ML20141A181

From kanterella
Revision as of 07:54, 27 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Informs That TC Elsasser Will Replace EC Mccabe as Cognizant Section Chief for Facility on 860331 Based on Realignment of Projects at Region I Ofc.Author Will Remain Cognizant Branch Chief
ML20141A181
Person / Time
Site: MIT Nuclear Research Reactor
Issue date: 03/27/1986
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lisa Clark
MASSACHUSETTS INSTITUTE OF TECHNOLOGY, CAMBRIDGE
References
NUDOCS 8604040409
Download: ML20141A181 (2)


Text

r _

's -

a w-MAR 2 7195 Docket No: 50-20 Massachusetts Institute of Technology Research Reactor ATTN: Mr. Lincoln Clark, Jr.

Director of Reactor Operations 138 Albany Street

-Cambridge, Massachusetts 02139 Gentlemen:

Subject:

Projects Realignment in Region I The purpose of this letter is to. inform you that due to a realignment of projects within the Region I office, Mr. Thomas C. Elsasser will replace fic. Ebe C. McCabe as the cognizant Section. Chief for your' facility. Mr. Elsasser can be reached on 215-337-5378. I will retain responsibility as the cognizant Branch Chief. This realignment will become effective on March 31, 1986.

Sincerely, pinal signM.I' Edward C. Wenzinger, Chief Projects Branch No. 3 Division of Reactor Projects cc:

Dr. O. K. Harling, Director of the Reactor Laboratory Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

Commonwealth of Massachusetts (2) kop0 09 860327 P K O hPDR 20 1 80/

So \

- o i

Massachusetts Institute of 2 ggg g7 @

Technology Research Reactor bec:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

J. Grant H. Berkow, NRR f

'RI:DRP RI- bP :D P DN Elsasser 1

zinger.

Gt; ant /meo St ostecki 3)21/86 g7f g.g 0FF::CIAL RECORD COPY

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _