 961031 PDR ADOCK 05000483 R PDR

4 ULNRC-3485 l l November 6,1996 '

L . Page 2 cc: Mr. L. Joe Callan Regional Administrator l U.S. Nuclear Regulatory Commission l Region IV l 611 Ryan Plaza Drive, Suite 400 '

Arlington, TX 76011-8064 l

l- E.aior Resident Inspector

{

l Callaway Resident OITice l U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Ms. Kristine M. Thomas (2 copies)  :

l Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation  !

l U. S. Nuclear Regulatory Commission

! Mail Stop 13E16 Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102 Mr. Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street N.W. i Washington, DC 20037  !

I l

i ULNRC-3485 November 6,1996 f- , ' Page 3 bec: Institute of Nuclear Power Operations Records Center .

Suite 100  !

700 Galleria Parkway I Atlanta, GA 30339-5957 l Dottie Sherman

!~ '

American Nuclear Insurers 29 S. Main Street

- West Hartford, CT 06107 l l

Mr. T. M. Handlan I Westinghouse Electric Corp.

I1601 Lilburn Park Road St. Louis, MO 63146 Mr. Fred Yost -

Director of Research .

Utility Data Institute 1700 K. Street Northwest Suite 400 i Washington DC 20006 D. F. Schnell (400)

G. L. Randolph J. V. Laux/G. A. Hughes A. C. Passwater/D. E. Shafer (470)

M. P. Barrett (100)

P. L. Reynolds (470) NSRB R. J. Irwin (470)

M. E. Taylor

! H. D. Bono E210.0001 A160.0761 RDA Chrono Manager, Plant Support Wolf Creek Nuclear Operating Corporation PO Box 411 r

Budington,KS 66839

_ . _ _ ._ . . . . . . . . . . . . . _ ___ _ -_.__....._m . . . . __ _ . _ _ . . . _ _, . . . _ _

=. .

l i

i i; -

?

DOCKET NO.: 50-483 UNIT NAME:

)

CALLAWAY UNIT 1'- '

DATE: 11/6/96 COMPLETED BY: M. A. llotmes I TELEPliONE: 573/676-8842 i FAX: 573/676-8562 T

l l

l PART A -OPERATIONS

SUMMARY

The plant started a refueling outage coast down during the month of October. The coast down stat ,d at approximately 0200 on 10/6/96 and continued until licensed operators removed the unit from service at 0018 on 10/12/96. This is the eighth refueling outage for Callaway.

PART B- PORY AA 4. iFETY VALVE

SUMMARY

l None.

i l

l l

1 Page1of4

.. - . . . .. -. - - ._ ~ . .. . - _ - - - . - -- . . . . - . . .- .-.

4 a

l PART C AVERAGE DAILY UNIT POWER LEVEL I l

DOCKET NO: 50-483 l UNIT: Callaway Unit 1 l DATE: 11/6/96

  • {

COMPLETED BY:

M. A. Holmes -

TELEPHONE: 573/676-8842 FAX: 573/676-8562 MONTH: OCTOBER 1996 i

AVERAGE DAILY POWER AVERAGE DAILY POWER LEVEL LEVEL DAY (MWe-Net) DAY (MWe-Net) 1 1.156 17 0 2 1.157 18 0 3 1.169 19 0 4 1.168 20 0 5 1.158 21 0 6 1.042 22 0 l l

7 1.001 23 0 8 1.010 24 0 9 936 25 0 10 721 26 0 1

i

.11 610 27 0 l 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 i

16 0 Page 2 0f 4

i .

1-

  • i PART D l l OPERATING DATA REPORT 4

DOCKET NO.: 50-483  !

UNIT NAME: CALLAWAY UNIT 1

! DATE: 11/6/96 l I

COMPLETED BY: M. A. Holmes  !

TELEPHONE
573/676-8842 4

FAX: 573/676-8562 OPERATING STATUS:

(OCT) (YTD) (CUM)

'l. REPORTING PERIOD:

GROSS HOURS IN REPORTING PERIOD: 745 7,320.0 104,005.5 2 CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1125 DESIGN ELECTRICAL RATING (MWe-Net): 1171

- 3. POWER LEVEL TO WillCH RESTRICTED (IF ANY)(MWe-Net): 100 %

4 REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE

5. NUMBER OF FLOURS REACTOR WAS CRITICAL, 266.0 6,814.0 91,939.5
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. IIOURS GENERATOR ON-LINE 264.3 6,787.0 90,428.4
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH 829,440 23,794,074 306,752,792 1
10. GROSS ELECTRICAL ENERGY GENERATED 281,418 8,092,356 104,613,210 l

- (MWH) l1. NET ELECTRICAL ENERGY GENERATED 261,293 7,713,757 99,537,129 (MWH)

12. REACTOR SERVICE FACTC'1 35.7 93.1 88.4
13. REACTOR AVAILABILITY FACTOR 35.7 93.1 88.4
14. UNIT SERVICE FACTOR 35.4 92.7 - 86.9
15. UNIT AVAILABILITY FACTOR 35.4 92.7 86.9 i
16. ~ UNIT CAPACITY FACTOR (Using MDC) 31.2 93.7 85.1

' 17. UNIT CAPACITY FACTOR (Using Design MWe) 30.0 90.0 81.7

18. ~ UNIT FORCED OUTAGE RATE 0.0 0.56 2.21
19. SilVTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refueling Date: 10/12/96 Duration: 42 days

20. IF SHUT DOWN AT END OF REPORTING PERIOD, ESTIMATE DATE OF STARTUP:

Page 3 of 4

. t PART E '

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-483 UNIT NAME: CALLAWAY UNIT I ,

DATE: 11/6/96  !

COMPLETED BY: M. A. Holmes TELEPHONE: 573/676-8842 FAX: 573/676-8562 REPORT MONTH: OCTOBER 1996 i

METHOD GF i TYPE SHUTTING DOWN

} F: FORCED DURATION THE REACTOR OR CORRECTIVE NO. DATE S: SCHEDULED (HOURS) REASON REDUCING POWER ACTIONS / COMMENTS 7 961012 S 480.7 C 1 Refueling outage. See comments below.

SUMMARY

7. The plant started a refueling outage coast down during the month of October. The coast down started at approximately 0200 on 10/6/96 and continued until licensed operators removed the unit from service at 0018 on 10/12/96. This is the eighth refueling outage for Callaway.

REASON METHOD A: EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL B. MAINT. OR TEST 2: MANUAL SCRAM '

C: REFUELING 3: AUTOMATICSCRAM D: REGULATORY RESTRICTION 4: OTHER(EXPLAIN)

E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATION G: OPERATIONAL ERROR (EXPLAIN) l H: OTHER(EXPLAIN)

Page 3 of 4