ML20141A181
| ML20141A181 | |
| Person / Time | |
|---|---|
| Site: | MIT Nuclear Research Reactor |
| Issue date: | 03/27/1986 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Lisa Clark MASSACHUSETTS INSTITUTE OF TECHNOLOGY, CAMBRIDGE |
| References | |
| NUDOCS 8604040409 | |
| Download: ML20141A181 (2) | |
Text
r
's a
w-MAR 2 7195 Docket No:
50-20 Massachusetts Institute of Technology Research Reactor ATTN:
Mr. Lincoln Clark, Jr.
Director of Reactor Operations 138 Albany Street
-Cambridge, Massachusetts 02139 Gentlemen:
Subject:
Projects Realignment in Region I The purpose of this letter is to. inform you that due to a realignment of projects within the Region I office, Mr. Thomas C. Elsasser will replace fic. Ebe C. McCabe as the cognizant Section. Chief for your' facility.
Mr. Elsasser can be reached on 215-337-5378.
I will retain responsibility as the cognizant Branch Chief.
This realignment will become effective on March 31, 1986.
Sincerely, pinal signM.I' Edward C. Wenzinger, Chief Projects Branch No. 3 Division of Reactor Projects cc:
Dr. O. K. Harling, Director of the Reactor Laboratory Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
Commonwealth of Massachusetts (2) kop0 09 860327 P
K O h 20 PDR 1 80/
So \\
o Massachusetts Institute of 2
ggg g7 @
i Technology Research Reactor bec:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
J. Grant H. Berkow, NRR f
'RI:DRP RI-bP
- D P DN 1
Gt; ant /meo Elsasser zinger.
St ostecki 3)21/86 g7f g.g 0FF::CIAL RECORD COPY
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _