ML20141A181

From kanterella
Jump to navigation Jump to search
Informs That TC Elsasser Will Replace EC Mccabe as Cognizant Section Chief for Facility on 860331 Based on Realignment of Projects at Region I Ofc.Author Will Remain Cognizant Branch Chief
ML20141A181
Person / Time
Site: MIT Nuclear Research Reactor
Issue date: 03/27/1986
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lisa Clark
MASSACHUSETTS INSTITUTE OF TECHNOLOGY, CAMBRIDGE
References
NUDOCS 8604040409
Download: ML20141A181 (2)


Text

r _

's -

a w-MAR 2 7195 Docket No: 50-20 Massachusetts Institute of Technology Research Reactor ATTN: Mr. Lincoln Clark, Jr.

Director of Reactor Operations 138 Albany Street

-Cambridge, Massachusetts 02139 Gentlemen:

Subject:

Projects Realignment in Region I The purpose of this letter is to. inform you that due to a realignment of projects within the Region I office, Mr. Thomas C. Elsasser will replace fic. Ebe C. McCabe as the cognizant Section. Chief for your' facility. Mr. Elsasser can be reached on 215-337-5378. I will retain responsibility as the cognizant Branch Chief. This realignment will become effective on March 31, 1986.

Sincerely, pinal signM.I' Edward C. Wenzinger, Chief Projects Branch No. 3 Division of Reactor Projects cc:

Dr. O. K. Harling, Director of the Reactor Laboratory Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

Commonwealth of Massachusetts (2) kop0 09 860327 P K O hPDR 20 1 80/

So \

- o i

Massachusetts Institute of 2 ggg g7 @

Technology Research Reactor bec:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

J. Grant H. Berkow, NRR f

'RI:DRP RI- bP :D P DN Elsasser 1

zinger.

Gt; ant /meo St ostecki 3)21/86 g7f g.g 0FF::CIAL RECORD COPY

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _