FOIA Request for Info Re Records of Votes Taken by Commission & Records or Transcripts of Commission Meetings Re Shutdown or Restart on or After 860412,SECY Papers & Listed Records Prepared or Dtd After 800101
ML20151V967
Person / Time
Site: Pilgrim
Issue date: 03/25/1988
From: Johnson G
SWIDLER & BERLIN
To:
NRC
References
FOIA-88-198 NUDOCS 8808230107
Download: ML20151V967 (3)


Text

w SW'lDLER & BERLIN momm vrp., K STREET. N W ain ,=

TA9C.GTON. D C. 20m' )S46 m:, w4 m TIllI 41lll Il1JCOP'a .42 944 42%

March 25, 1988 FREEDOM 0F INFOS.MATION Director ET E EST .

Office of Administration U.S. Nuclear Regulatory Commission Fora .@.t t - / 9f Washington, D.C. 20555 b DUN In re: Freedom of Information Act Request No. 88 __, Concerning Pilgrim Nuclear Power Station

Dear Sir:

In accordance with the provisions of the Freedom of Information Act, 5 U.S.C. 5552 and Part 9, Subpart A of 10 C.F.R., it is requested that the records identified below be made available for inspection and copying:

1. Records of any votes taken by the Commission, and records or transcripts of Commission meetings, with respect to the shutdown of the Pilgrim Nuclear Power Station, or the restart thereof, on or after April 12, 1986.
2. All SECY papers, attachments thereto, records and other materials supporting or forming the basis for positions j taken therein on the subject of the Pilgrim Nuclear Power Station, prepared on or after January 1, 1980.
3. All records prepared or dated on or after January 1, 1980 l (but excluding documents included on Docket No. 50-293 l accession listings available from the Public Document Room) of NRC Region I, the Office of the Executive Director for Operations, the Office of Inspection and Enforcement, the Office of Investigations, the Office of Nuclear Reactor  ;

Regulation, the Office of Nuclear Materials Safety and Safeguards, the Advisory Committee for Reactor Safeguards, the Office for Evaluation of Operational Data, and the NRC Emergency Operations Center which discuss, refer to, take positions on, or form the basis for decisions concerning, the performance of the Pilgrim Nuclear Power Station in :he following areas:

{

l 8808230107 880325 )

PDR FOIA i JOHNSON 88-190 PDR j l

i

f A. Management B. Staffing C. Organization and Organizatic.- Structure D. Radiation Protection E. Quality Assurance F. Surveillance G. Maintenance H. Offsite Emergency Planning I. Fire Protection J. Security

y. Management Response to NRC Ft:ulatory Activities
4. All records of Region I, the Office of Suclear Reactor Regulatica, the Commission, the Offic Of Ir.spect. ion and Enforcement, or other Staf f or Commission of fices relating to, discussing or forming the basis or support for, the Director's Decision (DD-87-14) dated A.: gust 21, 1987.
5. All records (other than those categories of documents excluded f rom Item 3) of any office referred to in Item-4, above, discussing, describing, assessi..g, evaluating, or otherwise relating to actions by the EC staf f, FEMA, the ACRS, or other NRC or Commission of fices, to follow-up or monitor actions by Boston Edison Compa .y, the Commonwealth of Massachusetts, other jurisdictions within the 10-mile emergency planning zone for Pilgrim N:: lear Power Station, to address issues raised in the Direct:r's Decision (DD 14) dated August 21, 1987.
6. All records of the NRC of fices referred to in Item 4 discussing, describing, assessing or e taluating, or otherwise relating to actions of the EC staf f to evaluate the July 1987 Restart Plan, and other actions by Boston Edison Company, its agents or contractors, relating to the restart of the Pilgrim Nuclear Power E ation.
7. All records of communications (whether written or oral and occurring from April 12, 1906 to the present) between any of fice of the NRC Staf f, or of the Co.: .ission or of fices reporting directly to it, and Boston Edison Company, concerning the status or startup of the Pilgrim Nuclear Power Station.
8. All records of communications (whether written or oral, and occurring from April 12, 1986 to the present) between any of fice of the NRC Staf f or of the Comnission or of fices reporting directly to it, and FEMA, other Federal or State agencies or governmental entities, or persons concerning the status, startup, or issues relating te startup, of the Pilgrim Nuclear Power Station.

3.-

9. All records in the possession of any NRC Staf f or Cor. ission office pertaining to (a) the evaluation by PEMA, NRC,.cr any other entity or agency, of the adequacf of'offsite energency plans for the Pilgrir. Suclear Power Station, and.!b) the conduct and/orfevaluition of drills, full scale / full participation or partial scale / partial participation exercises conducted or planned for the Pilgrim Nuclear Power Station. ,

For purposes of this request, "record" or "document" is defined to include, but nc: be limited to, notes, memoranda, reports, meeting minutes, legs, transcripts, letters, pesi:;on or policy papers, interpretations of requirements, and guidar.ce documents, and refers to draf ts as well as any final versi r.' of any record or document requested.

Sinc ly, 6 / Kk eE Jo son, Esq. l (202)944-438 '

1 GEJ/veg l

i l