|
---|
Category:NRC TECHNICAL REPORT
MONTHYEARML20136D8551996-08-31031 August 1996 Plant Status Rept ML20136D8921996-04-24024 April 1996 Morning Rept 2-96-0035:licensee Announced on 960417 That a Stall Will Join Util as Site Vice President at Plant Effective 960513 ML20136D9171996-04-17017 April 1996 Morning Rept 2-96-0031:licensee Announced That,Effective 960415,D Sager Was No Longer W/Util.B Acosta Was Named Acting Head of Nuclear Assurance ML20136C8391996-02-29029 February 1996 Plant Status Rept,Turkey Point ML20136C8001996-02-29029 February 1996 Plant Status Rept,St Lucie,Units 1 & 2 ML20136D6301996-02-28028 February 1996 Status Rept for St Lucie,Units 1 & 2 ML20136D5081996-01-18018 January 1996 SALP for 940102-960106,SALP Board Meeting 960118 ML20136D9441996-01-10010 January 1996 Morning Rept 2-96-0003:on 960109 Licensee Announced Reassignment of DA Sager to Position of Vice President of Nuclear Assurance Due to Retirement of Je Gieger ML20136E0251995-11-0303 November 1995 Morning Rept 2-95-0092:licensee Announced,Nov 2,layoffs of 25 Employees at Plants in Fort Pierce,Fl & Nov 1 of 40 Employees at Plants in Florida City,Fl & Corporate Headquarters ML20136C7551995-09-30030 September 1995 Plant Status Rept for St Lucie,Units 1 & 2 ML20136E2341995-08-23023 August 1995 Morning Rept 2-95-0072:D Sager Announced Listed Mgt Changes to Be Effective 950822 ML20137K8641995-03-31031 March 1995 Plant Status Rept for Mar 1995. W/Related Info ML20136E2551995-01-0505 January 1995 Morning Rept 2-95-0004:licensee President Frank Resigned on 950104 & J Broadhead Will Assume Frank Duties on Iterim Basis ML20134N0201994-12-16016 December 1994 Partially Deleted Rept of Interview, W/Nj Hallenbeck on 941215 ML20137R9601994-10-31031 October 1994 Plant Status Rept for St Lucie,Dtd Oct 1994 ML20136D4761994-10-31031 October 1994 Plant Status Rept for St Lucie ML20137R9671994-08-31031 August 1994 Plant Status Rept of St Lucie, ML20134M9901994-08-25025 August 1994 Partially Deleted Rept of Interview, W/Nj Hallenbeck on 940823 ML20136E2711994-08-0808 August 1994 Morning Rept 2-94-0073:plants Announced That Listed Orgainzation Changes Will Become Effective 940901 ML20136C7141994-06-30030 June 1994 Plant Status Rept for St Lucie ML20138G4941993-10-31031 October 1993 Plant Status Rept for St Lucie,Units 1 & 2 ML20136E2831993-10-0101 October 1993 Morning Rept 2-93-0106:licensee Continues W/Corporate Cost Reduction Program,Including Nuclear Div.Staffing Reductions Being Announced Effective 931001 ML20136E3071993-09-20020 September 1993 Morning Rept 2-93-0096:mgt Changes Have Been Announced Affecting Licensee Organization & Plant Site,Effective 931001 ML20136C6641992-07-24024 July 1992 Plant Information Book,Vol 1-Emergeny Response,Units 1 & 2 ML20058A3561990-10-16016 October 1990 AEOD/T90-14, Seal Problems in Boric Acid Transfer Pumps ML20245B6061988-08-31031 August 1988 Inadequate NPSH in HPSI Sys in Pwrs, Engineering Evaluation Rept ML20212B0321986-12-17017 December 1986 Emergency Diesel Generator Component Failures Due to Vibration, Engineering Evaluation Rept ML20148P6001980-12-24024 December 1980 Discusses Followup Study Re Degradation of Internal Appurtenances in LWR Piping During Normal Plant Operation & Potential Effects When Degraded Appurtenances Are Subj to Accident Loads.Recommends Review of Recurrent Problems ML20125C6611979-09-17017 September 1979 NRC Evaluation of Failure of Reactor Coolant Pump Seals Following Station Blackout 1996-08-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr 1999-09-30
[Table view] |
Text
l PRIORITY ATTENTION REQUIRED MORNING REPORT REGION II AUGUST 8, 1994 Licensee / Facility: Notification:
Florida Power & Light Co. MR Number: 2-94-0073 .
Saint Lucie 1 2 Date: 08/08/94 Florida Dockets: 50-335,50-389 l PWR/CE,PWR/CE Florida Power & Light Co.
Turkey Point 3 4 ,
Miami, Florida l Dockets: 50-250,50-251 l PWR/W-3-LP,PWR/W-3-LP j Subiect: ORGANIZATION CHANGES 'j Discussion:
St. .Lucie and Turkey Point announced that the following organization changes will become effective on September 1, 1994. ,
1 C. A. Pell, current St. Lucie Services Manager, will become St. Lucie l Outage Manager and will report directly to the Sjte Vice President.
C. D. Scott, current St. Lucie Outage Manager, will report to Mr. Pell. I J. A. West, current St. Lucie Operations Supervisor, will become St. Lucie Services Manager.
C. H. Wood, current St. Lucie Assistant Operations Supervisor, will !
become St. Lucie operations Supervisor.
L. L. McLaughlin, current St. Lucie Licensing Manager, will be on the St..Lucie Steam Generator Replacement Project team, reporting to R. Sipos.
R. E. Dawson,. current St. Lucie Maintenance Manager, will become St. Lucie Licensing Manager.
'J . Marchese, current Turkey Point Construction Services Manager, will become St. Lucie Maintenance Manager. The Turkey Point Construction-Services organization will become part of the Turkey Point Maintenance Department, reporting to M. B. Wayland, Turkey Point Maintenance Manager.
Reaional Action: ;
i Resident Inspectors will monitor the effectiveness of these changes.
Contact:
R. SCHIN (404)331 5561
l
. .i-9703130161 970306 C PDR FOIA ,
' BINDER 96-485 PDR -
_ -___- __ __-__- -___ __ ____