ML20203M668

From kanterella
Jump to navigation Jump to search

Forwards SER Re TR CENPD-199-P,Rev 1-P-A,Suppl 2-P, CE Setpoint Methodology Proposing CRGR Review Be Waived IAW Suggested Procedures in 890929 Memo
ML20203M668
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 02/23/1998
From: Collins T
NRC (Affiliation Not Assigned)
To: Sheron B
NRC (Affiliation Not Assigned)
Shared Package
ML20203M671 List:
References
TAC-M99684, NUDOCS 9803090222
Download: ML20203M668 (2)


Text

  • tac oq

^

g* *, UNITED STATES s* j NUCLEAR REGULATORY COMMISSION W AsHINGToN. D.C. 20565-C001

% ,,,,,, February 23. 1998 MEMORANDUM TO: Brian W. Sheron, Acting Associate Director for Technical Review Office of Nuclear Reactor Regulation THRU: hGary M. Holahan, Director ~

M Division of Systems Safe and Analysis FROM: Timothy E. Collins, Chief Reactor Systems Branch g( )'

W Division of Systems Safety an & L Analysis SUB, LECT: WAIVER OF CRGE REVIEW FOR CENPD-199-P, REVISION 1 P-A, SUPPLEMENT 2 P (TAC NO. M99684)

REFERENCES:

Memorandum, E. L. Jordan to T. E. Murley, "CRGR Consideration of Topical Reports," September 29,1989.

Attached is the safety evaluation report (SER), prepared by the Division of Systems Safety and Analysis, in which we accept Topical Report CENPD 199-P, Revision 1 P-A, Supplement 2 P, "CE Setpoint Methodology" for referencing in licensing applications. We propose that the Committee To Review Generic Requirements (CRGR) review be waived in accordance with the suggested procedures in the memorandum referenced above.

CENPD-199-P, Revision 1 P A, Supplement 2-P, describes several proposed modifications to the NRC-approved ABB-CE setpoint methodology described in CENPD 199-P, Revision 1 P-A.

This methodology is used by ABB-CE to calculate limiting safety system settings for the local power density and thermal margin trip systems and limiting conditions for operation to assure that the specified acceptable fuel design limits are not exceeded during the design basis anticipated operational occurrences, We reviewed CENPD 199-P, Revisi.n 1-P-A, Supplement 2-P, and concluded that it provides appropriately conserntive, altemate methods which would be acceptable for referencing in licenso applications for ABB-CE plants with analog protection systems.

According to the CRGR charter, the CRGR should review all staff approvals of topical reports.

However, since the methodology described in this topical does not involve any new staff positions or interpretations beyond those already applicable to the affected licensees, we believe that CRGR review is not necessary.

r q; s ,

Contact:

LKopp, SRXB/DSSA 415-2879 q [ji%

9803090222 900223 PDR I -a REVCP NRCCRCR i CORRESPONDENCE PDR , k V' N- *m i

~. i \~

1.1. . ll lIl!. l'.ll.lll.! I.li e #

% nun w

) :-

B. Sheron 2 If you agree that a CRGR review is not'necessary, please indicate your agreement by signing below. Othenvise, we shall proceed with preparation of an appropriate CRGR package.-

Attachment:

As stated

/ original signed by/

Approved: CRGR review is not necessary.

DISTRIBUTION Central Files PUBLIC BSheron GHolahan SNewberry TCollins d

. SRXB R/F EWeiss

.LKopp PGEB R/F SMagruder SRXB:DS SR SA SRXB: DSS LKOPP/ EWJJ8S TECOLLtdS 2/f/98 2/0/98 2/lu98

DOCUMENT NAME
G:\ WAIVER.LK 1

e kj c

b^:D 4

s 1

4

._. . . _ - .