MONTHYEARML20217C5311999-10-0808 October 1999 Notification of 991027 Meeting with Representatives of Gpu in Rockville,Md to Discuss Recent Control Rod Surveillance Performance Issues at TMI-1.Proprietary Portions of Meeting Will Be Closed to Public ML20217F0841999-10-0808 October 1999 Informs That During 466th Meeting of ACRS on 990930-1002, CEOG Proposal to Eliminate PASS from Plant Design & Licensing Bases for CEOG Plants,Were Reviewed.Discussion & Recommendations,Listed ML20212K8901999-10-0505 October 1999 Notification of 991027 Meeting with Util in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TM1-1 ML20216J0151999-09-29029 September 1999 Notification of 991020 Meeting in Forked River,Nj to Discuss Licensee 990922,response to NRC & Other Info Addressing Sale of Portion of Land That Is Part of Plant Site ML20216G3671999-09-10010 September 1999 Forwards CNWRA Program Manager Periodic Rept (Pmpr) for Period 990731-0827 ML20210U7571999-08-20020 August 1999 Forwards Info Received from Gpu Nuclear,Inc on 990820 in Preparation for 990823.Requests Info Be Docketed ML20210C9991999-07-22022 July 1999 Revised Notification of 990813 Meeting with Gpu Nuclear,Inc Rockville,Maryland to Discuss TMI-1 Licensing Action Status. Meeting Date Changed ML20210E9511999-07-12012 July 1999 Notification of 990805 Meeting with Representative of Gpu Nuclear,Inc in Rockville,Md Re Plant,Unit 1 Licensing Action Status ML20212H9621999-06-23023 June 1999 Revised Notification of Meeting with Gpu Nuclear,Inc to Discuss Proposed Mods to RBS Sys Procedures & HPI Cross Connect Lineup.Meeting Rescheduled to 10 A.M. on 990713 ML20195H8521999-06-18018 June 1999 Requests That Encl Questions,Faxed to Gpu Nuclear,Inc on 990616,be Docketed,In Preparation for Forthcoming Conference Call Re TS Change Request 248, Remote Shutdown Sys, ML20195H9911999-06-15015 June 1999 Notification of 990707 Meeting with Util to Discuss Licensee Proposed Mods to Reactor Bldg Spray Procedures & High Pressure Injection Cross Connection Lineup ML20206F2921999-05-0505 May 1999 Forwards Draft Questions Which Were Faxed to Licensee for TMI Unit 1,GPUN on 990505 in Preparation for 990506 Conference Call on TS Change Request 279 ML20206D1291999-04-28028 April 1999 Notification of 990507 Meeting with Gpu Nuclear,Inc in Rockville,Maryland to Discuss Three Mile Island,Unit 1 Licensing Action Status ML20205N3161999-04-0909 April 1999 Notification of Significant Licensee Meeting 99-19 with Util on 990423 to Discuss Emergency Feedwater Flow Discrepancies ML20207L5671999-03-12012 March 1999 Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam for Test Administered on 981130,1204-14 & 18 ML20207E6091999-03-0303 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980622-26 ML20197G6381998-12-0707 December 1998 Forwards Program Manager Period Rept (Pmpr) for Period 981024-1120 ML20196E2801998-11-30030 November 1998 Discusses Closeout of TAC MA1607 Re Cross Potential for common-cause High Pressure Injection Pump Failure IR 05000289/19983011998-11-0404 November 1998 Forwards NRC Operator Licensing Exam Rept 50-289/98-301 with as Given Written Exam for Tests Administered on 980824-27 at Facility ML20154G3451998-10-0101 October 1998 Rev 2 to Notification of Significant Licensee Meeting 97-73 on 981023 in King of Prussia,Pa to Discuss Actions Taken Re Engineering Corrective Action Performance Assessment Team Findings ML20153D9681998-09-24024 September 1998 Notification of 981006 Meeting W/Gpu Nuclear,Inc in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20237E8381998-08-28028 August 1998 Notification of 980917 Meeting W/Gpu Nuclear,Inc & Amergen in Rockville,Md to Discuss Sale & Transfer of TMI-1 from Gpu Nuclear,Inc to Amergen ML20237E4591998-08-20020 August 1998 Submits Rev 1 to Notification of Significant Licensee Meeting 98-73 W/Util in Middletown,Pa to Discuss Actions Taken Re Engineering Corrective Action PA Team Findings. Meeting Postponed ML20237C9401998-08-14014 August 1998 Notification of Significant Licensee Meeting 98-73 on 980828 W/Gpu Nuclear,Inc in Middletown,Pa to Discuss Actions Taken Re Engineering C/A Performance Assessment Team Findings ML20236Y6301998-08-0808 August 1998 Forwards Monthly Rept Reflecting Status of 10CFR2.206 Petitions as of 980731.Petitions on Plant GT97494 & GT97339 for Which DD Became Final Actions During Month Were Closed. Portion of Encl Withheld ML20237A0011998-08-0707 August 1998 Informs That Extension Granted on Envirocare Decision of 980904.Two Week Extension on Philadelphia VA Decision of 980828 Requested.Submits Concurrence of Changes.Rept on 2.206 July Status for Plants Encl ML20248L8621998-06-0909 June 1998 Forwards May 1998 Rept on Status of Public Petitioners Under 10CFR2.206.Petition on Seabrook (GT970873) for Which DD 98- 03 Became Final Agency Decision on 980413 Closed.Attachment 3 Withheld ML20247M2191998-05-19019 May 1998 Notification of 980604 Meeting W/Gpu Nuclear Inc in Royalton,Pa to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20216B6871998-05-0808 May 1998 Notification of 980527 Meeting W/Representative of Gpu Nuclear,Inc in Rockville,Md to Discuss Licensee 980324 Submittal Re Control Room Habitability at TMI-1 ML20203M6681998-02-23023 February 1998 Forwards SER Re TR CENPD-199-P,Rev 1-P-A,Suppl 2-P, CE Setpoint Methodology Proposing CRGR Review Be Waived IAW Suggested Procedures in 890929 Memo IA-98-345, Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 11998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 ML20154B7931998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 IA-97-461, Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted1997-11-25025 November 1997 Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted ML20202E0141997-11-25025 November 1997 Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted ML20199H6701997-11-20020 November 1997 Notifies of 971212 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability at Unit 1 ML20199E7071997-11-14014 November 1997 Revised Notification of 971119 Meeting W/Gpu Nuclear Corp,In Rockville,Md to Discuss Control Room Habitability at TMI-1 Nuclear Facility.Meeting Cancelled Until Further Notice ML20199B3111997-11-0606 November 1997 Notifies of 971119 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability ML20212G9531997-11-0505 November 1997 Forwards Gpu SE Re Review of AP600 Shutdowm Ts.Section B.3.9.4 of STS Cites Gpu Nuclear SE 0002000-001 Rev 0,880520 as Ref E Temporary Containment Penetration Closure Devices Equivalent to Valve or Blind Flange ML20216E9871997-09-0808 September 1997 Notification of 970910 Meeting W/Util in Rockville,Md to Discuss Potential Dose Consequences from Postulated Steam Line Break & Postulated Accident Sys Leakage Limits ML20205D4281997-08-15015 August 1997 Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump IA-99-106, Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump1997-08-15015 August 1997 Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump ML20205M3331997-07-28028 July 1997 Provides Final Agenda for Region II Enforcement Meeting to Be Held on 970730.OI Attendance Requested for Issue Involving Termination of Turkey Point Radwaste Operator Who Failed to Follow Procedure IR 05000335/19970051997-07-17017 July 1997 Forwards Allegation Evaluation Rept & NRC Insp Repts 50-335/97-05 & 50-389/97-05 Re RII-97-A-0116 ML20149D8881997-07-11011 July 1997 Notification of Significant Licensee Meeting 97-86 W/Util on 970725 in King of Prussia,Pa to Discuss Apparent Violations Re Failure to Recognize General Emergency Condition During 970305 Exercise ML20140G6231997-06-0505 June 1997 Notification of 970716 Meeting W/Gpun in King of Prussia, Pennsylvania for Presentation & Discussion Re Root Cause Determination for Recent QC Issues Performed by Gpun Per NRC CAL IR 05000289/19962011997-05-23023 May 1997 Discusses Review of Two Addl Concerns Identified in 970407 Memo to Recipient from Special Insp Branch Re Addl Open Items Associated W/Dec 1996 Design Insp Rept 50-289/96-201 ML20148D9851997-05-21021 May 1997 Notification of Significant Licensee Meeting 97-57 W/Util on 970528 to Discuss Formal Exit Meeting for Licensee Remedial Emergency Preparedness Exercise on 970513 & Licensee Discussion Re NRC CAL ML20141E5381997-05-15015 May 1997 Notification of 970530 Meeting W/Representatives of Gpu Nuclear Corp in Rockville,Md to Discuss Status of Licensing Activities Associated W/Plant,Unit 1 ML20202E0261997-04-23023 April 1997 Discusses Technical Staff Actions Associated W/Three Concerns in Allegation RII-96-A-0251 ML20138D3161997-04-21021 April 1997 Notification of Significant Licensee Meeting 97-47 W/Util on 970430 to Discuss Root Cause Analysis of 970305 Emergency Preparedness Drill Weaknesses 1999-09-29
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217C5311999-10-0808 October 1999 Notification of 991027 Meeting with Representatives of Gpu in Rockville,Md to Discuss Recent Control Rod Surveillance Performance Issues at TMI-1.Proprietary Portions of Meeting Will Be Closed to Public ML20217F0841999-10-0808 October 1999 Informs That During 466th Meeting of ACRS on 990930-1002, CEOG Proposal to Eliminate PASS from Plant Design & Licensing Bases for CEOG Plants,Were Reviewed.Discussion & Recommendations,Listed ML20212K8901999-10-0505 October 1999 Notification of 991027 Meeting with Util in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TM1-1 ML20216J0151999-09-29029 September 1999 Notification of 991020 Meeting in Forked River,Nj to Discuss Licensee 990922,response to NRC & Other Info Addressing Sale of Portion of Land That Is Part of Plant Site ML20216G3671999-09-10010 September 1999 Forwards CNWRA Program Manager Periodic Rept (Pmpr) for Period 990731-0827 ML20210U7571999-08-20020 August 1999 Forwards Info Received from Gpu Nuclear,Inc on 990820 in Preparation for 990823.Requests Info Be Docketed ML20210C9991999-07-22022 July 1999 Revised Notification of 990813 Meeting with Gpu Nuclear,Inc Rockville,Maryland to Discuss TMI-1 Licensing Action Status. Meeting Date Changed ML20210E9511999-07-12012 July 1999 Notification of 990805 Meeting with Representative of Gpu Nuclear,Inc in Rockville,Md Re Plant,Unit 1 Licensing Action Status ML20212H9621999-06-23023 June 1999 Revised Notification of Meeting with Gpu Nuclear,Inc to Discuss Proposed Mods to RBS Sys Procedures & HPI Cross Connect Lineup.Meeting Rescheduled to 10 A.M. on 990713 ML20195H8521999-06-18018 June 1999 Requests That Encl Questions,Faxed to Gpu Nuclear,Inc on 990616,be Docketed,In Preparation for Forthcoming Conference Call Re TS Change Request 248, Remote Shutdown Sys, ML20195H9911999-06-15015 June 1999 Notification of 990707 Meeting with Util to Discuss Licensee Proposed Mods to Reactor Bldg Spray Procedures & High Pressure Injection Cross Connection Lineup ML20206F2921999-05-0505 May 1999 Forwards Draft Questions Which Were Faxed to Licensee for TMI Unit 1,GPUN on 990505 in Preparation for 990506 Conference Call on TS Change Request 279 ML20206D1291999-04-28028 April 1999 Notification of 990507 Meeting with Gpu Nuclear,Inc in Rockville,Maryland to Discuss Three Mile Island,Unit 1 Licensing Action Status ML20205N3161999-04-0909 April 1999 Notification of Significant Licensee Meeting 99-19 with Util on 990423 to Discuss Emergency Feedwater Flow Discrepancies ML20207L5671999-03-12012 March 1999 Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam for Test Administered on 981130,1204-14 & 18 ML20207E6091999-03-0303 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980622-26 ML20203E0321999-02-11011 February 1999 Staff Requirements Memo Re 990211 Affirmation Session in Rockville,Md (Open to Public Attendance) Re Secys 99-044 & 99-045 ML20197G6381998-12-0707 December 1998 Forwards Program Manager Period Rept (Pmpr) for Period 981024-1120 ML20196E2801998-11-30030 November 1998 Discusses Closeout of TAC MA1607 Re Cross Potential for common-cause High Pressure Injection Pump Failure IR 05000289/19983011998-11-0404 November 1998 Forwards NRC Operator Licensing Exam Rept 50-289/98-301 with as Given Written Exam for Tests Administered on 980824-27 at Facility ML20154G3451998-10-0101 October 1998 Rev 2 to Notification of Significant Licensee Meeting 97-73 on 981023 in King of Prussia,Pa to Discuss Actions Taken Re Engineering Corrective Action Performance Assessment Team Findings ML20153D9681998-09-24024 September 1998 Notification of 981006 Meeting W/Gpu Nuclear,Inc in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20237E8381998-08-28028 August 1998 Notification of 980917 Meeting W/Gpu Nuclear,Inc & Amergen in Rockville,Md to Discuss Sale & Transfer of TMI-1 from Gpu Nuclear,Inc to Amergen ML20237E4591998-08-20020 August 1998 Submits Rev 1 to Notification of Significant Licensee Meeting 98-73 W/Util in Middletown,Pa to Discuss Actions Taken Re Engineering Corrective Action PA Team Findings. Meeting Postponed ML20237C9401998-08-14014 August 1998 Notification of Significant Licensee Meeting 98-73 on 980828 W/Gpu Nuclear,Inc in Middletown,Pa to Discuss Actions Taken Re Engineering C/A Performance Assessment Team Findings ML20236Y6301998-08-0808 August 1998 Forwards Monthly Rept Reflecting Status of 10CFR2.206 Petitions as of 980731.Petitions on Plant GT97494 & GT97339 for Which DD Became Final Actions During Month Were Closed. Portion of Encl Withheld ML20237A0011998-08-0707 August 1998 Informs That Extension Granted on Envirocare Decision of 980904.Two Week Extension on Philadelphia VA Decision of 980828 Requested.Submits Concurrence of Changes.Rept on 2.206 July Status for Plants Encl ML20248L8621998-06-0909 June 1998 Forwards May 1998 Rept on Status of Public Petitioners Under 10CFR2.206.Petition on Seabrook (GT970873) for Which DD 98- 03 Became Final Agency Decision on 980413 Closed.Attachment 3 Withheld ML20248H7001998-05-20020 May 1998 Staff Requirements Memo Re SECY-98-071,exemption to 10CFR72.102(f)(1) Seismic Design Requirement for TMI-2 ISFSI ML20247M2191998-05-19019 May 1998 Notification of 980604 Meeting W/Gpu Nuclear Inc in Royalton,Pa to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20216B6871998-05-0808 May 1998 Notification of 980527 Meeting W/Representative of Gpu Nuclear,Inc in Rockville,Md to Discuss Licensee 980324 Submittal Re Control Room Habitability at TMI-1 ML20203M6681998-02-23023 February 1998 Forwards SER Re TR CENPD-199-P,Rev 1-P-A,Suppl 2-P, CE Setpoint Methodology Proposing CRGR Review Be Waived IAW Suggested Procedures in 890929 Memo IA-98-345, Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 11998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 ML20154B7931998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 IA-97-461, Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted1997-11-25025 November 1997 Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted ML20202E0141997-11-25025 November 1997 Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted ML20199H6701997-11-20020 November 1997 Notifies of 971212 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability at Unit 1 ML20199E7071997-11-14014 November 1997 Revised Notification of 971119 Meeting W/Gpu Nuclear Corp,In Rockville,Md to Discuss Control Room Habitability at TMI-1 Nuclear Facility.Meeting Cancelled Until Further Notice ML20199B3111997-11-0606 November 1997 Notifies of 971119 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability ML20212G9531997-11-0505 November 1997 Forwards Gpu SE Re Review of AP600 Shutdowm Ts.Section B.3.9.4 of STS Cites Gpu Nuclear SE 0002000-001 Rev 0,880520 as Ref E Temporary Containment Penetration Closure Devices Equivalent to Valve or Blind Flange ML20216E9871997-09-0808 September 1997 Notification of 970910 Meeting W/Util in Rockville,Md to Discuss Potential Dose Consequences from Postulated Steam Line Break & Postulated Accident Sys Leakage Limits IA-99-106, Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump1997-08-15015 August 1997 Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump ML20205D4281997-08-15015 August 1997 Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump ML20205M3331997-07-28028 July 1997 Provides Final Agenda for Region II Enforcement Meeting to Be Held on 970730.OI Attendance Requested for Issue Involving Termination of Turkey Point Radwaste Operator Who Failed to Follow Procedure IR 05000335/19970051997-07-17017 July 1997 Forwards Allegation Evaluation Rept & NRC Insp Repts 50-335/97-05 & 50-389/97-05 Re RII-97-A-0116 ML20149D8881997-07-11011 July 1997 Notification of Significant Licensee Meeting 97-86 W/Util on 970725 in King of Prussia,Pa to Discuss Apparent Violations Re Failure to Recognize General Emergency Condition During 970305 Exercise ML20140G6231997-06-0505 June 1997 Notification of 970716 Meeting W/Gpun in King of Prussia, Pennsylvania for Presentation & Discussion Re Root Cause Determination for Recent QC Issues Performed by Gpun Per NRC CAL IR 05000289/19962011997-05-23023 May 1997 Discusses Review of Two Addl Concerns Identified in 970407 Memo to Recipient from Special Insp Branch Re Addl Open Items Associated W/Dec 1996 Design Insp Rept 50-289/96-201 ML20148D9851997-05-21021 May 1997 Notification of Significant Licensee Meeting 97-57 W/Util on 970528 to Discuss Formal Exit Meeting for Licensee Remedial Emergency Preparedness Exercise on 970513 & Licensee Discussion Re NRC CAL ML20141E5381997-05-15015 May 1997 Notification of 970530 Meeting W/Representatives of Gpu Nuclear Corp in Rockville,Md to Discuss Status of Licensing Activities Associated W/Plant,Unit 1 1999-09-29
[Table view] |
Text
'Ci
~
z.
d From:.
Mark Miller'/ O_/,.
To:
CAJ C T OisA N, ( $ 1 Date:
10/31/96 6:31am
Subject:
Welcome to St. Lucie Kerry informed me that you were the boss for a while. Here's a schedule for activities at St. Lucie for the next few months. I update this calendar waekly and I'll be copying you on it as we go. Particular points of interest...
I'll be on leave next week. That coincides with the SSFI bagma.n trip and Fred Wright's inspection. If this is a problem, let me know.
I'll be on leave for a couple of weeks at the Christmas holiday.
Joel will be rotating to NRR in January for two months. We need to find someone to act for him. Steve Sandin (AEOD), who has spent a lot of time here and who's a very good
' inspector, has indicated that he may be able to pick up a month of it, but we may need you to talk to his boss.
Talk to you later CC:
KDL l
9703130170 970306 PDR FOIA BINDER 96-485
_PDR
f 3
Sunday Monday Tuesday Wednesday Thursday 1
2 3
9 6
7 8
9 10
,y
- York /Repp 13 14 15 16 17 DIR DRP
,y pp YorWRapp
20 21 22 23 24
- Sandin Here Joel/ Dave at TTC
- Joel/ Dave at TTC Sandin Here Joel/ Dave at TTC
- RA Breif for SMM 27 28 29 30 31
- Sa in Here a JoeVDave at TTC "C'
]
9 4
9
i j
i
.l s
Sunday Monday
-Tuesday Wednesday Thursday i
)
1 3
4 5
6 7
- SSFl Bagman a SSFl Bagman
a Mark on Leave
- Sand n Here JoeVDave at TTC
)
10 11 12 13 14
^
- News Conf 17 18 19 20 21,
j j
- Joel at McGuire a Joel at McGure a Joel at McGure
. Joet on Leave l
i e
0 4
l 5
1 Sunday Monday Tuesday ~
Wednesday Thursday 1
2 3
4 5
. Hopper e Joelin DC tranng
E
, 33pg
10 11 12
,337,
,337,
- Joel on Leeve a Joel on Leave
22 23 24 25 26
d 29 30 31
a
f 5
m-=
Sunday Monday Tuesday Wednesday Thursday 1
2 e
6 7
8 9
- SSFl 12 13 14 15 16 19 20 21 22 23
- Joel on Rotstxm (planned)
- Joel on Rotabon (planned)
- Joel on Rotaten (planned)
- Joel on Rotabon (planned) 26 27.
28 29 30
- Joet on Rotabon (pienned)
Joet on RotatKm (planned)
- Joel on Rotabon (planned)
- Joel on Rotaten (planned) i 4
6 9
e e
e 8
4 b
0
4 Sunday Monday Tuesday Wednesday Thursday I
2 3
4 5
6
- Joel on Rotshon (pionned)
- Joel on Rotshon (planned)
- Jeol on Rotabon (planned)
- Joel on Rotaban (pienned) 9 10 11 12 13 4
- Joel on Rotaban (planned)
- Joel on Rotabon (planned)
- Joel on Rotabon (planned)
- Joel on Rotabon (planned) d 1
16 17 18 19 20
- Joel on Rotabon (planned)
- Joel on Rotebon (planned)
- Joel on Rotabon (planned)
- Joel on Rotabon (planned) 4 23 24 25 26 27
- Joel on Rotabon (planned)
- Joel on Rotebon (planned)
- Joet on Rotabon (planned)
- Joet on Rotabon (planned) 4 i
i e
i
a.
~
r j
- sund.y -
m 4.y Tu 4.y w.en 4.y Th - d.y i
i h
2 3
4 5
6
- Joel on Rolston (planned)
- Joel on Rotetson (pionned)
- Joel on Rohshon (pionned)
- Joel on Rotebon (ptonned)
.i 9
10 11 12 13
- Joel on Rotelen (pionned)
- Jost on Rotshon (pionned)
- Joel on Rotshon (pienned)
- Joel on Rotelen (pionned) t 16 17 18 19 20 23 24 25 26 27 5
M i
!~
a-l-
30 31 4
0 4
4
't e
0 -
e 4
1 c
a
~
WEEKLY BRANCH CHIEF STATUS REPORT'
]
BRANCH'3 SIGNA.TURE Kerry D'. Landis DATE 10/31/96 PLANT ISSUES / EVENTS:
a)-
St Lucie - Units' 1 and'2 operated at 100%.for the entire week.
i b).
Turkey. Point Both units operated at 100% for the entire week.. Unit 4 completed its
.poweruprateffrom.2200to2300MWthon10/30.
..c)
Crystal River - FPC plans to remain shutdown for the remainder of the year to restore i
greater design margin in some systems and submit the necessary license amendments. -The
.pending ' license amendment is to resolve several US0s on EDG loading and EFW.
susceptibility to single failure.
?
Emergency Preparedness Exercise was conducted on 10/16/96. No major deficiencies were
. identi fied.
~ SIGNIFICANT INSPECTION FINDINGS / INITIATIVES:
a)
. Crystal River - Failure to perform an adequate 10 CFR 50.59 evaluation 6n diesel generator loading following a modification to remove the automatic start of the turbine i
driven auxiliary feedwater pump.
]
b)
Crystal River - EFW susceptibility to single failure: during LOOP a failure of one fuse could cause an EFW flow control valve to fail open allowing one EFW pump to go.to
- runout, Since both EFW pumps draw suction through the same pipe, the resulting flowrate would cause cavitation and failure of both EFW pumps.
c)
St Luc'ie/ Turkey Point - A vulnerability was identified in the safeguards procesC for FPL where the access authorization was not immediately removed for individuals whose
-employment was terminated. One individual after employment termination reentered the
. site approximately five times for a total of 15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br />.
d)
St Lucie - The EP inspection identified potential multiple violations. The violations were in the areas of' timely activation of response facilities. training'of respons'e personnel and corrective actions for 1995 Hurricane Erin critique items.
NRC PERSONNEL' ISSUES / STATUS a)
Credit Hours authorized: None b)-
-Jose Rey'es was selected as the Turkey Point'RI.
)
C)-
Ross Butcher. the Crystal River SRI. will retire from.NRC as effective of November 1.
1 1996; i
ISSUES / ACTIVITIES EXPECTED NEXT WEEKi l
St'Lucie> - NRR A\\E Exoanded SSFI. Team Site Visit
- Radiological Protection Inspection LTurkey Point 3 Maintenance andLtest of Safs Shutdown Panels Inspection
\\y i
kp i
w
}V
r 9
d.
. WEEKLY BRANCH CHIEF STATUS REPORT BRANCH 3-SIGNATURE Kerry D. Landis' _
DATE 10/10/96
. PLANT ISSUES / EVENTS:
- a).
.St Lucie - Both units,are operating at 100%.
~
b)
Turkey Point - Both units are operating at 100%.
Unit 4 had a ~ feed water heater. relief lift prematurely due' to a :know design' flaw.
The spring is susceptible to hydrogen embrittlement.. The relief valve was like kind replaced with the unit at 77% power.
This problem does not effect Unit 3.. Unit-4 will be taken off line in about a-week to replace the springs on all 8 of the effected relief valves.
Unit 3 and ~4 received the license amendment allowing thermal uprate of approximately 5% power.
Unit 3 is performing all the equipment calibrations to support the upr. ate with plans to next week actually raise power to the new 2300 Megawatts thermal.
Unit L3 and 4 reported a procedural error which 'would have allowed a potential uncoiltrollable radiological rel. ease to the environment.(see the attached 50 72).
c)
Crystal River - The unit remains shutdown pending a license amendment to resolve several US0s on EDG loading and Emergency Feedwater (EFW) susceptibility to single failure.
FPC plans to submit a remain shutdown for another two months or more to resolve the design issues and submit the necessary license amendments (see attached PN).
An " unusual event" was declared on October 7. 1996, at 8:49 a.m. because
'of a hurricane warning. issued by the State of Florida. At approximately 11:00 p.m. on October 7.1996. the National Hurricane Center lifted the hurricane warning for the Crystal River area. At that time the licensee exited the Unusual Event (see the attached PNs).
The investigation by the' licensee into the apparent tampering event -
associated with the "A"
EDG was completed on 10/03/96.
The licensee
. concluded that poor work practices caused-strairier blockage and has secured from the security alert.
Billy Crowley revie.ved the report on 10/7/96 and exited with the--licensee on 10/9/96.
SIGNIFICANT INSPECTION FINDINGS / INITIATIVES:
a)
Crystal River:- Failure to perform an adequate 10 CFR 50.59' evaluation on
' diesel generator loading following a modification to remove the. automatic start of:the turbine driven auxiliary feedwater pump.
b)
Crystal River Emergency ~' Feedwater (EFW)- susceptibility to single
. failure during LOOP a. failure of one fuse could cause.an EFW flow control.
valve'to fail open allowing one EFW pump to go to runout. Since both EFW pumps draw suction; through the same pipe, the' resulting flowrate.would cause cavitation and failure.of both EFW<pupps.
-y t