ML20137J351

From kanterella
Revision as of 22:23, 30 June 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Brief Affirming ASLB 850719 Decision Denying Jf Doherty 850629 Request for Hearing & Petition for Leave to Intervene in OL Amend Proceeding
ML20137J351
Person / Time
Site: Pilgrim
Issue date: 08/27/1985
From: Dignan T
BOSTON EDISON CO., ROPES & GRAY
To:
NRC OFFICE OF THE SECRETARY (SECY)
Shared Package
ML20137J355 List:
References
CON-#385-369 OLA, NUDOCS 8508300261
Download: ML20137J351 (1)


Text

._ _ _ _ _ _ _ _ - _ _ _ _ _ . _ _ _

9(J3 ROPES & GRAY 225 FRANKLIN STREET BOSTON, MASSACHUSETTS O2110

  • O he 1 M SHiNGTON Tetta NumetR 94cS19 20PGRaton a*,N 000 TwtNiv-SEC ND STREET, N W.

TCLc3 NUM8th 956973RCPES GRav 85N WASHINGTON, O C 20037 f tLCCCPiCRS- (6t?) 423-2377 (si7) 423-7 e de e or' a9 o g} p i%v t R% ATionat-<eit) 423-690s CLECdM'Ew.aoa! h- 9 August 27, 1985 , .

DGCKDi::6 390f:

BRANCH Office of the Secretary U.S. Nuclear Regulatory Commission Washington, DC '0555 ATTENTION: Public Proceedings Branch Re: Boston Edison Company (Pilgrim Nuclear Power Station, Unit 1) Docket No. 50-293cLA License Amendment (0.95 K-eff)

Dear Sir:

Pursuant to the Commission's Rules and Regulations, there are enclosed herewith for filing in the above-entitled matter one signed and two conformed copies of Licensee's Brief with Certificate of Service attached.

Very truly yours,

/

Thomas G. Dignan, Jr.

TGDJr/kdr Enclosures i

B508300261 B50827 PDR ADOCK 05000293 O PDR

. - _ _ _ _ _ _ - _ _ _ _ . _ _ _ _ _ _3_S03 _ -A