ML20136E491

From kanterella
Revision as of 02:48, 1 July 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Updated Schedule for St Lucie FY1
ML20136E491
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 11/13/1996
From: Mark Miller
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Julian C, Son Ninh
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17229A261 List: ... further results
References
FOIA-96-485 NUDOCS 9703130219
Download: ML20136E491 (8)


Text

( ,, * .

i

.. O i -

From: Mark Miller, f.Z4 '

_ , i

=To: ' CAJ, SON CIV I # 8 4.1 I b N N h kll 8

j Date: 11/13/961:53pm -

Subject:

Updated St. Lucie Schedule FYI t

1 l

4 i

. 970313021997b306-

'/- . BINDER 96,483 PDR zg j

.j-y Sunday Monday Tuesday - Wednesday Thursday j

j 3 4 5 6 7

  • Fred Whght
  • SSFl Bagman
  • SSFl Beginan
  • Fred Wnght *
  • SSFlBagman
  • Fred Whght
  • Fred Wnght
  • Mark on Leave e i
  • Mark on Leave
  • Mark on Leave
  • Mark on Leave
  • Sanden Here *
  • Branch Call
  • Sandin Here
  • Sandin Here
  • Sande
  • JoeUDave at TTC
  • JoeUDave at TTC
  • JoeuDave at TTC i
  • Joel/ Dave at TTC 10 11 12 13 14
  • St Luoe CAP 6n ADanta  !
  • VETERAN'S DAY
  • CW f

17 18 19 20 21

  • Joel at McGuire a Joel at McGuire
  • Joel at McGuire
  • Joel at McGuire *
  • Caudie Juhan
  • Mark to HQ
  • Fred Wnght *
  • Fred Whght
  • Fred Wnght
  • Fred Wnght *

, ssp l

  • Branch Call , 33p,
  • News Conf ,
  • SSFl
  • SSFi 1 l

24 25 26 27 28

  • Start 96-20
  • ""
  • Dave on n *
  • Joel on Leave ,
  • THANKSGMNG
  • n on t-. .
  • Joel on Leave 6

J e

  • 9 s

i

- , , ~

r Sunday Monday Tuesday Wednesday Thursday 1 2 3 4 5

  • Weens /Shearon
  • ResKlent Meeting
  • Resdent Meeting
  • Resdent Meebng *
  • Cayne (requal)
  • Joelin DC tranng
  • Joelin DC Tranng
  • Cayne (requal)
  • Dave on Leave . .
  • Cayne (requal)
  • Cayne (regual)
  • Hopper (Site Coverage) *
  • Hopper (Srte Coverage)
  • Hopper (Site Coverage)
  • Hopper (Site Coverage)
  • Fred Wht *
  • Fred Wnght
  • Fred Wnght
  • Fred Wnght
  • , 337, ,
  • Branch Call
  • News Conf.

,337,

  • SSFi .SSFl 8 9 10 11 12
  • Branch Call
  • Enforcement Conference a Joel onleave
  • Joel on Leave *
  • *** ~
  • S$Fi 4
  • t 15, 16 17 18 19
  • Joel to RI
    1. I
  • Joetm R1
  • Mark Leave *
  • News Conf d

22 23 24 25 26

  • Mark Leave
  • CHRISTMAS
  • Mark Leave a 5
  • Branch Call 29 30 31
  • Mark Leave ,

i

  • Branch Call 9

9 9

- .. - . . - .- ~ . . - . . . . - . . . . _ - . - - . . - . . . . . . --. - . . . - - . . - , .

.. .~

9 Sunday Monday Tuesday' Wednesday Thursday I j

1 2  :

  • NEW YEARS
  • Mark Leave
  • i i

5 6 7 8 9 r

  • 40500inspechon
  • 40500 bem
  • 40500 inspecten a 40500 inspecta
  • 3
  • SSF1
  • SSF1
  • f SFi
  • 12 13 14 15 16 i i

7 l

19 20 21' 22 23

  • Joel on Rotatuit (pionned)
  • Joel on Rotshon (planned)
  • Joel on Rotshon (planned)
  • Joel on Rotation (pionned)
  • 4 J

a f

i- 26 27 28 29 .30

  • Joel on Rotebon (pionned)
  • Joel on Rotshon (pionned)
  • Joel on Rotebon (pionned)
  • Joel on Rotebon (planned) .

5 i

i.

g 4

d

.Je d

t h

a

. I a

t i

4 8

4

. 1 i

'i i Sunday Monday Tuesday Wednesday Thursday

]

l i

l

)

l s

l 2 3 4 5 6

  • Son Here
  • Son Here
  • Son Here a Son Here .
  • Len on 50 59
  • Len on 50.59
  • Len on 50.59
  • Len on 50.59 *
  • Joel on Rotebon (planned)
  • Joel on Rotebon (planned)
  • Joel on Rotabon (planned)
  • Joel on Rotabon (planned) +

9 10 11 .12 13

  • Joel on Rotabon (pionned)
  • Joel on Rotabon (planned)
  • Joel on Rotebon (planned)
  • Joel on Rotebon (planned)
  • 16 17 18 19 20 1
  • Joel on Rotebon (planned)
  • Joel on Rotabon (planned)
  • Joel on Rotabon (planned)
  • Joel on Rotabon (planned) =

I 23 24 25 26 27

  • Joel on Rotabon (planned)
  • Joel on Rotabon (planned)
  • Joel on Rotabon (planned)
  • Joel on Rotshon (planned) ll e l I

1 1

i 1

4

.. J 5

. I 4

f-

. . . . . . . . . . . . . - . . - . .... .- . ..- -.. . ~ . - - - . . . - . .. - . . . . . _ . . . . -

e, . . .

i-

< a

'W D

c j

Sunday. Monday. Tuesday Wednesday Thursday

( ,

i e

2 3 4 5. 6 a Joel on Rosebon (pionned)

  • M on Rotebon (p6enned) . . Joel on Rotebon (planned)
  • Joel on Rotebon (pionned)
  • I 9 10 11 12 13 I Joel on Rotshon (pionned)
  • Joel on Rotebon (pionned) '

. Joel on Rotebon (pienned)

  • Joel on flotebon (pienned)
  • t 16 17 18 19 20 '

?

I 23 24 25 26 27 9

30 31

1. ,

> \

)

h i

e i

i i

. 4 r

e a

4

.m y y- -$,--~~ , -.4--ee - e r- - * * - ~ , . * * - - ~ P ~ " '

s 1

4.

Sunday Monday

  • Tuesday Wednesday Thursday 1 2 3 6 7 8 9 10 13 14 15 16 17 l

20 21 22 23 24 1

l 27 28 29 30 l

I s

6 D

e

w  ;

WEEKLY. BRANCH CHIEF STATUS REPORT BRANCH 3- SIGNATURE Kerry D. Landis DAT(,11/14/96

. PLANT ISSUES / EVENTS:

~

-a) 'St Lucie? Both units operated at 100% for the entire week.

b) Turkey Point - Both units operated at.100% for the entire week.

c) Crystal River. -- FPC revised plans to remain shutdown until the end of February.1997.

SIGNIFICANT INSPECTION FINDINGS / INITIATIVES: j a). Crystal River - The. Restart panel met on 11/13/96 to prepare the restart check list and  ;

action plan in accordance with MC 0350.  ;

P b): .. Crystal Rive'r - MCAP 11 meeting was held in Region II oli 11/14/96.

c) St Lucie - The EP. inspection identified potential multiple violations. The-vfolations-were in the areas of timely activation of response facilities.. training of response personnel and corrective actions. The enforcement panel determined this week that <

these' violations will be the topic of an enforcement conference on 12/10/96. NRC questioned FP&L this week whether or not their emergency plan requires that each responder has to have participated in a site specific drill prior to being placed on

.the responder list. After a conference call. FP&L agreed to provide NRC a submittal by.11/20/96 to clarify their position on this issue.

d) No new'FSAR discrecancies were identified this week.

NRC PERSONNEL ISSUES / STATUS:

a) Credit Hours authorized: None b) A' solicitation of interest 'was issued for another Crystal River RI position.

LSSUES/ ACTIVITIES EXPECTED NEXT WEEK:

11/19/96 - Briefing of EDO on the CR EDG overload and the EFW modification outside design basis issues.

11/22/96 .J. Jaudon will brief CR onite of the results of the CR Restart Panel-4 4

4 I

O i.