Forwards Schedule for Activities at Plant for Next Few Months
ML20136E301
Person / Time
Site: Saint Lucie, Three Mile Island  Constellation icon.png
Issue date: 10/31/1996
From: Mark Miller
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17229A261 List: ... further results
References
FOIA-96-485 NUDOCS 9703130170
Download: ML20136E301 (9)


Text

'Ci

~

z.

d From:.

Mark Miller'/ O_/,.

To:

CAJ C T OisA N, ( $ 1 Date:

10/31/96 6:31am

Subject:

Welcome to St. Lucie Kerry informed me that you were the boss for a while. Here's a schedule for activities at St. Lucie for the next few months. I update this calendar waekly and I'll be copying you on it as we go. Particular points of interest...

I'll be on leave next week. That coincides with the SSFI bagma.n trip and Fred Wright's inspection. If this is a problem, let me know.

I'll be on leave for a couple of weeks at the Christmas holiday.

Joel will be rotating to NRR in January for two months. We need to find someone to act for him. Steve Sandin (AEOD), who has spent a lot of time here and who's a very good

' inspector, has indicated that he may be able to pick up a month of it, but we may need you to talk to his boss.

Talk to you later CC:

KDL l

9703130170 970306 PDR FOIA BINDER 96-485

_PDR

f 3

Sunday Monday Tuesday Wednesday Thursday 1

2 3

  • News Conf a

9 6

7 8

9 10

  • Kroh/Barts
  • Kroh/Barss
  • News Conf
  • Kreh,Sarse
  • York /Rapp
  • Kreh/ Barns

,y

  • Branch Can
  • York /Repp 13 14 15 16 17 DIR DRP
  • hs Cont
  • Wams COLUMBUS DAY
  • Kreh/Barss Kreh/ Barns

,y pp YorWRapp

  • York /Rapp l

20 21 22 23 24

  • Self Assessment to Kerry
  • Kenny Thomas
  • Kenny Thornas
  • Kenny Thornas
  • Kenny Thomas
  • Sandin Here
  • News Conf.
  • Sandin Here Joel/ Dave at TTC
  • Joel/ Dave at TTC Sandin Here Joel/ Dave at TTC
  • Branch Call
  • Sandin Hers
  • RA Breif for SMM 27 28 29 30 31
  • Branch Call
  • Kreh/Barrs
  • News Conf.
  • Kreh/Barts
  • Kreh/Barrs
  • Sandin Here
  • Kreh/Barrs
  • Sanden Here
  • e an at M
  • Sandin Here
  • Sa in Here a JoeVDave at TTC "C'
  • Joel/ Dave at TTC
  • JoeVDave at TTC Out

]

9 4

9

i j

i

.l s

Sunday Monday

-Tuesday Wednesday Thursday i

)

1 3

4 5

6 7

  • Fred Wnght
  • SSFl Bagman a SSFl Bagman
  • Fred Wnght
  • SSFi Bagman
  • Fred Wnght
  • Fred Wnght
  • Mark on Leave i

a Mark on Leave

  • Mark on Leeve
  • Mark on Leave
  • Sanden Here
  • Branch Call
  • Sanden Here
  • Sand n Here JoeVDave at TTC
  • Sandin Here 4
  • JoeUDeve at TTC
  • JoeuDave at TTC l

)

  • JoeuDeve at TTC.

10 11 12 13 14

^

  • VETERAN'S DAY
  • News Conf 17 18 19 20 21,

j j

  • Joel at McGuire a Joel at McGure a Joel at McGure
  • Joel at McGuire
  • Fred Wnght
  • Mark to HQ
  • Fred Wnght
  • Branch Call
  • Fred Wnght
  • Fred Wnght
  • SSFl
  • SSFi
  • SSFl Conf
  • Len Weins
  • Len Weins
  • Len Weins 24 25 26 27 28
  • Joel on Leave
  • THANKSGMNG
  • Joel on Leave

. Joet on Leave l

i e

0 4

l 5

1 Sunday Monday Tuesday ~

Wednesday Thursday 1

2 3

4 5

  • Hopper
  • Resident Meebng
  • Resdent Meebng
  • Rescent Meeting
  • Fred Wnght
  • Hopper
  • Joel in DC Tranng

. Hopper e Joelin DC tranng

  • Branch Call
  • Fred Wnght
  • Hopper a

E

  • SSF1
  • $$Fi
  • News Conf.

, 33pg

  • SSF) 8 9

10 11 12

  • Branch Call
  • News W e

,337,

,337,

  • SSFl
  • SSFl 15 16 17 18 19
  • Joel to R1
  • Joelin RI
  • Joelin RI
  • Joel on Leeve a Joel on Leave
  • News Cor.f.

22 23 24 25 26

  • Mark Leave
  • CHRif TMAS
  • Mark Leave
  • Branch Call 4

d 29 30 31

  • Mark Leave
  • Branch Call t

a

f 5

m-=

Sunday Monday Tuesday Wednesday Thursday 1

2 e

  • NEW YEARS
  • Mark Leave 5

6 7

8 9

  • SSFl
  • SSFl SSFl
  • SSFl 12 13 14 15 16 19 20 21 22 23
  • Joel on Rotstxm (planned)
  • Joel on Rotabon (planned)
  • Joel on Rotaten (planned)
  • Joel on Rotabon (planned) 26 27.

28 29 30

  • Joet on Rotabon (pienned)

Joet on RotatKm (planned)

  • Joel on Rotabon (planned)
  • Joel on Rotaten (planned) i 4

6 9

e e

e 8

4 b

0

4 Sunday Monday Tuesday Wednesday Thursday I

2 3

4 5

6

  • Son Here
  • Son Here
  • Son Here
  • Son Here
  • Len on 50.50
  • Len on 50 59
  • Len on 50.59
  • Len on 50,59
  • Joel on Rotshon (pionned)
  • Joel on Rotshon (planned)
  • Jeol on Rotabon (planned)
  • Joel on Rotaban (pienned) 9 10 11 12 13 4
  • Joel on Rotaban (planned)
  • Joel on Rotabon (planned)
  • Joel on Rotabon (planned)
  • Joel on Rotabon (planned) d 1

16 17 18 19 20

  • Joel on Rotabon (planned)
  • Joel on Rotebon (planned)
  • Joel on Rotabon (planned)
  • Joel on Rotabon (planned) 4 23 24 25 26 27
  • Joel on Rotabon (planned)
  • Joel on Rotebon (planned)
  • Joet on Rotabon (planned)
  • Joet on Rotabon (planned) 4 i

i e

i

a.

~

r j

- sund.y -

m 4.y Tu 4.y w.en 4.y Th - d.y i

i h

2 3

4 5

6

  • Joel on Rolston (planned)
  • Joel on Rotetson (pionned)
  • Joel on Rohshon (pionned)
  • Joel on Rotebon (ptonned)

.i 9

10 11 12 13

  • Joel on Rotelen (pionned)
  • Jost on Rotshon (pionned)
  • Joel on Rotshon (pienned)
  • Joel on Rotelen (pionned) t 16 17 18 19 20 23 24 25 26 27 5

M i

!~

a-l-

30 31 4

0 4

4

't e

0 -

e 4

1 c

a

~

WEEKLY BRANCH CHIEF STATUS REPORT'

]

BRANCH'3 SIGNA.TURE Kerry D'. Landis DATE 10/31/96 PLANT ISSUES / EVENTS:

a)-

St Lucie - Units' 1 and'2 operated at 100%.for the entire week.

i b).

Turkey. Point Both units operated at 100% for the entire week.. Unit 4 completed its

.poweruprateffrom.2200to2300MWthon10/30.

..c)

Crystal River - FPC plans to remain shutdown for the remainder of the year to restore i

greater design margin in some systems and submit the necessary license amendments. -The

.pending ' license amendment is to resolve several US0s on EDG loading and EFW.

susceptibility to single failure.

?

Emergency Preparedness Exercise was conducted on 10/16/96. No major deficiencies were

. identi fied.

~ SIGNIFICANT INSPECTION FINDINGS / INITIATIVES:

a)

. Crystal River - Failure to perform an adequate 10 CFR 50.59 evaluation 6n diesel generator loading following a modification to remove the automatic start of the turbine i

driven auxiliary feedwater pump.

]

b)

Crystal River - EFW susceptibility to single failure: during LOOP a failure of one fuse could cause an EFW flow control valve to fail open allowing one EFW pump to go.to

runout, Since both EFW pumps draw suction through the same pipe, the resulting flowrate would cause cavitation and failure of both EFW pumps.

c)

St Luc'ie/ Turkey Point - A vulnerability was identified in the safeguards procesC for FPL where the access authorization was not immediately removed for individuals whose

-employment was terminated. One individual after employment termination reentered the

. site approximately five times for a total of 15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br />.

d)

St Lucie - The EP inspection identified potential multiple violations. The violations were in the areas of' timely activation of response facilities. training'of respons'e personnel and corrective actions for 1995 Hurricane Erin critique items.

NRC PERSONNEL' ISSUES / STATUS a)

Credit Hours authorized: None b)-

-Jose Rey'es was selected as the Turkey Point'RI.

)

C)-

Ross Butcher. the Crystal River SRI. will retire from.NRC as effective of November 1.

1 1996; i

ISSUES / ACTIVITIES EXPECTED NEXT WEEKi l

St'Lucie> - NRR A\\E Exoanded SSFI. Team Site Visit

- Radiological Protection Inspection LTurkey Point 3 Maintenance andLtest of Safs Shutdown Panels Inspection

\\y i

kp i

w

}V

r 9

d.

. WEEKLY BRANCH CHIEF STATUS REPORT BRANCH 3-SIGNATURE Kerry D. Landis' _

DATE 10/10/96

. PLANT ISSUES / EVENTS:

- a).

.St Lucie - Both units,are operating at 100%.

~

b)

Turkey Point - Both units are operating at 100%.

Unit 4 had a ~ feed water heater. relief lift prematurely due' to a :know design' flaw.

The spring is susceptible to hydrogen embrittlement.. The relief valve was like kind replaced with the unit at 77% power.

This problem does not effect Unit 3.. Unit-4 will be taken off line in about a-week to replace the springs on all 8 of the effected relief valves.

Unit 3 and ~4 received the license amendment allowing thermal uprate of approximately 5% power.

Unit 3 is performing all the equipment calibrations to support the upr. ate with plans to next week actually raise power to the new 2300 Megawatts thermal.

Unit L3 and 4 reported a procedural error which 'would have allowed a potential uncoiltrollable radiological rel. ease to the environment.(see the attached 50 72).

c)

Crystal River - The unit remains shutdown pending a license amendment to resolve several US0s on EDG loading and Emergency Feedwater (EFW) susceptibility to single failure.

FPC plans to submit a remain shutdown for another two months or more to resolve the design issues and submit the necessary license amendments (see attached PN).

An " unusual event" was declared on October 7. 1996, at 8:49 a.m. because

'of a hurricane warning. issued by the State of Florida. At approximately 11:00 p.m. on October 7.1996. the National Hurricane Center lifted the hurricane warning for the Crystal River area. At that time the licensee exited the Unusual Event (see the attached PNs).

The investigation by the' licensee into the apparent tampering event -

associated with the "A"

EDG was completed on 10/03/96.

The licensee

. concluded that poor work practices caused-strairier blockage and has secured from the security alert.

Billy Crowley revie.ved the report on 10/7/96 and exited with the--licensee on 10/9/96.

SIGNIFICANT INSPECTION FINDINGS / INITIATIVES:

a)

Crystal River:- Failure to perform an adequate 10 CFR 50.59' evaluation on

' diesel generator loading following a modification to remove the. automatic start of:the turbine driven auxiliary feedwater pump.

b)

Crystal River Emergency ~' Feedwater (EFW)- susceptibility to single

. failure during LOOP a. failure of one fuse could cause.an EFW flow control.

valve'to fail open allowing one EFW pump to go to runout. Since both EFW pumps draw suction; through the same pipe, the' resulting flowrate.would cause cavitation and failure.of both EFW<pupps.

-y t