ML20136E491

From kanterella
Jump to navigation Jump to search
Forwards Updated Schedule for St Lucie FY1
ML20136E491
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 11/13/1996
From: Mark Miller
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Julian C, Son Ninh
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17229A261 List: ... further results
References
FOIA-96-485 NUDOCS 9703130219
Download: ML20136E491 (8)


Text

(

i

.. O i

From:

Mark Miller, f.Z4 i

b N N h kll

=To: '

CAJ, SON CIV I # 8 4.1 I

8 j

Date:

11/13/961:53pm -

Subject:

Updated St. Lucie Schedule FYI t

1 4

i 970313021997b306-4

-PDR FOIA

'/-

. BINDER 96,483 PDR zg j

.j-y Sunday Monday Tuesday

- Wednesday Thursday j

j 3

4 5

6 7

  • Fred Whght
  • SSFl Bagman
  • SSFl Beginan
  • Fred Wnght
  • SSFlBagman
  • Fred Whght
  • Fred Wnght
  • Mark on Leave i

e

  • Mark on Leave
  • Mark on Leave
  • Mark on Leave
  • Sanden Here
  • Branch Call
  • Sandin Here
  • Sandin Here
  • JoeUDave at TTC
  • Sande
  • JoeUDave at TTC
  • JoeuDave at TTC i
  • Joel/ Dave at TTC 10 11 12 13 14
  • St Luoe CAP 6n ADanta
  • VETERAN'S DAY CW f

17 18 19 20 21

  • Joel at McGuire a Joel at McGuire
  • Joel at McGuire
  • Joel at McGuire
  • Caudie Juhan
  • Mark to HQ
  • Fred Wnght
  • Fred Whght
  • Fred Wnght
  • Fred Wnght

, ssp l

  • Branch Call
  • News Conf

, 33p,

  • SSFl
  • SSFi 1

l 24 25 26 27 28

  • Dave on n
  • Start 96-20
  • Joel on Leave
  • THANKSGMNG
  • n on t-.
  • Joel on Leave 6

J e

9 s

i

,, ~

n.

f

.-s-

r Sunday Monday Tuesday Wednesday Thursday 1

2 3

4 5

  • Weens /Shearon
  • ResKlent Meeting
  • Resdent Meeting
  • Resdent Meebng
  • Cayne (requal)
  • Joelin DC tranng
  • Joelin DC Tranng
  • Cayne (requal)
  • Dave on Leave.
  • Cayne (requal)
  • Cayne (regual)
  • Hopper (Site Coverage)
  • Hopper (Srte Coverage)
  • Hopper (Site Coverage)
  • Hopper (Site Coverage)
  • Fred Wht
  • Fred Wnght
  • Fred Wnght
  • Fred Wnght

, 337,

  • Branch Call
  • News Conf.

,337,

  • SSFi

.SSFl 8

9 10 11 12

  • Branch Call
  • Enforcement Conference a Joel onleave
  • Joel on Leave

~

  • SSF)
  • SSFl
  • S$Fi 4

t 15, 16 17 18 19 I

  • Joel to RI
  • Joetm R1
  • Mark Leave
  • News Conf d

22 23 24 25 26

  • Mark Leave
  • CHRISTMAS
  • Mark Leave a

5

  • Branch Call 29 30 31
  • Mark Leave i
  • Branch Call 9

9 9

~.

...~ '

9 Sunday Monday Tuesday' Wednesday Thursday I

j 1

2

  • NEW YEARS
  • Mark Leave i

i 5

6 7

8 9

r

  • 40500inspechon
  • 40500 bem
  • 40500 inspecten a 40500 inspecta 3
  • SSF1
  • SSF1
  • f SFi 12 13 14 15 16 i

i 7

l 19 20 21' 22 23

  • Joel on Rotatuit (pionned)
  • Joel on Rotshon (planned)
  • Joel on Rotshon (planned)
  • Joel on Rotation (pionned) 4 J

a f

i-26 27 28 29

.30

  • Joel on Rotebon (pionned)
  • Joel on Rotshon (pionned)
  • Joel on Rotebon (pionned)
  • Joel on Rotebon (planned) 5 i

i.

g 4

d

.Je d

t h

a I

a t

i 4

8

4 1

i

'i i

Sunday Monday Tuesday Wednesday Thursday

]

l i

l

)

s l

2 3

4 5

6

  • Son Here
  • Son Here
  • Son Here a Son Here

= Mark at TTC

  • Len on 50 59
  • Len on 50.59
  • Len on 50.59
  • Len on 50.59
  • Joel on Rotebon (planned)
  • Joel on Rotebon (planned)
  • Joel on Rotabon (planned)
  • Joel on Rotabon (planned)

+

9 10 11

.12 13

  • Joel on Rotabon (pionned)
  • Joel on Rotabon (planned)
  • Joel on Rotebon (planned)
  • Joel on Rotebon (planned) 16 17 18 19 20 1
  • Joel on Rotebon (planned)
  • Joel on Rotabon (planned)
  • Joel on Rotabon (planned)
  • Joel on Rotabon (planned)

=

I 23 24 25 26 27

  • Joel on Rotabon (planned)
  • Joel on Rotabon (planned)
  • Joel on Rotabon (planned)
  • Joel on Rotshon (planned) l e

I i

4 J

5 4

f-

e,

~. - -

i-a

'W D

c j

Sunday.

Monday.

Tuesday Wednesday Thursday

(

i e

2 3

4 5.

6 a Joel on Rosebon (pionned)

  • M on Rotebon (p6enned).

. Joel on Rotebon (planned)

  • Joel on Rotebon (pionned)

I 9

10 11 12 13 I

Joel on Rotshon (pionned)

  • Joel on Rotebon (pionned)

. Joel on Rotebon (pienned)

  • Joel on flotebon (pienned) t 16 17 18 19 20

?

I 23 24 25 26 27 9

30 31 1.

\\

)

h i

e i

i i

4 r

e a

4

.m y

y-

-$,--~~

-.4--ee e

r-

- * * - ~,. * * - - ~

P

~

s 1

4.

Sunday Monday Tuesday Wednesday Thursday 1

2 3

6 7

8 9

10 13 14 15 16 17 l

20 21 22 23 24 1

27 28 29 30 s

6 D

e

w WEEKLY. BRANCH CHIEF STATUS REPORT BRANCH 3-SIGNATURE Kerry D. Landis DAT(,11/14/96

. PLANT ISSUES / EVENTS:

-a)

'St Lucie? Both units operated at 100% for the entire week.

~

b)

Turkey Point - Both units operated at.100% for the entire week.

c)

Crystal River. -- FPC revised plans to remain shutdown until the end of February.1997.

SIGNIFICANT INSPECTION FINDINGS / INITIATIVES:

j a).

Crystal River - The. Restart panel met on 11/13/96 to prepare the restart check list and action plan in accordance with MC 0350.

P b):

.. Crystal Rive'r - MCAP 11 meeting was held in Region II oli 11/14/96.

c)

St Lucie - The EP. inspection identified potential multiple violations. The-vfolations-were in the areas of timely activation of response facilities.. training of response personnel and corrective actions.

The enforcement panel determined this week that these' violations will be the topic of an enforcement conference on 12/10/96.

NRC questioned FP&L this week whether or not their emergency plan requires that each responder has to have participated in a site specific drill prior to being placed on

.the responder list.

After a conference call. FP&L agreed to provide NRC a submittal by.11/20/96 to clarify their position on this issue.

d)

No new'FSAR discrecancies were identified this week.

NRC PERSONNEL ISSUES / STATUS:

a)

Credit Hours authorized: None b)

A' solicitation of interest 'was issued for another Crystal River RI position.

LSSUES/ ACTIVITIES EXPECTED NEXT WEEK:

11/19/96 - Briefing of EDO on the CR EDG overload and the EFW modification outside design basis issues.

11/22/96

.J. Jaudon will brief CR onite of the results of the CR Restart Panel-4 4

4 I

O i.