IR 05000335/1997005

From kanterella
Jump to navigation Jump to search
Forwards Allegation Evaluation Rept & NRC Insp Repts 50-335/97-05 & 50-389/97-05 Re RII-97-A-0116
ML20202E045
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 07/17/1997
From: Landis K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Demiranda O
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20202D981 List:
References
FOIA-97-484 50-335-97-05, 50-335-97-5, 50-389-97-05, 50-389-97-5, NUDOCS 9802180055
Download: ML20202E045 (14)


Text

.y

t . UNITED STATES '

  1. p f E8%g NUCLEAR REGULATORY COMMISSION

. jo,, ,

f 8, n REGION tl J 61 Fon$ r4 STREET SW TE 23TB$

uwnA.oEonoiA so3o3

%,, * * ", * /

July 17. 1997 .

MEMORANDUM FOR: Oscar DeMiranda Senior Allegation Coordinator Enforcement and Investigation Coordination Staff FROM: Kerry D. Landis. Chief n / //.

Reactor Projects Branch 3 g gA Division of Reactor Projects SUBJECT: Ril 97 A-0116 - FOREIGN MATERIAL EXCLUSION MONITORING INSUFFICIENT-  ;

'

The Division of Reactor Projects performed a review and independent inspection of this anonymous concern. Our inspection regarding this matter has been completed and our inspection findings were documented in tne enclosed NRC Inspection Report 50 335.389/97-05, paragraph 03.1.

Based on the information provided. concern I was substantiated and a violation of regulatory requirements was identified and cited in Enclosure 2. Concern 2 was unable to be substantiated. Concern 3 was determined not to be an allegation. '

This concludes the staff's activities regarding this matter. These allegations are considered closed, if you have any questions regarding this matter, please contact me.

Enclosures:

1. Allegation Evaluation Report 2. NRC Inspection Report 50 335.389/97 05

.

i 9902160055 990121 T 484 PDR D- l" * *

,

_ _ _ _

_ ._ _ _ _ __ _ _ _ . - . - . . _ _ . _ _ _ -

_ _ _ _ _ _ _ _ _ _ _ __

c

.

ALLEGATION EVALUATION REPORT ALLEGATION RI! 97 A 0116 00ALIFIED AND TRAINED FME MONITOR NOT STATIONED AT UNIT 2 CONTAINMENT ST. LUCIE NUCLEAR PLANT DOCKET NO. 50 335, 389 CONCE.;N 1: A " qualified and trained" Foreign Material Exclusion Monitor was not stationed at the entrance to the to the Unit 2 containment although it was considered a FME zone at that time.

DISCUSSION: The following findings were documented in NRC Ins)ection Report 50 335.389/97-05.

the Unit 2 Containment paragga h 03.1. Foreign Material Exclusion ( ME) Control of j1 ding.

03.1 oreinn Material Exclusion (FME) Control of the Unit 2 Containment 3uildina (7D9].),

a. Inspection Scope The inspector reviewod the FME controls associated with control of material being used inside the Unit 2 containment building during the refueling outage after the containment closeout was complete. This inspection consisted of a review of the FME log, discussions with FME monitors, and Quality Instruction 0113 PR/PSL 2. Revision 29.

" Housekeeping and Cleanliness Control Methods."

b. Observations and Findings At the end of the Unit 2 refueling outage. the containment building was ,

controlled as an FME area. On May 23, 1997, the insnector reviewed the FME log book' associated with the containment building, inside the book were instructions Uhich stated that With the exception of maintenance personnel working on the Reactor Drain Tank / Containment Sump Project all other personnel shall complete the FME log. Health Physics personnel (later changed to Security) shall man the FME log desk and ensure that the log is completed for )ersonnel entering and exiting the RCB, Maintenance personnel worting on the Reactor Drain Tank / Containment Sump Project are not required to comply with the FME log requirements since a FME walk down of the work area will be performed at the completion of theproject." Also in the log book, were log sheets indicating the material that was taken into and out of containment.

On May 29. after the containment was closed cut and t! FME erea released, the inspector reviewed these log sheets and . .ed several items that had not been logged as having been removed from the

-

containment. These items included: pacer, safety belt, paperwork. pen.

tape, bolts, radio with ear muffs. rub)er suit. flashing light, clearance tags. miscellaneous hand tools, pipe wrench, five flashlights, crescent wrench, one bottle of snoop, and a gauge. in addition.

Enclosure

,

-. - _ _ - - - _ . _ - . .. -- .- -- - .-

, c>

i

. .

'

l nineteen individuals signing in on the log failed to sign out upon i exiting.

The inspector discussed the instructions listed in the FME log with various licensee management stating that these instructions did not 1 agree with the site procedure for control of FME. The licensee sto:?d l

that it was not their intention to maintain the containment as en f i l area as defined in the 01. Their philosophy was that after the sump i work was complete the entire area would be inspected and any remaining items would then be removed. Therefore it- was not necessary to log all items entering into this particular area. However, they did require that personnel not working on the sump job complete the FME log. The ins)ector noted that the entrance to the containment was identified as an ME area, that an FME log was established to control material entering and exiting the area, and that an FME monitor 'as established.

Procedure 01 1? PR/PSL-2. Section 5.5. stated, in part, that for Quality Group B systems and components. "if an FME Control Area is required the control area and controls shall be established prior to opening the system or

REGION 11 E o 101 MARIETTA STREET, N.W.. SUITE 2900 D j ATLANTA, GEORGIA 303234190

%

4.....$

Report Nos.: 50-335/94-21 and 50-389/94-21 Licensee: Florida Pwer and Light Company 9250 West Flagler Street Miami, FL 33102.

Docket Nos.: 50-335 and 50-389 License Nos.: DPR-67 and NPF-16 Facility Name: St. Lucie Plant Units 1 and 2 Inspection Conducted: September 26 - 30, 1994 Inspector: [lhh b b W. Tobin,iSenior Safegeacds llatpector L

/d W 'f[

Date Signed Accompanying Personnel: L. Stratton, Safeguards-Inspector Approved by: - -

( .

( 4 !'dY V D. R. McGuirek Qhief /Q ' Date Signec Safeguards Secffon

-

Nuclear Materials Safety and Safeguards Branch Division of Radiatien Safety and Safeguards SUMMARY Scope:

This routine, unannounced inspection was conducted in the areas of the Safeguards Program for Nuclear Power Reactors, specifically, the Security Organization, Quality Control Audits, Access Controls, Records and Reports, and Licensee Event Report (LER) No. 594-001.

Results:

In the areas inspected, violations or deviations were not identified. With respect to the inspected areas, the licensee continues to have an effective and well managed Safeguards Program. The security force is adequately staffed, audits appear thorough, access controls are dependable, and records and reports are timely and accurate. LER No. S94-001 was closed, heument transmitted hefewtfi

Mtams senstrwe unclasched
  • PSrmatm When stocrated I'DM d ~ ~ ' ""~'"""~"~'

mAFEGUARDS !NFORM ATION

, 9

- _ _ _ _ _ - _ _ _ _ _--_

.

  • '

UNITED STATES

[p cfog% NUCLEAR REGULATORY COMMISSION p* -* i , r,EGloN li g 's*' S 101 MARIETTA STREET, N.W,. SUITE 2900 g (j ATLANTA, GEORGIA 3332Ml99

%, a

%, .....f July 26, 1996 EA 96-236 & EA 96-249 Florida Power & Light Company ATTN: T. F, Plunkett President - Nuclear Division P. O. Box 14000 Juno Beach, Florida 33408-0420 SUBJECT: NRC SPECIAL INSPECTION REPORT 50-335/96-12, 50-389/96-12 Dear M