MONTHYEARML20207L5671999-03-12012 March 1999 Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam for Test Administered on 981130,1204-14 & 18 ML20207E6091999-03-0303 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980622-26 ML20236Y6301998-08-0808 August 1998 Forwards Monthly Rept Reflecting Status of 10CFR2.206 Petitions as of 980731.Petitions on Plant GT97494 & GT97339 for Which DD Became Final Actions During Month Were Closed. Portion of Encl Withheld ML20237A0011998-08-0707 August 1998 Informs That Extension Granted on Envirocare Decision of 980904.Two Week Extension on Philadelphia VA Decision of 980828 Requested.Submits Concurrence of Changes.Rept on 2.206 July Status for Plants Encl ML20248L8621998-06-0909 June 1998 Forwards May 1998 Rept on Status of Public Petitioners Under 10CFR2.206.Petition on Seabrook (GT970873) for Which DD 98- 03 Became Final Agency Decision on 980413 Closed.Attachment 3 Withheld ML20203M6681998-02-23023 February 1998 Forwards SER Re TR CENPD-199-P,Rev 1-P-A,Suppl 2-P, CE Setpoint Methodology Proposing CRGR Review Be Waived IAW Suggested Procedures in 890929 Memo ML20202E0141997-11-25025 November 1997 Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted IA-97-461, Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted1997-11-25025 November 1997 Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted ML20205D4281997-08-15015 August 1997 Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump IA-99-106, Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump1997-08-15015 August 1997 Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump ML20205M3331997-07-28028 July 1997 Provides Final Agenda for Region II Enforcement Meeting to Be Held on 970730.OI Attendance Requested for Issue Involving Termination of Turkey Point Radwaste Operator Who Failed to Follow Procedure IR 05000335/19970051997-07-17017 July 1997 Forwards Allegation Evaluation Rept & NRC Insp Repts 50-335/97-05 & 50-389/97-05 Re RII-97-A-0116 ML20202E0261997-04-23023 April 1997 Discusses Technical Staff Actions Associated W/Three Concerns in Allegation RII-96-A-0251 ML20137L2971997-03-31031 March 1997 Forwards Matrix Containing Answer to Listed Questions in ,Rev 1 ML20137R8831997-03-27027 March 1997 Provides Info Requested by 960208 Memo from J Stolz Re Review of Spent Fuel Pool Practices & Current Licensing Basis ML20137L0981997-03-25025 March 1997 Forwards Summary of Changes Made to Safeguards Review Rept, Rev 37 to St Lucie Physical Security Plan,Case Control Number N5S63VA50033593.W/o Encl ML20137L2311997-03-25025 March 1997 Forwards Summary of Changes Made to Safeguards Review Rept, Rev 47 to St Lucie Physical Security Plan,Case Control Number N5S76VA50033596.W/o Encl ML20136E9261997-03-0606 March 1997 Forwards SALP Input Feeder Info at St Lucie Facility from 940102-960106 & Requests That Technical Staff Complete Review by 951222 ML20136A9241997-02-28028 February 1997 Partially Withheld Memo Discussing drop-in Visit of J Broadhead,Chairman & CEO FPL Group & Chairman & CEO FP&L Co & J Goldberg ML20137L2751996-12-16016 December 1996 Requests Guidance in Addressing Issues Re Use of Temporary Fire Pump W/O Evaluation & Construction of Enclosure for Control Rod Drive Electronic Equipment within Cable Spreading Room,W/O Appropriate Evaluation ML20136A6751996-12-0909 December 1996 Partially Withheld Memo Discussing Directors Decision 96-19 Under 10CFR2.206 Re Steam Generator Issued at St Lucie ML20137R5381996-11-22022 November 1996 Informs That Rept IR 94-008 for St Lucie Opens Item 94-008-02-URI Quality Level of PORV & SRV Discharge Piping ML20136E6991996-11-19019 November 1996 Requests Info Re Sheron St Lucie Visit.Info Requested by 961120 ML20136E6221996-11-19019 November 1996 Informs That Draft in on Operator Activities Affecting Reactivity Being Distributed ML20136E6881996-11-18018 November 1996 Forwards Background Info on St Lucie Nuclear Instumentation Insp ML20136E6791996-11-18018 November 1996 Forwards Background Info on St Lucie Nuclear Instrumentation Insp ML20136E6081996-11-15015 November 1996 Provides List of Corrective Actions That Have Been Rolled Into Speakout Program ML20136E5461996-11-14014 November 1996 Forwards File Submitted to Kerry on 961024 Re PIM-like Summary of Events from 92-93 ML20136E4911996-11-13013 November 1996 Forwards Updated Schedule for St Lucie FY1 ML20140E5361996-11-12012 November 1996 Forwards Plant EA Worksheet ML20138G4131996-11-12012 November 1996 Requests Technical assistance,TIA-019,re Discrepancies Between Containment Radiation Monitoring Sys Described in Usfar & Regulatory Guide 1.45 at Plants ML20140E6591996-11-12012 November 1996 Provides Revs of Plant Violations for Current Hour ML20140E5301996-11-0808 November 1996 Forwards Input Received from Dan & Revised EA Worksheet from Incorporating Input.Few Slight Revs Were Made to Notice of Violation ML20140E6521996-11-0707 November 1996 Informs That D Barss Will Be e-mailing Input on Items 5 & 6 for Incorporation Into EA Worksheet ML20140E6201996-11-0707 November 1996 Provides Two Violations That Are Subjects of EA Worksheet ML20137R9031996-11-0606 November 1996 Requests That Info Re St Lucie Be Mailed to Author.Info May Be Found in Plan of Day Handout,Provided by Residents ML20140E5941996-11-0606 November 1996 Informs That Plant Violations 1 & 2 Re Emergency Prepardness Program Insp,Being Looked at for Escalated Enforcement.Feedback Requested ML20137Y5401996-11-0505 November 1996 Forwards Info on Two Issues to Be Discussed W/Panel at Meeting Scheduled for 961106.Partially Deleted ML20138G3651996-11-0505 November 1996 Requests That Listed Info Be Forwarded to Licensee in Connection W/Unescorted Access Visits to Plant by Listed NRC Contractor Employees During 961118-970110 for Purpose of Assisting NRC in Conduct of Design Insp.Partially Deleted ML20136E3011996-10-31031 October 1996 Forwards Schedule for Activities at Plant for Next Few Months ML20136E3961996-10-31031 October 1996 Informs That Violation Withdrawn Re Licensee Use of Ccw/Icw (Svc Water) in Mode 5 at Plant ML20136E4691996-10-31031 October 1996 Discusses Criticality Monitoring Ltr & Requests Response to Listed Question ML20140E5801996-10-29029 October 1996 Discusses EA Worksheet on Plant Re Wiring Error Affecting Nuclear Instrumentation ML20140E5191996-10-29029 October 1996 Discusses Addl Info for Plant Panel,Just Received from Inspector ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20140E5241996-10-29029 October 1996 Forwards Wordperfect Version as Requested ML20140E5901996-10-29029 October 1996 Forwards Enforcement Action Worksheet ML20136E5641996-10-28028 October 1996 Replies to News Summary Re Escalated Enforcement for Plant on 961025 IR 05000335/19950151996-10-28028 October 1996 Forwards Draft Insp Repts 50-335/95-15 & 50-389/95-15 on 960907-1012 ML20136E5791996-10-28028 October 1996 Discusses Plant Ni Eaw 1999-03-03
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20207L5671999-03-12012 March 1999 Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam for Test Administered on 981130,1204-14 & 18 ML20207E6091999-03-0303 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980622-26 ML20236Y6301998-08-0808 August 1998 Forwards Monthly Rept Reflecting Status of 10CFR2.206 Petitions as of 980731.Petitions on Plant GT97494 & GT97339 for Which DD Became Final Actions During Month Were Closed. Portion of Encl Withheld ML20237A0011998-08-0707 August 1998 Informs That Extension Granted on Envirocare Decision of 980904.Two Week Extension on Philadelphia VA Decision of 980828 Requested.Submits Concurrence of Changes.Rept on 2.206 July Status for Plants Encl ML20248L8621998-06-0909 June 1998 Forwards May 1998 Rept on Status of Public Petitioners Under 10CFR2.206.Petition on Seabrook (GT970873) for Which DD 98- 03 Became Final Agency Decision on 980413 Closed.Attachment 3 Withheld ML20203M6681998-02-23023 February 1998 Forwards SER Re TR CENPD-199-P,Rev 1-P-A,Suppl 2-P, CE Setpoint Methodology Proposing CRGR Review Be Waived IAW Suggested Procedures in 890929 Memo ML20202E0141997-11-25025 November 1997 Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted IA-97-461, Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted1997-11-25025 November 1997 Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted ML20205D4281997-08-15015 August 1997 Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump IA-99-106, Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump1997-08-15015 August 1997 Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump ML20205M3331997-07-28028 July 1997 Provides Final Agenda for Region II Enforcement Meeting to Be Held on 970730.OI Attendance Requested for Issue Involving Termination of Turkey Point Radwaste Operator Who Failed to Follow Procedure IR 05000335/19970051997-07-17017 July 1997 Forwards Allegation Evaluation Rept & NRC Insp Repts 50-335/97-05 & 50-389/97-05 Re RII-97-A-0116 ML20202E0261997-04-23023 April 1997 Discusses Technical Staff Actions Associated W/Three Concerns in Allegation RII-96-A-0251 ML20137L2971997-03-31031 March 1997 Forwards Matrix Containing Answer to Listed Questions in ,Rev 1 ML20137R8831997-03-27027 March 1997 Provides Info Requested by 960208 Memo from J Stolz Re Review of Spent Fuel Pool Practices & Current Licensing Basis ML20137L0981997-03-25025 March 1997 Forwards Summary of Changes Made to Safeguards Review Rept, Rev 37 to St Lucie Physical Security Plan,Case Control Number N5S63VA50033593.W/o Encl ML20137L2311997-03-25025 March 1997 Forwards Summary of Changes Made to Safeguards Review Rept, Rev 47 to St Lucie Physical Security Plan,Case Control Number N5S76VA50033596.W/o Encl ML20136E9261997-03-0606 March 1997 Forwards SALP Input Feeder Info at St Lucie Facility from 940102-960106 & Requests That Technical Staff Complete Review by 951222 ML20136A9241997-02-28028 February 1997 Partially Withheld Memo Discussing drop-in Visit of J Broadhead,Chairman & CEO FPL Group & Chairman & CEO FP&L Co & J Goldberg ML20137L2751996-12-16016 December 1996 Requests Guidance in Addressing Issues Re Use of Temporary Fire Pump W/O Evaluation & Construction of Enclosure for Control Rod Drive Electronic Equipment within Cable Spreading Room,W/O Appropriate Evaluation ML20136A6751996-12-0909 December 1996 Partially Withheld Memo Discussing Directors Decision 96-19 Under 10CFR2.206 Re Steam Generator Issued at St Lucie ML20137R5381996-11-22022 November 1996 Informs That Rept IR 94-008 for St Lucie Opens Item 94-008-02-URI Quality Level of PORV & SRV Discharge Piping ML20136E6991996-11-19019 November 1996 Requests Info Re Sheron St Lucie Visit.Info Requested by 961120 ML20136E6221996-11-19019 November 1996 Informs That Draft in on Operator Activities Affecting Reactivity Being Distributed ML20136E6881996-11-18018 November 1996 Forwards Background Info on St Lucie Nuclear Instumentation Insp ML20136E6791996-11-18018 November 1996 Forwards Background Info on St Lucie Nuclear Instrumentation Insp ML20136E6081996-11-15015 November 1996 Provides List of Corrective Actions That Have Been Rolled Into Speakout Program ML20136E5461996-11-14014 November 1996 Forwards File Submitted to Kerry on 961024 Re PIM-like Summary of Events from 92-93 ML20136E4911996-11-13013 November 1996 Forwards Updated Schedule for St Lucie FY1 ML20140E5361996-11-12012 November 1996 Forwards Plant EA Worksheet ML20138G4131996-11-12012 November 1996 Requests Technical assistance,TIA-019,re Discrepancies Between Containment Radiation Monitoring Sys Described in Usfar & Regulatory Guide 1.45 at Plants ML20140E6591996-11-12012 November 1996 Provides Revs of Plant Violations for Current Hour ML20140E5301996-11-0808 November 1996 Forwards Input Received from Dan & Revised EA Worksheet from Incorporating Input.Few Slight Revs Were Made to Notice of Violation ML20140E6521996-11-0707 November 1996 Informs That D Barss Will Be e-mailing Input on Items 5 & 6 for Incorporation Into EA Worksheet ML20140E6201996-11-0707 November 1996 Provides Two Violations That Are Subjects of EA Worksheet ML20137R9031996-11-0606 November 1996 Requests That Info Re St Lucie Be Mailed to Author.Info May Be Found in Plan of Day Handout,Provided by Residents ML20140E5941996-11-0606 November 1996 Informs That Plant Violations 1 & 2 Re Emergency Prepardness Program Insp,Being Looked at for Escalated Enforcement.Feedback Requested ML20137Y5401996-11-0505 November 1996 Forwards Info on Two Issues to Be Discussed W/Panel at Meeting Scheduled for 961106.Partially Deleted ML20138G3651996-11-0505 November 1996 Requests That Listed Info Be Forwarded to Licensee in Connection W/Unescorted Access Visits to Plant by Listed NRC Contractor Employees During 961118-970110 for Purpose of Assisting NRC in Conduct of Design Insp.Partially Deleted ML20136E3011996-10-31031 October 1996 Forwards Schedule for Activities at Plant for Next Few Months ML20136E3961996-10-31031 October 1996 Informs That Violation Withdrawn Re Licensee Use of Ccw/Icw (Svc Water) in Mode 5 at Plant ML20136E4691996-10-31031 October 1996 Discusses Criticality Monitoring Ltr & Requests Response to Listed Question ML20140E5801996-10-29029 October 1996 Discusses EA Worksheet on Plant Re Wiring Error Affecting Nuclear Instrumentation ML20140E5191996-10-29029 October 1996 Discusses Addl Info for Plant Panel,Just Received from Inspector ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20140E5241996-10-29029 October 1996 Forwards Wordperfect Version as Requested ML20140E5901996-10-29029 October 1996 Forwards Enforcement Action Worksheet ML20136E5641996-10-28028 October 1996 Replies to News Summary Re Escalated Enforcement for Plant on 961025 IR 05000335/19950151996-10-28028 October 1996 Forwards Draft Insp Repts 50-335/95-15 & 50-389/95-15 on 960907-1012 ML20136E5791996-10-28028 October 1996 Discusses Plant Ni Eaw 1999-03-03
[Table view] |
Text
- - .. . . _ _ . . . - . . . -
. y' *
.t mar f..,# .
UNITED STATES NUCLEAR REGULATORY COMMISSION f _,, REGeoN 11 101 MARIETTA STREET, N.W.. SUITE 2500
, O 8 . ATLANTA, GEORGIA 303234190 4,.....
4 i August 6, 1996 MEMORANDUM FOR: Oscar DeMiranda, Senior Allegation Coordinator i Enforcement and Investigation Coordination Staff FROM:- Kerry D. L'ndis, a Chief Reactor Projects Branch 3 Division of Reactor Projects
SUBJECT:
RII-96-A-0056 - PERSONNEL EXECUTED A SWITCHING ORDER AND MANIPULATED EQUIPMENT WITHOUT KNOWLEDGE OF CONTROL P.00M PERSONNEL The Division of Reactor Projects performed a review and independent inspection of this anonymous concern. Our inspection regarding this matter has been completed'and our findings'are documented in the enclosures to this -
memorandum. Enclosure 1.is the Allegation Evaluation Report which summarizes-the findings, and the inspection results are documented in Enclosure 2, NRC Inspection Report No. 50-335,389/96-09, paragraph M3.1.
Based on the information provided, we were not able to substantiate the
, allegation. No violations of regulatory requirements were identified.
This concludes the staff's activities regarding this matter. This allegation is considered closed. 'If you have any questions, please contact me.
Enclosures:
i: 1. Allegation Evaluation Report
- 2. Inspection Report No.
50-335,389/96-09 -
4
\
'9703130195 970306
?/li1 )w PDR- FOIA
~ /*: BINDER 96-485 PDR a g
P
- e. -
I' '
ENCLOSURE.1' ,
ALLEGATION EVALUATION REPORT y
. ALLEGATION RII-96-0056 -
t PERSONNEL EXECUTED A SWITCHING ORDER AND MANIPULATED EQUIPMENT WITHOUT KNOWLEDGE OF CONTROL ROOM PERSONNEL i ST LUCIE NUCLEAR PLANT ,
DOCKET NOS. 50-335 AND 50-389 CONCERN:
' Employees were improperly assigned a switching order during restart of unit 1
- on February 25, 1996. Non-operations personnel manipulated equipment such as
-inserted trip signals, closed fuses and racked in breakers. The switching
- j. order was not performed by bargaining unit personnel.
4 DISCUS $10N:
The inspector reviewed the licensee's procedures for the establishment and control of the interface between Operations and Transmission and Distribution personnel. The inspector reviewed the following procedures: ,
i e AP 0010532, revision 6, " Relay Work Orders" l e' Transmission and Distribution (T&D) Procedure 2650, " Interconnected i System - Division of Responsibility" l l
~
.The inspector found that the subject procedures established clear lines of !
demarkation between T&D and the onsite organization. With respect to AP l 0010532: 1 L
e Appropriate controls were established for relay work performed by
~ Protection and Control personnel through the Relay Work Order' process.
- The procedure required that the Assistant Nuclear Plant Supervisor for an affected unit be notified and that permission be received prior to the commencement of work.
~
e Controls over the use of vendor technical manuals were consistent with ,
, site practice. !
With respect to T&D procedure 2650:
e Lines'of responsibility.and authority were described Le Specific instructions were described for work involving nuclear plants, with requirements for ' communication with the NPS/ANPS specified. -
l y l l
s 1
e Additional instructions were included to accommodate reduced-inventory and mid-loop conditions.
The inspector discussed these controls with Operations personnel and found that, in general, the interface between Operations and T&D had been controlled appropriately. One example of a failure to communicate across organizational '
boundaries, involving relay work performed on a tagged-out component, was identified. The licensee stated that the issue was resolved through
. discussions and counseling.
CONCLUSION:
The inspector concluded, that, by the direction of the Nuclear Plant Supervisor, an employee had properly executed an assigned switching order during restart of unit 1 on February 25, 1996. The licensee had appropriately established controls between activities performed by site personnel and those conducted by T&D. Although the concern was not substantiated, there was one example of a failure to communicate across organizational boundaries, involving relay work performed on a tagged-out component, was identified. The licensee stated that the issue was resolved through discussions and counseling. No violations of regulatory requirements were identified. This :
allegation is considered closed.
l I
l I
i l
9 4
r .
.J 14 1 , y +f ' ggdf 15 (f
0 M3 Maintenance Procedures and Documentation M3.1 - Plant / Transmission and Distribution interface (62703)
- a. Scope The inspector reviewed the licensee's procedures for the establishment and control of the interface between Operations and Transmission'and Distribution personnel. The inspector reviewed the following procedures:
- AP 0010532. revision 6. " Relay Work Orders" '
- Transmission and Distribution (T&D) Procedure 2650,
" Interconnected System - Division of Responsibility" *
- b. Findings ,
The inspector found that tne suoject pr'ocedures establi.shed clear lines of demarkation between tid ano the onsite organization. With respect to AP 0010532:
. Appropriate controls were established for relay work performed by l Protection and Control personnel through the Relay Work Order process. -
- The procedure reauired that the'ANPS for an a'ffected unit be notified and that permission De received prior to the commencement of work.
. Controls over the use of vencer technical manuals were consistent i with site practice. !
With respect to tid proceoure 2650:
. Lines of responsibility and authority were described a Specific instructions were described for w'ork involving nuclear plants, with requirements for communication with the NPS/ANPS specified.
~
. Additional instructions were included to accommodate reduced--
inventory and mid-loco _conoit1ons. .
The inspector discussed these controis with Operations personnel and found that. in gener.al. the interface between Operations and T&D had been controlled appropriately. One example of a failure to communicate across organizational boundaries. involving relay work performed on a tagged-out component. was identified. The licensee stated that the issue was resolved throuan discussions and counseling.
4 9
9
-9 s, ,
16
- c. Conclusion The inspector concluded that the licensee had appropriately established controls between activities performed by site personnel and those conducted by T&D.
M8 Miscellaneous Maintenance Issues M8.1 Violation 335/95-15-03 Issues Revisited (627031 4
a .' Scope IR 96-04 closed violation 335/95-15-03, which was issued in response to operator failures to log /aive position deviations properly. The issue involved floor drain valves HCV-25-1/7. which were closed and not logged. The valves' closure complicated a loss of RCS inventory event on August 10. 1995, wnen wat.er :ssuing from an open relief valve collected in the Unit 1 pipe tunnel, rather.than draining through the floor drain system (see IR 95-20).
In closing the subject violation the inspector noted that the valves had been left closed after cifficulties encountered while stroking them in_ preparation for Hurricane Erin. The inspector reviewed the work packages generated in the repair of the valves'and reported that all work appeared to have been performed properly and that appropriate post-maintenance testing had been performed.
During the current inspection period, the inspector reviewed CR 96-1183, which was issued by the licensee s OA organization to document the fact that the subject valves may not have been properly tested after rework.
The issue involved the fact that the valves' actuators had been removed in support of correcting tne sticking conditions described above. QA indicated. in the CR. that proper post maintenance testing may not have been performed on the part of lit personnel (the inspector.'.s reviews, referred to-above, were of Mecnanical Maintenance activities).
Specifically, PWO 63/3836 required that'HCV-25-1 be retested using Appendix C-3 of QI 11-4 (which required a calibration of the valve), but no such record existed in the archived work package.
The CR referred to PWO 63/3836. which reported that valve HCV-25-1 was sticking in the open posit' ion. The inspector reviewed the subject PWO, as well as PW0s 63/2537 (which addressed repairing sticking on HCV-25-4) and 63/4171 (which directeo the replacement of the solenoid valve on
. HCV-25-4). The inspector found that the CR had correctly identified the fact that the retest specified in step 4 of.the subject PWO (valve calibration) had not been performed. Rather. records of a functional )
test (which. basically, cycl.ed the valve to verify proper operation) were included in the package. As corrective action, the licensee specified tha't the calibrations of HCV-25-li7 were to be completed satisfactorily (PWO 96011562. ano PMAI 96-070112). The inspector noted that AP 0010432, revision 84 (in affect at the time of_the work),
l
WEEKLY BRANCH CHIEF STATUS REPORT BRANCH 3 SIGNATURE Kerry D. Landis DATE ~8/15/96 PLANT ISSUES / EVENTS:
a) St Lucie - Both units are operating at 100%. There was an event involving tampering with key lock switches (see attached PN's).
b) Crystal River - The unit Lis operating at 100% , power. There were two unrelated security problems, one dealt with inadequate compensatory
. measures during modification work on the security system.. For approximately 44 hours5.092593e-4 days <br />0.0122 hours <br />7.275132e-5 weeks <br />1.6742e-5 months <br /> the licensee did not take appropriate compensatory measures. The other security issue dealt with loss of visitor control which was identified by the Resident Inspector.
On'8/13/96 there was an OSHA exit regarding personnel protection. There were.no immediate safety concerns, there was one apparent citation dealing with the personnel protection around moving machinery, the report will be issued shortly.
c) Turkey Point - Both units are operating at 100%. The licensee and customs officials used . drug sniffing dogs to conduct a thorough search of the controlled area of the plant. There was no contraband found. SALP period ends August 17. 1996. Johns Jaudon i's onsite August 15 for pre-SALP visit. The SALP Board meeting is scheduled for September.4. 1996.
SIGNIFICANT INSPECTION FINDINGS / INITIATIVES:
a) Crystal River - The H0 lead IPAP inspection report is due out before the 8/28/96 MCAP meeting onsite.
, b) The licensee discovered that St. Lucie unit 2 had misaligned PASS valves following routine sampling. During a review of the panel the Resident-Inspector discovered an additional mispositioned valve. The alignment was
" corrected and a Condition Report was initiated.
NRC PERSONNEL ISSUES / STATUS:
a) Son Ninh is being approved for transfer from NRR to RII as a project
- engineer for Branch 3 assigned to FPL.
b) Credit Hours authorized: None
.c) Edwin Lea ~one year rotation to Watts Bar will begin on October 14 1996.
fd) The Crystal River SRI selection is pending.
ISSUES / ACTIVITIES EXPECTED NEXT WEEK:
Crystal River -< 8/19/96EmpidyeeConcerns -
8/21/96 FPC_ Management meeting with NRR to discuss ISI issues.
. _St Lucie -- 8/19/96-Maintenance Inspection .
.s
.